Do you have a question about the 9927 and is the answer not in the manual?
Questions and answers
Subscribe to Our Youtube Channel
Summary of Contents for Alcatel-Lucent 9927
Page 1
The actual document shall be furnished to the FCC when it becomes available. Response A copy of the “Alcatel-Lucent 9927 Distributed Base Station Outdoor Site Preparation Guidelines” manual is attached to this exhibit. Page 1 of 1...
Page 2
Use pursuant to applicable agreements Title page Alcatel-Lucent 9927 Distributed Base Station Outdoor Site Preparation Guidelines 401-703-516 Issue 1 | March 2012 Alcatel-Lucent – Proprietary Use pursuant to applicable agreements...
Page 4
The reasons for reissue are shown in the table below. Issue Reason Intended audience This IP is intended for customers preparing a 9927 Distributed Base Station outdoor site. Conventions used The following conventions are used in this IP: Measurements All measurements are shown in metric form, and are followed by the English conversion in parentheses.
Page 5
About this document ..............................................Naming conventions In this IP, the Alcatel-Lucent 9927 Distributed Base Station Outdoor Cabinet is referred to as 9927 Distributed Base Station Outdoor Cabinet. Standard cross-sections and wire diameters of round copper conductors The following table is from CEI/IEC 60947-1:2004, Table 1, Standard cross-sections of...
Page 6
• GR-487-CORE, Telcordia • GR-63-CORE, Telcordia Alcatel-Lucent documents (not required) The following documents are related but not required for a 9927 Distributed Base Station Outdoor Cabinet outdoor site. • Alcatel-Lucent 9927 Distributed Base Station System Description, 401-703-729 • Alcatel-Lucent CDMA Operations, Administration and Maintenance, 401-703-407 •...
Page 7
Station Outdoor Cabinet site preparation checklists”. These checklists and punchlists are intended to aid customers and Alcatel-Lucent personnel during a base station site Method of Procedure (MOP) walk-through before equipment installation. Utilization of the checklists helps ensure a quality installation and provides a base station site history file for later reference.
Page 8
To comment on this document, go to the Online Comment Form (http://infodoc.alcatel- lucent.com/comments/) or e-mail your comments to the Comments Hotline (comments@alcatel-lucent.com)..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
Page 9
S afety Overview Purpose This chapter covers safety precautions for the 9927 Distributed Base Station Outdoor Cabinet installation. Contents Structure of safety statements Safety - specific hazards Product safety ..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor 401-703-516 Use pursuant to applicable agreements...
Consequences if protective measures fail Avoidance message Protective measures to take to avoid the hazard Identifier The reference ID of the safety statement (optional) ..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 11
Within this IP, the safety label typically includes additional information such as the hazard type, a description of the damage that can be caused, and the steps that should be taken to avoid the hazard..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 401-703-516 Use pursuant to applicable agreements...
Page 12
Incorrect reassembly can cause electrical shock when the unit is subsequently used..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Lightning strikes are possible during stormy weather and could result in death or severe injury. Do not work on the installation itself or on the power supply lines or antenna feeders of a 9927 during stormy weather. WARNING Energy Hazard! Some parts of all electrical installations are energized.
Page 14
Operating the unit when condensation moisture is present can destroy the unit. Units which show signs of condensation must be dried before installation..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 15
• A ½-inch eyebolt will thread less than half a thread into a 12-mm lifting nut. Do NOT force ½-inch eyebolts into 12-mm lifting nuts. Doing so will damage the threads of the lifting nuts..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 401-703-516 Use pursuant to applicable agreements...
P roduct overview for 9927 Distributed Base Station Outdoor cabinet Overview Purpose This chapter provides an overview of the 9927 Distributed Base Station Outdoor Cabinet. Contents Network view Configurations Product overview Physical description Components inside cabinet 2-13 Weights and dimensions of equipment...
..............................................Network view Overview The 9927 Distributed Base Station is a Multi-Technology, Multi-Band BTS that supports multiple access technologies. The RRHs are multi-functional and support both CDMA and LTE. For CDMA, the MT-BBU interfaces with the RRHs via optical link.
