Advertisement

P300 and P400 Shuttle
Safety Information..................2
Installation...............................3
Start-up....................................5
Operation ................................5
Adjustments ............................5
Thank you for purchasing this quality brewer. For your safety and the safety of others, read all warnings and the
operator manual before installing or using the product. Properly instruct all operators. Keep training records. For
future reference, record serial number here:
Grindmaster-Cecilware
4003 Collins Lane, Louisville, KY 40245 USA
Phone: 502.425.4776 Toll Free: 800.695.4500
Fax: 502.425.4664
Web: gmcw.com Email: info@gmcw.com
©2016 Grindmaster-Cecilware
Printed in USA
Model P300E

Table of Contents

Cleaning...................................8
Maintenance ...........................9
Wiring Diagram.....................16
Operator Manual
Brewers
®
Grindmaster-Cecilware
industry's BEST warranty. Visit gmcw.com
for warranty terms and conditions.
Model P400E
provides
the
0316 Form # AM-309-10
Part # 390-00064

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Shuttle P300 and is the answer not in the manual?

Questions and answers

Summary of Contents for American Metal Ware Shuttle P300

  • Page 1: Table Of Contents

    Operator Manual P300 and P400 Shuttle Brewers ® Model P300E Model P400E Table of Contents Safety Information....2 Cleaning........8 Installation.......3 Maintenance ......9 Start-up........5 Troubleshooting Guide...9 Operation ........5 Parts Diagram and List..14 Adjustments ......5 Wiring Diagram.....16 Thank you for purchasing this quality brewer. For your safety and the safety of others, read all warnings and the operator manual before installing or using the product.
  • Page 2: Safety Information

    This equipment must be installed in compliance with applicable Federal, State and/or Local plumbing codes having jurisdiction. This product requires an approved back flow prevention water device, such as a double check valve, to be installed between the machine and the water supply. GB Series American Metal Ware Cecilware P300 & 400 Shuttle Brewers ®...
  • Page 3: Installation

    Installation Rough-In Drawing for the P300 Rough-In Drawing for the P400 P300 & P400 Shuttle Brewer American Metal Ware...
  • Page 4 HSJO, or HSJOO. Alternatively, flexible conduit and a pail. This will ensure no sediment from a new type THHN wires may be used. Use only copper installation can get in the brewer. conductors. American Metal Ware P300 & 400 Shuttle Brewers ®...
  • Page 5: Start-Up

    Water used for brewing coffee is very hot. Use head. caution when brewing, pouring, or transporting Depending on the model, American Metal Ware offers coffee. Accidental spills may result in severe burns. three types of timer adjustments. Look at the instructions for the type of timer you have.
  • Page 6 (min:sec) 0:15 2:45 0:46 2:59 1:01 3:13 1:17 3:26 1:32 3:39 1:47 3:53 2:03 4:06 2:17 4:20 2:31 5:00 Figure C Two Batch Timer w/Counter Adjustment (setting may vary from shown) American Metal Ware P300 & 400 Shuttle Brewers ®...
  • Page 7 The thermostat controls the water temperature in the Figure F tank. Factory setting is 200°F. Water should never boil Optional Solid State Thermostat in the tank. If water is boiling in the tank, adjust the temperature appropriately. P300 & 400 Shuttle Brewers American Metal Ware ®...
  • Page 8: Cleaning

    10. Polish the exterior of the brewer with stainless steel cleaner. Use the appropriate cleaner for brass, copper, or vinyl if these optional finishes are provided. American Metal Ware P300 & 400 Shuttle Brewers ®...
  • Page 9: Maintenance

    • Fill valve installed • Look for direction of • If arrow on valve is pointing backwards. arrow on valve body. toward water inlet, remove valve and install correctly. P300 & 400 Shuttle Brewers American Metal Ware ®...
  • Page 10 • 120V is across FILL • Disassemble valve and clean and N on level control, or replace plunger if frozen. but no fill. If plunger is OK, coil may need replacement. American Metal Ware P300 & 400 Shuttle Brewers ®...
  • Page 11 • See above. is very long. • Low temp/no brew • Water is above 190°F, • Turn down brew thermostat, thermostat set too but HOT WATER light see Adjustments. high. is off. P300 & 400 Shuttle Brewers American Metal Ware ®...
  • Page 12 • Check 120V between H • If no 120V BREW output and N on timer. If OK, from timer, replace timer. check for 120V between BREW and N on timer after pressing start. American Metal Ware P300 & 400 Shuttle Brewers ®...
  • Page 13 Prior authorization must be obtained from Grindmaster-Cecilware for all warranty claims. Grindmaster-Cecilware provides the industry’s BEST warranty. Visit our website at gmcw.com for warranty terms and conditions. P300 & 400 Shuttle Brewers American Metal Ware ®...
  • Page 14: Parts Diagram And List

    NOTE: This drawing shows parts for the Model P400E. All parts shown on this drawing apply to the Model P300E, except the quantities may change. Depending on the options included, your brewer may have different parts. American Metal Ware P300 & 400 Shuttle Brewers ®...
  • Page 15 A522132 BONNET NUT A522031 GAGE GLASS A522120 SPRING A537-047 PLASTIC STEM A537-049 UPPER FAUCET ASSEMBLY A522102 SILICONE A522027 WASHER LOWER GAGE SEAT CUP AA-958 GAGE BASE Upper Faucet A537-049 Gauge Assembly A718-018 P300 & 400 Shuttle Brewers American Metal Ware ®...
  • Page 16: Wiring Diagram

    Wiring Diagram Models P300E/P400E, with 1 Batch Timer NOTE: THIS DRAWING SHOWS COMPONENTS ON STANDARD MODEL ONLY. SEE 091-548 (pg. 18) FOR WIRING OF BREWER OPTIONS. American Metal Ware P300 & 400 Shuttle Brewers ®...
  • Page 17 Wiring Diagram (continued) Models P300E/P400E, with 2 Batch Timer NOTE: THIS DRAWING SHOWS COMPONENTS ON STANDARD MODEL ONLY. SEE 091-548 (pg. 18) FOR WIRING OF BREWER OPTIONS. P300 & 400 Shuttle Brewers American Metal Ware ®...
  • Page 18 NOTES: 1. IF PROVIDED WITH OPTION C21A, THREE HEATERS, SEE HEATER WIRING DIAGRAM 091-182 (pg. 19). 2. WHEN PROVIDED WITH OPTION C14, AUTOMATIC WARMER SHUTOFF, SUBSTITUTE ACTIVATED SWITCH FOR WARMER TOGGLE. American Metal Ware P300 & 400 Shuttle Brewers ®...
  • Page 19 CONNECT HEATER ACCORDING TO FIG. F ON CHART FIG. F FOR 3 PH ONLY WIRES 5 6 7 8 ARE 8 AWG, 105°C 1 2 3 4 ARE 10 AWG, 105°C P300 & 400 Shuttle Brewers American Metal Ware ®...
  • Page 20 Grindmaster-Cecilware 4003 Collins Lane, Louisville, KY 40245 USA Phone: 502.425.4776 Toll Free: 800.695.4500 Fax: 502.425.4664 Web: gmcw.com Email: info@gmcw.com 0316 Form # AM-309-10 ©2016 Grindmaster-Cecilware Part # 390-00064 Printed in USA...

This manual is also suitable for:

Shuttle p400

Table of Contents