Download Print this page

Beacon/Morris TWIN-PAK 20 Installation Instructions

Advertisement

Quick Links

Installation Procedure:

1. From job schedule or plan, deter-
mine proper assemblies for each
wall.
2. Install partial backplate at proper
height and level (Note: Where valve
compartments occur, allow 12" for
partial backplate).
3. Bracket Installation: Insert carriage
bolt through pitch adjustment slot in
bracket assembly. Locate bracket
assembly with partial backplate
and screw to wall (Note: 2 bracket
assemblies for enclosures 3' thru 6',
and 3 for 7' and 8'). Install hanger
assembly with serrated fl ange nut
and carriage bolt.
4. Install wall sleeve supports, if any.
5. Lay element on fl oor (Note: 4 1/4 fi n
dimension to be horizontal). Place
cradles on element and position
them so that the center of the
cradles will rest on the ball bearings
of the hanger assemblies. Install
element with cradles on hanger
assemblies.
6. Install enclosure. Begin with
lower enclosure. Insert the lower
enclosure top bend into the
armature bracket, then swing lower
enclosure bottom into position with
enclosure lock and tighten. Place
upper enclosure top bend into
partial backplate, then swing upper
enclosure bottom to the armature
bracket and push into place.
7. Install accessories. Accessories are
the overlapping type with a bottom
return to the wall. Push the top bend
of the accessories down behind the
partial backplate and anchor the
return to the wall bend at bottom for
a sturdy installation.
Beacon/Morris
260 North Elm Street • Westfi eld, MA 01085
Tel: (413) 562-5423 • Fax: (413) 572-3764
www.beacon-morris.com
TWIN-PAK 20

INSTALLATION INSTRUCTIONS

1
ELEMENT
2
UPPER ENCLOSURE
3
LOWER ENCLOSURE
4
FASTENERS - BY OTHERS
5
CRADLE
ELEMENT
CATALOG
DESIGNATION
STC-3/4 435
STC-435
STC-1435
ST-144
ST-243
6
BRACKET ASSEMBLY
7
PARTIAL BACKPLATE
8
HANGER ASSEMBLY
9
CARRIAGE BOLT
10 SERRATED FLANGE NUT
TP-20
NOMINAL
CRADLE
PIPE SIZE
NO.
3/4 COPPER
2
1" COPPER
2
1 1/4 COPPER
2
1 1/4 STEEL
2
2" STEEL
1
CAT-54881D
A MIN
A MAX
7 3/8
8 1/2
7 1/2
8 5/8
7 5/8
8 13/16
7 7/8
8 15/16
7 5/8
8 3/4
TP20II-1

Advertisement

loading

Summary of Contents for Beacon/Morris TWIN-PAK 20

  • Page 1: Installation Instructions

    TP20II-1 TWIN-PAK 20 INSTALLATION INSTRUCTIONS Installation Procedure: ELEMENT BRACKET ASSEMBLY 1. From job schedule or plan, deter- mine proper assemblies for each UPPER ENCLOSURE PARTIAL BACKPLATE wall. 2. Install partial backplate at proper height and level (Note: Where valve LOWER ENCLOSURE HANGER ASSEMBLY compartments occur, allow 12"...

This manual is also suitable for:

Twin-pak 14