Do you have a question about the Powerview Curtain Track Transceiver and is the answer not in the manual?
Questions and answers
Subscribe to Our Youtube Channel
Summary of Contents for Hunter Douglas Powerview Curtain Track Transceiver
Page 1
PowerView® Curtain Track Transceiver User Manual...
Page 2
Installing the Curtain track with Powerview Transceiver ® Installing the track 1. Assemble the track 2. Install the brackets to the wall ot ceiling and fix the track onto the brackets 3. Do not attach drapery after end positions have been set or complete installation is finished.
Page 3
Connecting power and communication 5. Mount Transceiver dongle to track motor like below P.S. actual look of dongle might differ from drawing below 6. Connect data cable between PowerView Transceiver and motor (Input: Port2) ® 6. Connect Forest DC or AC plug to the power socket of the Shuttle motor.
Page 5
To adjust to a customized curtain stack back (OPEN) position please follow the following instructions. 3. After the track carrier reaches open position LED 4 will light-up yellow, within 10 seconds the curtain stack back position can be manually adjusted. Stack back position can also be adjusted using a paired PV remote.
Page 7
PowerView Transceiver LED Feedback PV Transceiver LED flashing 5 x red: (repetition of signalling sequence in a loop) No correct communication to FOREST shuttle. Please check if PV Transceiver is connected correctly to “PORT 2 AUX” of shuttle motor PV Transceiver LED flashing 4 x red and 1 x green: (repetition of signalling sequence in a loop) PV Transceiver is connected correctly but FOREST shuttle is not referenced.
Page 8
PowerView Transceiver Curtain Track - Technical data PowerView® Transceiver Curtain track Article name: PV Transceiver CT Article code: 17.0345.0000 Nominal voltage (dc) Maximum current (mA) Dimensions (mm) 92 x 40 x 31.5 Operation temperature (°C) 0 – 60 Duty rating 100% on Weight (g) IP protection class...
PowerView Transceiver - Additional technical notes Please note: PV Transceiver behaviour after a power failure: A recalibration run for the forest shuttle is required after a power failure. Shuttle recalibration run starts automatically and always in close direction after first user operation command (manually or by radio and regardless of selected operating direction).
Hunter Douglas does not warrant or represent that any license, either express or implied, is granted under any patent right, copyright, mask work right, or other intellectual property right relating to any combination, machine, or process in which Hunter Douglas components or serv ices are used. Information published by Hunter Douglas regarding third-party products or services does not constitute a license to use such products or services or a warranty or endorsement thereof.
Need help?
Do you have a question about the Powerview Curtain Track Transceiver and is the answer not in the manual?
Questions and answers