Download Print this page

Kohler LITHOCAST Installation Instructions page 2

Freestanding bath

Advertisement

B. Product Inspection
Uncrate and inspect bath for damage. All Kohler s
baths have been manufactured with sophisticated
craftsmanship. However, please inspect for any
possible damage that may have occurred in transit.
Leave all materials in the crate during construction to
prevent damage.
NOTE: Damage occurred during transit shall not be
covered by warranty.
C. New or Replacement Installation
Requirements
This bath can be installed in new or existing bathrooms.
For replacement: Remove the old bath. Remove any
old plumbing that does not confo m to the rough-in
requirements.
For new installation: Position the plumbing according to
the rough-in dimensions. Cap the suppliers, and check
for leaks.
INSTALLATION REQUIREMENTS
A. Tools Required
·
Adjustable pipe
wrench
·
Rule
·
Level
·
Safety shoes
·
Safety glasses
·
Square
·
Screwdriver
·
Pliers
·
Utility knife
·
Adjustable wrench
C. Installation Note:
Read the entire installation instructions included with
fixture before beginning the installation.
D. Clearance Requirements
Check the rough-in and room dimensions to provide
adequate available space for the bath unit.
SITE REQUIREMENTS
A.
Subfloor
Preparation
Check the flooring under the bath, and make repairs as
needed.
Make sure the subfloor is level and flat. It is
strongly recommended to prepare waterproof layer for
the subfloor beforehand.
1216391-T01-C
r
B. Materials Required
·
Plumbers putty
·
Wall coverings(as necessary)
·
Silicone sealant
·
Gypsum cement(optional)
·
Construction adhesive
(optional)
·
Protective covering for
bathtub
B.
'
C.
A.
·
·
·
·
·
·
·
·
·
·
C.
D.
A.
-2-
B.
·
·
·
·
(
·
(
·
:
(
)
)
)

Advertisement

loading