Download Print this page

Byan Systems SBBI-2 Installation Manual

Battery back-up

Advertisement

Quick Links

SBBI-2 Operating Information:
The SBBI-2 board allows the user to select the type of gate system it is used on with switching
programming. For this description the term 'Single' means one gate control board with one OR two
operators while 'Double' means a system with up to four operators running no more than two at a time.
A two leaf entry gate and a two leaf exit gate would be considered a 'double'.
Items Included:
SBBI-2 Battery Back-Up with Enclosure
1250 Watt Tripp-Lite Voltage and Frequency Controlled Inverter (shipped separately)
Battery Charger/Maintainer
10 Foot Wiring Harness for:
Power Output from Battery Back-Up to Device Control System
Device Control Function Wiring – see note 1 at the top of page 2
2.5 Foot Lead-In Cables for Battery to Inverter Connection
100 Amp Fuse for Installation between Positive Battery Terminal and Inverter
Fuse Holder
Customer-supplied Items:
Battery (see page 3 for Selection Guidelines)
Battery Enclosure
Weather Resistant Enclosure Connectors
Commercial Power Input Wiring
Inverter Installation:
1. Unpack inverter from its box.
2. Install inverter into enclosure below the shelf with the control panel facing you.
3. Install green ground wire from back of pre-wire to silver ground terminal on inverter.
4. Insert red (+) and black (-) 12VDC power leads from back of pre-wire into the positive and
negative terminals of the battery.
5. Plug male inverter remote plug (RJ 45 plug) into receptacle on the face of the inverter.
6. Plug the three prong cord into the socket on the inverter.
NOTE: Leave inverters facing you until the battery is connected, and then turn the inverter so its control panel
is facing the right side of the enclosure, facing the battery
Battery Back-Up Installation Manual:
Models SBBI-2
Installation and Wiring Instructions
.
Manufactured By
:
Byan Systems, Inc.
413 Linden
Lusk, WY 82225
(307)334-2865
(800)223-2926

Advertisement

loading
Need help?

Need help?

Do you have a question about the SBBI-2 and is the answer not in the manual?

Questions and answers

Summary of Contents for Byan Systems SBBI-2

  • Page 1 Models SBBI-2 SBBI-2 Operating Information: The SBBI-2 board allows the user to select the type of gate system it is used on with switching programming. For this description the term ‘Single’ means one gate control board with one OR two operators while ‘Double’...
  • Page 2 5. Motor 1 cycle contact. 6. Motor 2 cycle contact. 7. Motor 2 cycle common. 8. Motor 2 open common. 9. Motor 2 open contact. 10. NOT USED Manufactured By Byan Systems, Inc. 413 Linden Lusk, WY 82225 (307)334-2865 (800)223-2926...
  • Page 3 50 amp hours 100 amp hours NOTE: A cycle is defined as opening and closing of the gate. Above data requires fully charged battery and temperatures above freezing (32 degrees Fahrenheit). For other applications contact Byan Systems, Inc.. Manufactured By Byan Systems, Inc.
  • Page 4: Dip Switch Selection

    SBBI-2 MODE SELECTION ACTION WHEN POWER FAILS: ‘Single’ Gate System- ‘Open’ Mode: Power failure is verified for about 10 seconds, inverter is started, gate(s) is commanded to open, after about 60 seconds inverter is stopped, and system waits for power restoration. After power is restoration, power is verified for about 10 seconds, a ‘cycle’...
  • Page 5 4. Earth Ground (Green) Gate Control Functions: Connect supplied function control wiring harness to TB3 in a battery back-up to accessory terminals on the G2M control board not installed in a Byan Systems prewire. SBBI TB3 G2M Accessory Terminals 1 Empty...