EIJKELKAMP 09.06 Operating Instructions Manual

Rainfall simulator

Advertisement

Quick Links

OPERATING INSTRUCTIONS
A
B
C
Contents
On these operating instructions ....................................................................................................................... 2
1 Description .................................................................................................................................................. 2
1.1
Rainfall simulator .............................................................................................................................. 2
1.2
Accessories ....................................................................................................................................... 3
2 Technical specifications ............................................................................................................................... 4
3 Safety instructions ...................................................................................................................................... 4
4 Calibration .................................................................................................................................................. 4
5 Installation .................................................................................................................................................. 6
.................................................................................................................................................... 6
7 Application .................................................................................................................................................. 6
8 Troubleshooting........................................................................................................................................... 6
9 Maintenance ............................................................................................................................................... 7
P.O. Box 4, 6987 ZG Giesbeek, NL
T
+31 313 880200
F
+31 313 880299
E
eijkelkamp@eijkelkamp.com
© March 2005
09.06 RAINFALL SIMULATOR
www.eijkelkamp.com
1
M1.09.06.E

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 09.06 and is the answer not in the manual?

Questions and answers

Summary of Contents for EIJKELKAMP 09.06

  • Page 1 OPERATING INSTRUCTIONS 09.06 RAINFALL SIMULATOR Contents On these operating instructions ........................2 1 Description ..............................2 Rainfall simulator ..........................2 Accessories ............................3 2 Technical specifications ..........................4 3 Safety instructions ............................4 4 Calibration ..............................4 5 Installation ..............................6 6 The use ..............................
  • Page 2: On These Operating Instructions

    On these operating instructions If the text follows a mark (as shown on the left), this means that an important instruction follows. If the text follows a mark (as shown on the left), this means that an important warning follows relating to danger to the user or damage to the apparatus.The user is always responsible for its own personal protection.
  • Page 3: Accessories

    Sprinkler The sprinkler (A) consists of a calibrated cylindrical reservoir (3) with a capacity of approximately 2300 ml, which is in open connection with the sprinkling head. The waterlevel can be read on the reading pipe (10) which is closed using a plug (9).
  • Page 4: Safety Instructions

    Transport case Outside dimensions: 60 x 48 x 40 cm Sprinkler Dimensions: 330 x 330 mm Capillair Length: 10 mm ± 1 mm Diameter: 0.6 mm ±0.08 mm Material: Glass Adjustable support Two waterlevels included, dimension: 305 x 305 mm Ground frame Aluminium Dimension: 345 x 320 mm...
  • Page 5 11.Adjust the rainfall intensity using the aeration pipe (2). The distance (h, see figure page 2) between the reservoir and the upper side of the aeration pipe has to be set depending on the measured water temperature. For a rough indication of the correct setting, the following formula can be used. h = 100 mm –...
  • Page 6: Installation

    Installation 1. Select the soil plot area. Leave the soil plot unimpaired. 2. Install the ground frame (C) using the four nails. A waterproof connection between the soil and the ground frame (C) can be made using clay. 3. Fill the soil wetting jar with water and place the lid. 4.
  • Page 7: Maintenance

    Technical data can be amended without prior notification. Eijkelkamp Agrisearch Equipment is not responsible for (personal) damage due to (improper) use of the product. Eijkelkamp Agrisearch Equipment is interested in your reactions and remarks about its products and operating instructions.

Table of Contents