Please face this side
G
Please mount the outdoor
(suction side) of the
unit on stable ground to
unit to the wall.
prevent
vibration
and
increase of noise level.
Decide the location for piping
G
after sorting out the different
types of pipe available.
G
Open the side plate by
unscrewing the screws as
shown below.
Pull
downward
!
CAUTION
Top cover
Please make sure to remove
all spacers inside the unit.
Open the Top, Back and
G
Side cover of the unit.
G
Pull out the spacers inside.
(Spacers are only for
transportation purpose).
If not remove, vibration and
noise will occur.
CONDENSED WATER DISPOSAL OF OUTDOOR UNIT
There are holes on the base of Outdoor unit for condensed water
to exhaust.
In order to flow condensed water to the drain, the unit is installed
on a stand or a block so that the unit is 100mm above the ground
as shown figure. Join the drain pipe to one hole.
At first insert one portion of the hook to the base (Portion A), then
pull the drain pipe in the direction shown by the arrow while inserting
the hook into the base. After installation, check whether the drain
pipe cling to the base firmly.
A
BASE
DRAIN PIPE
BUSH
12
When using in cold region, etc.
In cold region with severe cold climate and heavy snow, water
discharged from heat exchanger freeze on the base surface and
this may affect drainage. In such a region, remove bush on the
bottom face of outdoor unit for better drainage. When using
drainpipe, consult our dealer.
WARNING
G
THIS APPLIANCE MUST BE EARTHED.
!
Procedures of Wiring
Power is supplied from Outdoor Unit
Indoor Unit
A
B
C
D
A
B
2.5
Connecting Cord
1.6 or 2.0
Power line
30mm
10mm
Indoor
Unit
10mm
70mm
35mm
Outdoor
10mm
Unit
10mm
GRN + YEL
45mm
!
WARNING
G
The naked part of the wire core should be 10 mm and fix it to the terminal tightly. Then try to pull the
individual wire to check if the contact is tight. Improper insertion may burn the terminal.
Be sure to use only power cables approved from the authorities in your country. For example in Germany:
G
Cable type: NYM 3x1.5mm
2
, (fuse = 30A time delay)
G
Please refer to the installation manual for wire connection to the terminals of the units. The cabling must
meet the standards of electrical installation.
G
There is a AC voltage of 220-240V between the L and N terminals. Therefore, before servicing, be sure
to remove the plug from the AC outlet or switch off the main switch.
Do not make any connection in the middle of the connecting cable. It may cause the wire over heated,
G
emit smoke and fire.
Insulation And Maintenance Of Pipe Connection
1
The connected terminals should be completed sealed with
G
heat insulator and then tied up with rubber strap.
G
Please tie the pipe and power line together with vinly tape as
shown in the figure showing the installation of Indoor and
Outdoor units. Then fix their position with holders.
To enchance the heat insulation and to prevent water
G
condensation, please cover the outdoor part of the drain hose
and pipe with insulation pipe.
G
Completely seal any gap with putty.
Insulation material for pipe connection
Sleeve of
protection pipe
Putty
1
Preparation of Pipe
G
Use a pipe cutter to cut the copper pipe.
Please
remove
side cover
when
connecting
the piping
and
connecting
cord.
G
Jagged edge will cause leakage.
G
Point the side to be trimmed downwards during trimming to prevent copper
chips from entering the pipe.
Before flaring, please put on the flare nut.
G
Back cover
Die
Side cover
Outer
Diameter (mm)
6.35
12.7
15.8
2
Pipe Connection
In case of removing flare nut of an indoor unit, first remove a nut
!
CAUTION
of small diameter side, or a seal cap of big diameter side will fly
out. Prevent water from entering into the piping when working.
G
Please be careful when bending the copper pipe.
G
Screw in manually while adjusting the center. After that, use of torque wrench to
tighten the connection.
Flare nut
11
BUSH
DRAIN PIPE
13
Torque
Wrench
wrench
Outdoor Unit
Line Cord
2.5
L
N
C
D
V
0
4
2
0 -
2
2
C
A
Control line
30mm
10mm
GRN + YEL
Strip wires
25mm
10mm
2
Power Source And Operation
Test
Power Source
CAUTION
!
G
Please use a new socket. Accident may occur due to the