Configurations Configurations In FID 15364.0, the 9927 Distributed BTS supports the following configurations: • Up to 4 carriers/3 sectors PCS (1x-A and EVDO) with 4-BR, if PCS RRH is shared with LTE [5 MHz on G block (band class 25)].
The signal flow diagram below shows how CDMA, 1xEV-DO, and LTE signals are routed from the baseband cabinet to the RRHs. One sector is shown. CDMA is processed by the Digital Shelf, which uses 9927 common platform architecture. Backhaul to the Network is accomplished with T1/E1 lines, fiber optic cable, or microwave.
Page 21
Product overview for 9927 Distributed Base Station Product overview Outdoor cabinet ..............................................Requirements Values Integrated Power Power Up to two 60ECv2 battery cabinets Battery backup -48 VDC Operating Voltage 3,sector Sectors Up to 16 T1/E1s (optional) T1/E1 Facilities 32 for external User Alarms...
Product overview for 9927 Distributed Base Station Physical description Outdoor cabinet ..............................................Physical description Diagram The figure below shows the 9927 Distributed BTS outdoor cabinet with the front door closed..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements...
Product overview for 9927 Distributed Base Station Physical description Outdoor cabinet ............................................................................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
Page 24
Product overview for 9927 Distributed Base Station Physical description Outdoor cabinet ..............................................The figure below illustrates the position of each component inside the 9927 Distributed BTS cabinet..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements...
Page 25
Product overview for 9927 Distributed Base Station Physical description Outdoor cabinet ..............................................The following figure is a left-side view of the 9927 Distributed Base Station Outdoor Cabinet. The dimensions are shown in mm and inches..............................................9927 Dist BTS Outdoor Alcatel-Lucent –...
Page 26
Product overview for 9927 Distributed Base Station Physical description Outdoor cabinet ..............................................The following figure is a front view of the 9927 Distributed Base Station Outdoor Cabinet. The dimensions are shown in mm and inches..............................................2-10 Alcatel-Lucent – Proprietary...
Page 27
Physical description Outdoor cabinet ..............................................The following figure is a right-side view of the 9927 Distributed Base Station Outdoor Cabinet. The dimensions are shown in mm and inches. Description This 9927 Distributed Base Station Outdoor Cabinet features Fresh Air Cooling (FAC).
Page 28
Physical description Outdoor cabinet ..............................................The 9927 Distributed Base Station Outdoor Cabinet is equipped with the following features: • Filter Life Alarm - The cabinet has a pressure sensing alarm that sends an alarm when more than the normal amount of suction is needed to draw air into the baseband cabinet.
..............................................Components inside cabinet Purpose This section lists the components that can be populated in the 9927 Distributed Base Station Outdoor Cabinet. 9927 Distributed Base Station Outdoor Cabinet components The table below lists the components inside the 9927 Distributed Base Station Outdoor Cabinet.
The weights and dimensions, listed in the table below, include the top solar shield. 9927 Distributed Base Station Outdoor Cabinet weights and dimensions The table below lists the weights and dimensions for a half-loaded and fully-loaded 9927 Distributed Base Station Outdoor Cabinet.
Page 31
Product overview for 9927 Distributed Base Station Weights and dimensions of equipment Outdoor cabinet ..............................................Component weights The following table provides approximate weights for batteries and other miscellaneous hardware. Item Weight 45 kg (100 lbs) 12IR145 battery 6 kg (14 lbs)
Page 32
Weights and dimensions of equipment Outdoor cabinet ..............................................9927 Distributed Base Station Outdoor Cabinet dimensions The following figure is a left-side view of the 9927 Distributed Base Station Outdoor Cabinet. The dimensions are shown in mm and inches..............................................2-16 Alcatel-Lucent –...
Page 33
Product overview for 9927 Distributed Base Station Weights and dimensions of equipment Outdoor cabinet ..............................................The following figure is a front view of the 9927 Distributed Base Station Outdoor Cabinet. The dimensions are shown in mm and inches..............................................9927 Dist BTS Outdoor Alcatel-Lucent –...
