※1
ER-VS02
(Hold) (Hold)
0.1
Make sure that the power is turned off before checking the high-voltage
part. Otherwise, an electric shock may result.
・
Make sure that the power voltage is within the tolerance as per specifications.
Check the tip of the discharge needle for chips and contamination, and make sure
・
that the discharge needle unit is mounted normally on the main body.
If the CHECK indicator (orange) lights up even after cleaning the discharge needle,
・
also check the nozzle part for contamination.
・
Make sure that the nozzle assembly (including the attachment and the insulating
pipe) is mounted properly.
Make sure that the air pressure is within the applicable range as per specifications.
・
・
Make sure that the ground terminal is connected completely.
Abnormal discharge is possible.
・
Turn off the power supply, check the tip of the discharge needle for chip and
contamination, and make sure that the discharge needle unit is mounted normally
on the main body. Also, check the inside of the nozzle for foreign objects, and
make sure that the nozzle is mounted and installed properly.
Make sure that the power voltage is within the tolerance as per specifications.
・
Check indicator (Orange) Error indicator (Red)
(4.5)
100
5.2
Ground terminal
5.5 (2.8)
(M3)
27 16
11.7
Power indicator(Green)
Shower nozzle( ER-VS02 )(optional)
16.9
(12.3)
31.7
17.8
●
13
CSA/UL COMPLIANT PRODUCT
● This product complies with CSA and UL standards, and has been
certified by TÜV SÜD.
http://panasonic.net/id/pidsx/global
Overseas Sales Division (Head Office)
2431-1 Ushiyama-cho, Kasugai-shi, Aichi, 486-0901, Japan
Phone: +81-568-33-7861 FAX: +81-568-33-8591
For sales network, please visit our website.
PRINTED IN JAPAN
(Hold)
(Permit)
one month
20
4.5
5.5
Φ4.2 cable 0.5m (
Gray
)
11.4
(5.8)
© Panasonic Industrial Devices SUNX Co., Ltd. 2018