use of old socket because of poor contact.
G
Please plug in and then remove the plug for 2 – 3 times.
This is to ensure that the plug is completely plugged into
the socket.
G
Keep additional length for the power cord and do not render
the plug under external force as this may cause poor
contact.
Do not fix the power cord with U-shape nail.
G
Trimming tool
Copper pipe
!
CAUTION
Die
A
Please use exclusive
G
tool
Copper pipe
A (mm)
Imperial flaring tool
Rigid flaring tool
0.8 – 1.5mm
0 – 0.5mm
1.0 – 2.0mm
0 – 1.0mm
1.0 – 2.0mm
0 – 1.0mm
Outer
Torque N·m
dia.of pipe
(kgf · cm)
Small dia. side
6.35 (1/4")
13.7 – 18.6 (140 – 190)
12.7 (1/2")
44.1 – 53.9 (450 – 550)
Large dia. side
15.88 (5/8")
49 – 58.8 (500 – 600)
Small dia. side
6.35 (1/4")
19.0 – 21.0 (194 ~ 214)
Valve
29.4 – 34.3 (300 – 350)
12.7 (1/2")
head cap
Large dia. side
15.88 (5/8")
29.0 – 31.0 (296 ~ 316)
9.0 (92)
Valve core cap
Wiring Of The Indoor Unit
For wire connection of the Indoor unit, you need to remove
G
electrical cover.
65mm
60mm
Wiring Of The Outdoor Unit
G
Please remove the side cover for wire connection.
G
If you cannot attach the side cover due to the connecting cord,
press the connecting cord in direction to the front panel to fix it.
!
Be sure that the hooks of the side cover is fixed in certainly.
G
Otherwise water leakage may occur and this causes short circuit
WARNING
or faults.
G
The connecting cord should not touch to service valve and pipes.
(It becomes high temperature in heating operation.)
Checking for the electric source and the
voltage range
Before installation, the power source must be checked and necessary wiring work
G
must be completed. To make the
proper wiring capacity, use the wire gauges
list below for the lead-in from a pole transformer and for the wiring from a switch board
of fuse box to the outlet in consideration of the locked rotor current.
IMPORTANT
Cable length
Wire cross-section
up to 15m
2.5mm
up to 25m
4.0mm
3
Removal Of Air From The Pipe And Gas Leakage Inspection
Procedures of using Vacuum Pump for Air Removal
As shown in right figure, remove the cap
of valve core. Then, connect the charge
hose. Remove the cap of valve head.
1
Connect the vacuum pump adapter to
the vacuum pump and connect the
charge hose to the adapter.
Fully tighten the "Hi" shuttle of the
manifold valve and completely unscrew
the "Lo" shuttle. Run the vacuum pump
2
for about 10–15 minutes, then completely
tighten the "Lo" shuttle and switch off
the vacuum pump.
Completely unscrew the spindle of the
service valve (at 2 places) in anti-
3
clockwise direction to allow the flow of
coolant (using Hexagonal Wrench key).
Remove the Charge hose and tighten
the cap of valve head. Check the cap's
4
periphery if there is any gas leakage.
The task is then completed.
Gas Leakage Inspection
Please use gas leakage detector to check if leakage
occurs at the connection of Flare nut as shown on
the right.
If gas leakage occurs, further tighten the connection
to stop leakage.
Method to remove electrical cover
Insert and fix the
connecting cords
with screw.
(4 places)
A
B
C
D
Connect the earth wire.
(green and yellow wire)
Connecting
Cords.
Investigate the power supply capacity and other
G
electrical conditions at the installation location.
Depending on the model of room air conditioner
to be installed, request the customer to make
arrangements for the necessary electrical work etc.
The electrical work includes the wiring work up
the outlet. In localities where electrical conditions
are poor, use of a voltage regulation is
recommended.
IMPORTANT
2
Fuse Capacity
2
30A time delay fuse
When the meter reaches –101KPa (–76cmHg)
during pumping, fully tighten the shuttle.
Meter showing pressure
Lo
Hi
Manifold valve
Vacuum pump
Charge
hose
When pumping starts, slightly loosen
the flare nut to check of air sucked in.
Then tighten the flare nut.
The body of
service valve
Cap of
valve core
Hexagonal
Wrench Key
Cap of valve head
Cap of valve head
After unscrew the band,
put the connecting cords
and fix again with screw.
(2 places)
B
C
D
A
Earth terminal

Advertisement

loading

This manual is also suitable for:

Rac-50dh7Rad-70dh7aRad-60dh7aRac-60dh7Rac-70dh7