Hide thumbs Also See for Golden Gate GS10500 Series:

Advertisement

Quick Start Guide For Golden Gate™ ATR
Accessory P/N GS10500 Series
This Quick Start Guide is intended to help you through the steps required for the correct first time installation and
alignment of the Golden Gate™ ATR Accessory into your IR spectrometer system. This guide is a supplement to
the Instruction Manual provided for the accessory itself where more detailed information can be found.
Step 1 – Install the Benchmark™ Baseplate into your spectrometer
The Benchmark™ baseplate supplied allows the Golden Gate™ ATR Accessory to be
positioned correctly in the sample compartment of your specific spectrometer.
Please consult the relevant page of the Benchmark™ Baseplate Installation Guide
instruction manual (2I-549-000-7) if you need more information.
Step 2 – Fit the Golden Gate™ ATR Top Plate to the Optical Unit
For any Golden Gate™ ATR Accessory that is supplied, the ATR crystal
Top Plate assembly of choice (with diamond or germanium crystal option)
will normally already be fitted to the Optical Unit. If these parts are separate,
install the Top Plate onto the Optical unit using the two fixing thumbs screws.
(The Top Plate will only fit to the Optical Unit one way evenly and flat
with the stud and pin fix fixings on the Optical Unit passing correctly
through the slot and circular holes on the Top Plate.)
Top Plate Fixing
Thumb Screws
Step 3 – Fit the Golden Gate ATR Accessory (Optical Unit) to the Baseplate
The Golden Gate™ ATR Accessory can now be fitted onto the
Benchmark™ baseplate. The Optical Unit is placed over the
baseplate support pillars and the fixing thumb screw is
tightened into the central front pillar.
Fixing Thumb Screw of
Optical Unit to
Benchmark™ Baseplate

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Golden Gate GS10500 Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Specac Golden Gate GS10500 Series

  • Page 1 Quick Start Guide For Golden Gate™ ATR Accessory P/N GS10500 Series This Quick Start Guide is intended to help you through the steps required for the correct first time installation and alignment of the Golden Gate™ ATR Accessory into your IR spectrometer system. This guide is a supplement to the Instruction Manual provided for the accessory itself where more detailed information can be found.
  • Page 2 Step 7 – It’s Ready to Use! For safety information and detailed instructions on getting the best from your Golden Gate™ ATR accessory please refer to the Golden Gate ™ ATR Accessory instruction manual 2I-10500-17 supplied. Specac Ltd River House, 97 Cray Avenue, Orpington...

This manual is also suitable for:

Golden gate atr accessory

Table of Contents