Download Print this page

Advertisement

Quick Links

CBR-Test 50
24-9150

OPERATING INSTRUCTIONS

CBR-Test 50
24-9150
ELE International
Chartmoor Road, Chartwell Business Park
Leighton Buzzard, Bedfordshire, LU7 4WG
England
phone: +44 (0) 1525 249200
fax: +44 (0) 1525 249249
email: ele@eleint.co.uk
http://www.ele.com
ELE International, a division of Hach Lange Ltd.
In the interests of improving and updating its equipment, ELE reserves the right to alter specifications to equipment at any time.
Original Instructions
Distributor:
ELE International 2015
1
ELE International
Soiltest Product Division
PO Box 389, Loveland, CO 80539
USA
phone: +1 (800) 323 1242
fax: +1 (970) 663 9781
email: soiltest@eleusa.com
http://www.eleusa.com
9901X0237 Issue 5

Advertisement

loading
Need help?

Need help?

Do you have a question about the CBR-Test 50 and is the answer not in the manual?

Questions and answers

Summary of Contents for Ele CBR-Test 50

  • Page 1: Operating Instructions

    ELE International, a division of Hach Lange Ltd. In the interests of improving and updating its equipment, ELE reserves the right to alter specifications to equipment at any time.  ELE International 2015 Original Instructions 9901X0237 Issue 5...
  • Page 2 CBR-Test 50 24-9150 Contents Section Page Figure 1 Figure 2 Safety Introduction Specification Installation Controls Operation Maintenance Declaration of Conformity Noise Certificate WEEE Directive Original Instructions 9901X0237 Issue 5...
  • Page 3 CBR-Test 50 24-9150 COLUMN LOCKING NUTS CROSSHEAD ALIGNMENT STUDS ADJUSTMENT NUTS LOAD RING PENETRATION PISTON PENETRATION DIAL GAUGE STABILISING SURCHARGE WEIGHTS CBR MOULD PLATEN DOWN-OFF-UP MAINS POWER SWITCH LIGHT FIGURE 1 Original Instructions 9901X0237 Issue 5...
  • Page 4 CBR-Test 50 24-9150 Figure 2 Original Instructions 9901X0237 Issue 5...
  • Page 5 CBR-Test 50 24-9150 Safety This equipment has been tested by ELE International and is safe to use providing that the proper safety precautions are observed: Do not use this equipment in any manner, other than as specified in this user manual;...
  • Page 6 CBR-Test 50 24-9150 A ball seated screw fitting located on the crosshead accepts ELE load rings and load transducers up to and including 50 kN. A socket at the rear of the machine provides a connection for the Electronic Control and read-out Unit (DSU) for use when transducers to record load and displacement are required.
  • Page 7 3 or four turns. This will then set the platen at approximately the suggested height. Fit an ELE load ring (or load transducer if using in conjunction with the DSU) of the desired capacity to the crosshead. Position the crosshead at the height required by firstly slackening the nuts on either side above the crosshead and then adjust the crosshead to the required height by using the adjustment nuts below the crosshead.
  • Page 8 CBR-Test 50 24-9150 To ensure stability and central location of the penetration piston, the stability bar must always be used. When using the maximum number of surcharge weights, it may be necessary to clamp the stabilising bar to the threaded part of the columns. In this case it is recommended that packing pieces (i.e.
  • Page 10 Date of Test: 1 November 2001 Approved Signatory We, ELE International, Chartmoor Road, Chartwell Business Park, Leighton Buzzard, Beds, LU7 4WG, England declare under sole responsibility that the following product(s) to which this declaration relates is (are) in conformity with the provisions of: 89/392/EEC, 91/368/EEC, 93/44/EEC and 93/68/EEC Machinery Directive implemented in the U.K.
  • Page 11 DIRECTIVE ON WASTE ELECTRICAL & ELECTRONIC EQUIPMENT (WEEE)