Page 34
Product overview for 9927 Distributed Base Station Weights and dimensions of equipment Outdoor cabinet ..............................................The following figure is a right-side view of the 9927 Distributed Base Station Outdoor Cabinet. The dimensions are shown in mm and inches..............................................2-18 Alcatel-Lucent –...
Page 35
60ECv2 description This topic provides a description of the 60ECv2 battery cabinet. The optional 60ECv2 battery cabinet provides battery backup for the 9927 Distributed Base Station Outdoor Cabinet. The 60ECv2 battery cabinet can contain up to (20) 12IR-145 batteries. Up to two 60ECv2 battery cabinets can be installed to the right of the 9927 Distributed Base Station Outdoor Cabinet.
Page 36
Product overview for 9927 Distributed Base Station 60ECv2 battery cabinet overview Outdoor cabinet ............................................................................................2-20 Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 37
P roduct overview for RRHs Overview Purpose This chapter provides an overview of the Alcatel-Lucent Remote Radio Head, with optional power and battery back up. Contents Typical RRH/antenna array External views of RRHs Detailed physical description Functional description of RRHs 3-18 Antenna Remote Electronic Tilt (RET) —...
Typical RRH/antenna array ..............................................Typical RRH/antenna array Typical RRH/antenna arrays on tower The figure below shows a typical RRH/antenna array on a tower..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
The following figure is an orthogonal view of the 1900 MHz, PCS, 4x40W (25 MHz) RRH. Dimensions are shown in mm. (13.0) (22.8) (17.3) ..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
Page 40
The following figure is an orthogonal view of the OEM1, 800 MHz, 2x50W RRH. Dimensions are shown in mm. 800 Mhz (23 kg/50.6 lbs) ..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 41
The following figure is an orthogonal view of the OEM2, 800 MHz, 2x50W RRH. Dimensions are shown in mm. 800 Mhz (23 kg/50.6 lbs) ..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
Page 43
Front view of 1900 MHz, PCS, 4x40W (25 MHz) RRH The following figure is a front view of the 1900 MHz PCS, 4x40W (25 MHz) RRH..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 401-703-516 Use pursuant to applicable agreements...
Page 44
Top view of 1900 MHz, PCS, 4x40W (25 MHz) RRH The following figure is a top view of the 1900 MHz PCS, 4x40W (25 MHz) RRH..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 45
The following figure shows the connectors on the bottom of the 1900 MHz, PCS, 4x40W (25 MHz) RRH. Tx2 MON AUX Rx2 AUX Rx1 CPRI PRI CPRI SEC ASIG Tx2 MON ..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
Page 46
Front view of 1900 MHz, PCS, 4x45W (65 MHz) RRH The following figure is a front view of the 1900 MHz, PCS, 4x45W (65 MHz) RRH..............................................3-10 Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 47
..............................................Top view of 1900 MHz, PCS, 4x45W (65 MHz) RRH The following figure is a top view of the 1900 MHz, PCS, 4x45W (65 MHz) RRH..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 3-11 401-703-516 Use pursuant to applicable agreements...
Page 48
Bottom view of 1900 MHz, PCS, 4x45W (65 MHz) RRH The following figure shows the connectors on the bottom of the 1900 MHz, PCS, 4x45W (65 MHz) RRH..............................................3-12 Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 49
The following figure is a front view of the OEM1, 800 MHz, 2x50W RRH. Top view of OEM1, 800 MHz, 2x50W RRH The following figure is a top view of the OEM1, 800 MHz, 2x50W RRH..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 3-13 401-703-516...
Page 50
Front view of OEM2, 800 MHz, 2x50W RRH The following figure is a front view of the OEM2, 800 MHz, 2x50W RRH..............................................3-14 Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 51
STATUS Tx1 MON -48 V IN Tx2 MON Bottom view of 1900 MHz, 4x40W (65 MHz) RRH Get figs from attachment! ..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 3-15 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
Page 52
TX/RX1 (at top of RRH) Transmit and receive, antenna path 1 TX/RX2 (at top of RRH) Transmit and receive, antenna path 2 ..............................................3-16 Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 53
CPRI optical daisy-chained port STATUS 2 x 8 pin circular TX1 MON TX2 MON -48 V IN –48 VDC input power ..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 3-17 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
Page 55
Antenna Remote Electronic Tilt (RET) equipment. The PCS RRH 4x and 800 MHz RRH 2x are hardware ready to support the third party RET..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 3-19 401-703-516...
