STEP-BY-STEP GUIDE
1. Using extendable arms wheel the power
pack into place about 1 metre away from
the borehole location.
3. Attach legs at all four corners of the rig
and secure with pins provided.
COMPETITOR 130 (Standalone model)
2. Position the slip bowl of the rig over the
borehole location.
4. Level the rig by screwing the feet onto
the load bearing plates. The mast must be
vertical for correct operation. Tools may
become stuck in borehole if mast is
inclined at an angle.

Advertisement

loading

Summary of Contents for Archway COMPETITOR 130

  • Page 1 STEP-BY-STEP GUIDE COMPETITOR 130 (Standalone model) 1. Using extendable arms wheel the power 2. Position the slip bowl of the rig over the pack into place about 1 metre away from borehole location. the borehole location. 4. Level the rig by screwing the feet onto 3.
  • Page 2 5. Remove the safety pin from the slide to 6. Apply grease to the slide before each enable the weight to slide freely. use of the rig. This increases the life of the (Remember to replace this when brass slides on the weight. transporting the rig) 8.
  • Page 3 9. Check Engine Oil Level before starting 10. Check Hydraulic Oil Level before the engine. starting the engine. 12. This picture shows the rig with the 11. Start the engine following the Carriage raised to its uppermost position. instructions in the separate Engine Manual and raise the Carriage to its uppermost position using the Left-hand lever on the Control Block.
  • Page 4 USING THE CONCRETE CORING ATTACHMENT 13. Assemble the Coring Unit by attaching 14. Attach the Coring Unit onto the rig at the Concrete Coring Bit via the threaded the base of the anvil. Connect the 1-1/4" UNC connection. hydraulic hoses leading from the Right- Hand side of the control block onto the snap-on couplings of the Coring Unit.
  • Page 5 17. Start rotating the core bit by engaging 18. Lower the carriage fully using the Left- the Right-hand lever on the control block. hand lever on the control block so that its weight is bearing down fully on the core bit.
  • Page 6 SOIL SAMPLING USING THE PLASTIC LINER SYSTEM 21. Assemble the sample tube by inserting the plastic liner and retaining shoe, and 22. Position the sample tube under the rig attach the cutting shoe. with the cutting shoe resting on the ground.
  • Page 7 25. To extend the depth of the sample use 26. Drop the empty sample tube down the the extension rods provided. The first rod hole and attach the rod to the top of the used must be the STARTER ROD which sampler tube, with the male thread facing is 60 mm shorter than the standard rods.
  • Page 8 USING THE SIMULTANEOUS CASING SYSTEM 29. The Casing System is designed for casing the borehole whilst simultaneously driving a sample tube into the ground. The 101 mm Sample tube is designed to fit inside the 115 mm OD Casing.
  • Page 9 30. Attach the casing shoe and the casing 31. Place the Drive Ring into the top of the drive head to the casing. Place the 101mm casing, add the spacer tube and screw the Sampler inside the casing. bottom adaptor onto the top of the sample tube 32.
  • Page 10 34. Use the hydraulic cylinder to extract 35. After extracting the sample tube, the sampler. The casing stays in place in remove the sample from the tube and the ground. replace with a new plastic liner. 36. Drop the empty sampler down the hole 37.
  • Page 11 38. Attach the casing drive head, and drive 39. Drive down the sampler and second ring (the spacer tube is not required after length of casing for another metre. the first metre). Connect to the rig using the bottom adaptor. 41.
  • Page 12 42. Withdraw the casing from the ground and secure with casing slips before uncoupling. 43. It is possible to sample the ground below the level of the installed casing by reducing the size of the sampler from 101 mm to 92 mm or smaller.