Zenith ZVM-121 Service Manual page 10

Table of Contents

Advertisement

Page 3-2
ON/OFF CONTROL (SX201)
This SPST switch is secured to a mounting bracket by
two twist tabs. To remove it, first remove the switch
knob, and then remove the bracket from inside the
cabinet. With pliers, twist the two twist tabs to free the
switch. See Figure
3-1.
LLLLLLLLLL
LLlLLLLLlL
Test - Test this switch with an ohmmeter. Place the
leads across the switch terminals. With the switch in
the OFF position, the meter should read infinite resis-
tance. With the switch in the ON position, the meter
should read zero resistance.
JJJJJJJJJJ
JJJJJJJJJJ
rrrrrrrrrrrrrr
11111111111111
~40f80'''----------~':'''':''''::''':'''':''':'''':''':''''':''':'''':''.:....:..J
I
;-RACTER
CWI;tf;~~
1111111111
VERTICAL
HOLD
Figure 3-2
VERTICAL HOLD (R612)
This
250
kfl potentiometer is soldered to the rear of
the chassis PC board. See Figure
3-2.
Adjustment - If the picture rolls upward or down-
ward, adjust the vertical hold control. Turn the con-
trol clockwise or counterclockwise until the rolling
stops.
Test - Test this control by removing it from the cir-
cuit board. Place an ohmmeter across the terminals to
determine if
it
is open or shorted.
VERTICAL SIZE (R616)
This
300
k!l potentiometer is soldered to the rear of
the chassis PC board. See Figure
3-2.
Adjustment - Adjust this control for proper picture
height.
Test - Test this control by removing it from the cir-
cuit board. Place an ohmmeter across the terminals to
determine if it is open or shorted.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents