Page 3
Step 2: Center the Flat Flashing over the rafter and drill a pilot hole for the lag bolt. Step 3: Insert the Flat Flashing so the top part is under the next row of shingles and the hole lines up with the pilot hole.
Page 4
Step 4: Insert the lag bolt through the components in the order shown in the illustration. Tighten into the rafter. 1. Lag Bolt (Installer Provided) 2. EPDM Washer 3. L-Foot (or other rail attachment piece) 4. Square Aluminum Piece (concave side down)
Need help?
Do you have a question about the Flat Flashing and is the answer not in the manual?
Questions and answers