IP55 Boom Working frequency Intense Intense cover 11 s Opening / Closing time Control MX4SP board Transmitter The main dimensions of the MBM8 and MBM11 barrier are: photocells Electromechanical barrier MBM8 MBM11 Fastening metal User’s plates manual M16 bolts with...
(photocells, wall starts, key selectors, etc). Foundation in cement for MBM8 barrier 2 The unlocking is made by rotating the disc at the bottom of the motor, highlight- ed/shaded on the image on the side.
Page 5
Foundation in cement for MBM8 barrier 2 Open the door using the key to unlock it, and pull it to the outside. Foundation in cement for MBM11 barrier 3 Place the fastening metal plates and fix...
INSTALLATION INSTALLATION BOOM ASSEMBLY When the position of the boom’s support To assemble the boom, you must place is defined, you can fix it to the ground. the boom on the barrier fixing plate Make two holes on the fixing ground, and and align the four holes on each piece.
INSTALLATION INSTALLATION Remove the screw A. fase 5 2 Put the boom like on phase 1 as shown fase 4 on the above image. Let it go and it must maintain on that position, or rising very slowly. If the boom starts to descend or rise fase 3 adjust the springs untill you can make the boom become stabilized.
INSTALLATION INSTALLATION BOOM LEVELING LIMIT-SWITCHES After installing the barrier, you must verify the position of the boom while closed. If it The mechanical limit-switches of the barrier isn’t aligned horizontally when closed, follow the instructions bellow to adjust it. are shown on the image on the left. They consist of two rings fixed to the boom’s rotation shaft, that when openning or closing will activate the micro-switches also...
Page 9
MC15 CONTROL BOARD CONFIG MC15 CONTROL BOARD CONFIG CHECKING LIMIT-SWITCHES CONNECTIONS BARRIER’S COURSE CONFIGURATION The first step to program the control board is to verify all connections of the various The LEDs BL e DS must be both ON so that the barrier can work properly. components.
Page 10
MC15 CONTROL BOARD CONFIG MC15 CONTROL BOARD CONFIG TRANSMITTERS CONFIGURATION CONDOMINIUM FUNCTION AND POTENTIOMETERS Once you have the barrier’s course configured, you can now program the transmitters: The condominium function of this control board causes the barrier to only accept opening orders.
Check input fuses; connecting directly to power Pull it out and send it to our site and send to our MOTORLINE operator and if it is supply in order to find out if they MOTORLINE technical services technical services for diagnosis.
COMPONENT TEST MAINTENANCE CONNECTIONS SCHEME MAINTENANCE To detect which are the components with problems in barrier’s installation, sometimes Check tightness of the screws that fix the it will be needed to run some tests with direct connection to a 230V power supply. For boom to the barrier’s body.
CONTROL BOARD CONNECTIONS CENTRAL MC15 MOTORLINE RX - Receiver CLOSE CODE CODE P. OPEN CMD AP. L CORT. PGM. AUT T. MOT T. MOT. P T. PAUSA F1=6,3TL250V F2=160mAL250V 12.A...