Reliance Levalarm Gold EA100G Series Installation, Operation & Maintenance Instructions Manual

Reliance Levalarm Gold EA100G Series Installation, Operation & Maintenance Instructions Manual

Advertisement

Installation, Operation, & Maintenance Instructions
R500.E253A
03/16/2016
Levalarm
Gold
®
16633 Foltz Parkway ● Strongsville, OH 44149 USA Telephone: +1 (440) 572-1500 ● Fax: +1 (440) 238-8828
www.clark-reliance.com ● sales@clark-reliance.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Levalarm Gold EA100G Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Reliance Levalarm Gold EA100G Series

  • Page 1 Installation, Operation, & Maintenance Instructions R500.E253A 03/16/2016 Levalarm Gold ® ™ 16633 Foltz Parkway ● Strongsville, OH 44149 USA Telephone: +1 (440) 572-1500 ● Fax: +1 (440) 238-8828 www.clark-reliance.com ● sales@clark-reliance.com...
  • Page 2 All units should be inspected upon receipt to ensure that no damage has been incurred during transit. If there is a ® claim due to damage, it should be filed with the carrier immediately. Clark-Reliance Boiler Trim products should be stored in a dry and sheltered area prior to installation.
  • Page 3 4. After checking that all connections are tight and correct, replace the switch cover, as the unit is now ready to be put in operation. ® LEVALARM LAYOUT Boiler Steam Connection Low Water Cutout Level Boiler Water Connection 16633 Foltz Parkway ● Strongsville, OH 44149 USA Telephone: +1 (440) 572-1500 ● Fax: +1 (440) 238-8828 www.clark-reliance.com ● sales@clark-reliance.com...
  • Page 4 After performing the blow-down procedure, if the water level does not appear to return to normal promptly, the connecting piping may be partially restricted and need to be cleaned. 16633 Foltz Parkway ● Strongsville, OH 44149 USA Telephone: +1 (440) 572-1500 ● Fax: +1 (440) 238-8828 www.clark-reliance.com ● sales@clark-reliance.com...
  • Page 5 1. Any trip or alarm circuits that are actuated by the equipment being blown-down should be bypassed to prevent false ® alarms during the blow-down process. A Clark-Reliance Holding Switch model HS-0 or HS-1 can be used to by-pass the Low Water Cutout to prevent a false trip during the blow-down procedure.
  • Page 6 The meter should indicate an open circuit only when the switch is in the open position. ® 4. If the unit fails to test properly, contact Clark-Reliance for further instructions to adjust the switch mechanism or to obtain authorization to return the unit for factory inspection. If the switch tests OK, return unit to service.
  • Page 7 Teflon based sealant to both sides of the gasket. Lubricate the bolts with a Nickel based high temperature lubricant and torque to requirements in the Installation section. ® Warning: If this equipment is used in a manner not specified by Clark-Reliance , the protection provided by the equipment ®...
  • Page 8 16633 Foltz Parkway ● Strongsville, OH 44149 USA Telephone: +1 (440) 572-1500 ● Fax: +1 (440) 238-8828 www.clark-reliance.com ● sales@clark-reliance.com...

This manual is also suitable for:

Levalarm gold ea100g-150Levalarm gold ea100g-300Levalarm gold ea100g-600Levalarm gold ea100g-300swLevalarm gold ea100g-600swLevalarm gold

Table of Contents