Do you have a question about the Prop Stand and is the answer not in the manual?
Questions and answers
Summary of Contents for Studio Proper Prop Stand
Page 1
Prop Stand installation instructions Fixed screw installation 3M installation Puck installation and assembly...
Page 2
45° Cable hole The Prop stand has screw mounting holes suited for coun- tersunk screws with a max 5.5mm in diameter. Front of Stand Side View Route cables required Break the perforations in the base 3M liner.
Page 3
Mounting screws must pass through 25mm in the stand base before they contact the surface, ensure the correct length of screw is purchased. The Prop stand has screw mounting holes suited for coun- tersunk screws with a max 5.5mm in diameter. Angle direction...
Page 4
After application, the bond strength will increase as the adhesive flows onto the surface. At room temperature approximately 50% of ultimate bond strength will be achieved after 20 minutes, 90% after 24 hours and 100% after 72 hours. Fix the device to your Prop Stand See below for the easiest mounting method.
Need help?
Do you have a question about the Prop Stand and is the answer not in the manual?
Questions and answers