Start-Up, Premierlink; Start-Up, Rtu- - Open - Carrier 50HCQA05 Service And Maintenance Instructions

Single package heat pump/electric heat nominal 3 to 10 tons with puron r-410a refrigerant
Hide thumbs Also See for 50HCQA05:
Table of Contents

Advertisement

START- -UP, PREMIERLINK
WARNING
!
ELECTRICAL OPERATION HAZARD
Failure to follow this warning could result in personal
injury or death.
The unit must be electrically grounded in accordance
with local codes and NEC ANSI/NFPA 70 (American
National Standards Institute/National Fire Protection
Association.)
Use the Carrier Communication Network (CCN) software
to start up and configure the PremierLink controller.
Changes can be made using the ComfortWORKSr
software, ComfortVIEWt software, Network Service
Tool, System Pilott device, or Touch Pilott device. The
System Pilot and Touch Pilot are portable interface
devices that allow the user to change system set- - up and
setpoints from a zone sensor or terminal control module.
During start- - up, the Carrier software can also be used to
verify communication with PremierLink controller.
NOTICE
SET- - UP INSTRUCTIONS
All set- - up and set point configurations are factory set
and field- - adjustable.
Refer to PremierLink
t
Configuration Instructions .for specific operating
instructions for the controller. Have a copy of this
manual available at unit start- - up.
Perform System Check- -Out
1. Check all power and communication connections
ensuring the are properly connected and securely
tightened.
2. At the unit, check fan and system controls for proper
operation.
3. At the unit, check electrical system and connections
of any optional electric reheat coil.
4. Ensure all area around the unit is clear of construction
dirt and debris.
5. Ensure final filters are installed in the unit. Dust and
debris can adversely affect system operation.
6. Verify the
PremierLink controls
connected to the CCN bus.
Installation, Start- - Up and
are
properly
START- -UP, RTU- -OPEN
NOTICE
SET- - UP INSTRUCTIONS
Refer to the following manuals for additional
installation, wiring and troubleshooting information
for the RTU- - OPEN Controller.: "Controls, Start- - up,
Operation and Troubleshooting Instructions," "RTU
Open
Installation
and
"RTU- - Open Integration Guide". Have a copy of these
manuals available at unit start- - up.
41
Start- - up
Guide"
and

Advertisement

Table of Contents
loading

This manual is also suitable for:

50hcqa0450hcqd0850hcqa0650hcqd0950hcqd1250hcqa07

Table of Contents