Transport Systems Seacom AG Table of contents CE-DECLARATION OF CONFORMITY PREFACE RESIDUAL RISK SPECIFICATION OPERATING INSTRUCTIONS SERVICE MANUAL SPARE PART LIST A 5502 / Rolltrailer 80’ 150t Page 3 / 21...
EN 287-1 (Prüfung von Schweißern - Schmelz- schweißen - Teil 1: Stähle) / (Qualification test of welders - Fusion welding - Part 1: Steels) Heinz Althammer Neuhausen, 22. July 2011 Trailer Systems Seacom AG A 5502 / Rolltrailer 80’ 150t Page 4 / 21...
Any warranty claims can only be considered, if all service and maintenance works has been carried out on schedule. The operator has to keep records about all maintenance and repair works. A 5502 / Rolltrailer 80’ 150t Page 5 / 21...
The road surface should be paved well enough. Speed should be reduced on inclines and driven with greatest caution. The cargo's centre of gravity should lie in the middle of the loading area if possible. Adapt the speed to the condi- tions. A 5502 / Rolltrailer 80’ 150t Page 6 / 21...
Page 7
In case of doubt, the supplier needs to be consulted. Danger during maintenance on a jacked up trailer. The trailer needs to be sufficiently supported before maintenance and secured against rolling away. A 5502 / Rolltrailer 80’ 150t Page 7 / 21...
10 mm Accessories lashing rail in the platform D-Rings in front and rear Finish dry thickness approx. 100/120 my Colour (oxide red) RAL 3009 Measurements and weight may vary slightly. A 5502 / Rolltrailer 80’ 150t Page 8 / 21...
Coupling Reverse the truck towards the front of the rolltrailer, take care that the middle of the fifth wheel is directing towards the king pin of the fixed gooseneck. Then lift the fifth wheel coupling so that it is parallel to and under the gliding plate of the fixed gooseneck.
Page 10
Make sure that the rolltrailer is parked on horizontal ground. The weight of the cargo put on the rolltrailer shall not exceed the maximum capacity. Distributed load To avoid overloading always ensure that the centre of gravity of the load is as close to the centre of the load area of the rolltrailer as possible (see the following loading scheme).
Page 11
Transport Systems Seacom AG Pointed load For the distribution of the load see the following scheme. A 5502 / Rolltrailer 80’ 150t Page 11 / 21...
Rocker arm bearing 3 month Swivel axle bearing 3 month The lubrication intervals depend on the operational conditions of the trailer: If the conditions are rough, then more frequent lubrication is needed. A 5502 / Rolltrailer 80’ 150t Page 12 / 21...
Page 13
If upper pin diameter less 71 mm then replace it Gauge To replace pin unlock screws, Do not use the old screws Replace pin and screws Use torque wrench (190 Nm) A 5502 / Rolltrailer 80’ 150t Page 13 / 21...
Page 14
2800 3300 M 36 x 1.5 2700 3800 4450 M 36 x 3 2500 3500 4100 M 39 x 1.5 3450 4900 5700 M 39 x 3 3200 4600 5300 A 5502 / Rolltrailer 80’ 150t Page 14 / 21...
Page 15
King pin 2” 1723.1012 Screw M16x80 DIN933 06.01.8082.34 Washer B16 DIN127 06.01.8082.35 D-ring 06.01.8082.36 Wheel set 28x10x22 06.01.8082.37 Wheel set with brake 28x10x22 06.01.8082.38 Rocker beam 06.01.8082.39 Air brake system 06.01.8082.40 A 5502 / Rolltrailer 80’ 150t Page 15 / 21...
Page 16
Transport Systems Seacom AG A 5502 / Rolltrailer 80’ 150t Page 16 / 21...
Need help?
Do you have a question about the Rolltrailer and is the answer not in the manual?
Questions and answers