Download Print this page

DVC C2 Instruction Manual

Control box

Advertisement

Quick Links

--------------------------------
[2 & [101 Control box instruction
Item
Parts Name
1
Cover
2
O-Rinq(75. 92x1. 78)
3
Screw(M3x10L)
4
LED Light board
5
Fixinq piece
6
Micro switch
7
Proximity sensor
8
Screw(M3x15L)
9
Screw
10 Exhaust pipe
11
Gasket
12 Electroval ve
13
Stent-A
14
Stent-B
Control Box Instruction Manual
Parts List
Q'TY Material Item
1
ST.ST 304
1
NBR
-----
ST.ST 304
4
1
-----
2
NYLON 66
------
2
2
4
ST.ST 304
-----
1
ST.ST 304
1
-----
2
PE
1
1
POM
1
POM
04
Parts Name
15
Screw(M6x15Ll
16 Air connection
17 Air connection
18
Screw(PT1/8")
19 Air manifold
20 O-Rinq(11x3)
21
Screw(M5x10L)
22 Cable
23 Circuit board
24 Screw(M3x8L)
25 Screw(M5x12Ll
26 Cable head
27 O-Rinq(73x1.85)
28 Contact head
Q'TY Material
2
ST.ST 304
Plastic
1
[upper
1
ST.ST 304
1
ST.ST 304
1
1
NBR
-----
ST.ST 304
2
-----
1
1
4
ST.ST 304
2
ST.ST 304
1
NYLON 66
1
NBR
ST.ST 304
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the C2 and is the answer not in the manual?

Questions and answers

Summary of Contents for DVC C2

  • Page 1 Control Box Instruction Manual -------------------------------- [2 & [101 Control box instruction Parts List Item Parts Name Q'TY Material Item Parts Name Q'TY Material Cover ST.ST 304 ST.ST 304 Screw(M6x15Ll Plastic 16 Air connection O-Rinq(75. 92x1. 78) ----- [upper ST.ST 304 17 Air connection Screw(M3x10L) ST.ST 304...
  • Page 2 Control Box Instruction Manual -------------------------------------------- Installation for [2 & [101 actuator Screw contact head to the steam Fastening arrangemtnt on actuator top Air in ¢6mm air tube Air in General set up (Normally close) Red light is colsed Green light is opened Use hand operator of the solenoid valve...
  • Page 3 Control Box Instruction Manual ------------------------------------ General Installation for C2 & [101 actuator Put on the bottom set and press down Put the contact head on the housing, screw M6x1.0 screws Put the connection hwad and screw it to the stern ©Rmmbec 0-,;,g...
  • Page 4 Control Box Instruction Manual General Installation for C2 and [101 actuator Brown Blue 2 wires ot solenoid valve connecting with The right cable group left cable group those 2 holes for PNP controlling green is tor controlling light lighl. Wiring diagram for Control Box...

This manual is also suitable for:

C101