S51
STAINLESS STEEL BOLT SHELVING SYSTEM
RISKS RELATED TO THE INSTALLATION OF THE SHELF
BEFORE MOUNTING the structure check the floors and floor slabs, they must be in good condition, without holes and
accentuated unevenness and must have an appropriate consistency for the capacity of the uprights. In the case of shelf to
be built on a mezzanine floor it is essential to consult a specialist in order to assess the resistance and the capacity of the
floor.
"
UNLOADING AND STORAGE OF MATERIALS. This must be carried out at a predefined location, away from the risks
arising from any everyday work and contemporary installation of other systems (electricity, water, air conditioning, etc.).
The staff must be informed about the interim storage program, the approach of the material to the area of installation and
realization of the system itself.
"
ASSEMBLY AND INSTALLATION OF SHELF. The staff assigned to this work shall be provided with protective gloves.
The personnel managers must coordinate all phases of movement and installation and ensure that all applicable standards
regarding the health and safety of workers are applied.
BEFORE BEGINNING THE MOUNTING READ CAREFULLY
THE CHAPTER "USE AND MAINTENANCE STANDARDS"
installation, use and maintenance instructions
Via Bonazzi, 4 - 40013 Castel Maggiore (BO)
Tel. +39 051 700096 (10 linee) - Fax +39 051 700175
info@tecnotelai.it - www.tecnotelai.it
Entirely made in stainless
steel AISI 304 (EN:
1.4301).
Suitable for cold storage
and food,
pharmaceutical and
" "
chemical sectors.
"
! /! 1 3
Need help?
Do you have a question about the S5041 and is the answer not in the manual?
Questions and answers