GETTING STARTED WITH AQUAFLAME – SET UP
Thank you for purchasing an Aquaflame. If set up correctly your Aquaflame will give many
years trouble free operation. Before starting work it is necessary to fill the cell and the
booster, connect the torch and perform a leak test. The document below lays out the
procedure.
Please read the MSDS information relating to the Electrolytes and MEK – this can be found
on the Aquaflame website in Manuals & Literature. Both materials should be handled with
care. The electrolyte flake / solution is highly corrosive and the MEK is flammable. Please
handle both materials with care.
To ensure best results please follow these instructions with care.
1. FILLING THE CELL
It is necessary to fill the cell with Electrolyte crystals. These are dissolved in water.
PLEASE NOTE THAT IT IS VERY IMPORTANT NOT TO OVERFILL THE CELL.
ALWAYS WEAR ADEQUATE FACE & HAND PROTECTION
The filling of the Cell is done in three stages:
1. Mixing of the electrolyte crystals with deionized water
2. Filling the machine to the bottom of the sight tube with an initial fill so that the liquid
contents of the cell are visible at the bottom of the sight tube
3. Topping up the contents of the cell to the correct level.
Aquaflame Systems Ltd, 34 Augusta Street, Birmingham B18 6JA, UK.
T: +44(0)121-233-1088 E: sales@aquaflamesystems.com. W: www.aquaflamesystems.com
Company registration No: 02060723 VAT No: GB 443 6307 60
AQUAFLAME – AT THE HEART OF THE WORKSHOP
INSTRUCTIONS
Getting Started V3 201-1-2017
Need help?
Do you have a question about the 800 and is the answer not in the manual?
Questions and answers