Initial Measurement Application Setup - ABB X Series G5 Startup Manual

Flow computers and remote controllers
Hide thumbs Also See for X Series G5:
Table of Contents

Advertisement

9

Initial measurement application setup

The XFC or XRC shipped with standard configuration and the gas orifice
measurement application configured by default. This procedure describes
the setup of that flow measurement application (single tube). To set up
additional tubes, or for different measurement application types, refer to
the user manuals listed in
instructions, or click Help for online topics on the specific application
required.
Set up the gas orifice flow measurement application:
On the PCCU navigation tree, click Flow Measurement > Adv Setup.
1.
Figure 9-1: Flow Measurement Advanced Setup (Gas orifice).
On the Setup tab, verify and change if necessary, the following
2.
settings:
a.
If receiving live flowing temperature values from an RTD, set
the RTD Installed field to Yes.
b.
If using a fixed temperature value instead of live readings, set
the Use Fixed Temperature field to Yes.
i.
In the Fixed Temperature field, type the value for the fixed
temperature.
On the navigation tree, click Flow Measurement > Setup.
3.
On the General tab, verify and change if necessary, the required
4.
parameters:
5 2 | XSE RI ES G5 STA RT UP GUI DE | 21 0 60 0 1MNAA
Additional
information, the application

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xfc g5Xrc g5

Table of Contents