The antenna assembly is mounted opposite the RRHs. Wall mounted RRHs The following figure shows a typical RRH mounted on a wall with Unitstruts..............................................3-20 Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 57
Floor Stand mounted RRHs [800 MHz and 4x40W (25 MHz) PCS] he following figure shows the floor stand that is used with 800 MHz and 4x40W (25 MHz) PCS RRHs. The wall mounting bracket is shown attached..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 3-21 401-703-516...
Page 58
Product overview for RRHs RRH mounting configurations ............................................................................................3-22 Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Weight kg (lbs) Pallet ____ (___) Wall Bracket (RRH) 3.5 (7.7) Side Support Bracket 3.5 (7.7) Pole Bracket (Low Profile) 4.3 (9.5) ..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 3-23 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
Page 60
The grounding points on the 1900 MHz and 800 MHz RRHs are located at the bottom, on the left and right sides..............................................3-24 Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 61
6 feet of a ground bus bar. The following figures show the grounding points on the OEM2 RRH..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 3-25 401-703-516 Use pursuant to applicable agreements...
Page 62
The right–side grounding point on the OEM2 RRH is located at the right bottom, as shown in the figure below. The following figures show the grounding points on the 1900 MHz RRH..............................................3-26 Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 63
The right–side grounding point on the 1900 MHz, 4x40W RRH is located at the right bottom, as shown in the figure below. The following figures shows the grounding points on the 1900 MHz, 4x45W RRH..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 3-27 401-703-516...
Page 64
..............................................The grounding points on the 1900 MHz, 4x45W RRH are located on the bottom, as shown in the figure below..............................................3-28 Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 65
This chapter describes configurations and site layouts for the 9228 Distributed Base Station site. Contents Line-up configuration Line-up configuration Site layout 9927 Distributed Base Station Outdoor Cabinet site layout ..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor 401-703-516 Use pursuant to applicable agreements...
Page 66
Site configurations for 9927 Distributed BTS Outdoor Overview Cabinet Line-up configuration ..............................................Line-up configuration Overview Purpose This section discusses the line-up configuration for the 9927 Distributed Base Station Outdoor Cabinet. Contents Line-up configuration ..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements...
Page 67
Line-up configuration ..............................................Line-up configuration Purpose This section describes the only line-up that is available for the 9927 Distributed Base Station Outdoor Cabinet. Line-up At the present time, the only line-up available for the 9927 Distributed Base Station Outdoor Cabinet consists of the 9927 Distributed Base Station Outdoor Cabinet and up to two 60ECv2 battery cabinets.
Page 68
Cabinet Site layout ..............................................Site layout Overview Purpose This section shows the site layout for the 9927 Distributed Base Station Outdoor Cabinet. Contents 9927 Distributed Base Station Outdoor Cabinet site layout ..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements...
..............................................9927 Distributed Base Station Outdoor Cabinet site layout Purpose This section shows how the 9927 Distributed Base Station Outdoor Cabinet and two 60ECv2 battery cabinets can be arranged on a concrete pad. Mounting options The 9927 Distributed Base Station Outdoor Cabinet can be mounted in the following manner: •...
9927 Distributed Base Station Outdoor Cabinet and two 60ECv2 battery cabinets The figure below shows how the 9927 Distributed Base Station Outdoor Cabinet and two 60ECv2 battery cabinets can be situated on a concrete pad. Shown also are the conduits, cables, and support structure associated with the installation.
B asic site preparation requirements and footprints for 9927 Distributed Base Station outdoor cabinet ..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
Page 72
Distributed Base Station outdoor cabinet ..............................................Overview Purpose This chapter provides the site requirements for the installation site for 9927 Distributed Base Station Outdoor Cabinet and the procedures that may be performed to prepare the installation site. Contents Site requirements for 9927 Distributed Base Station Outdoor cabinet...
..............................................Outdoor cabinet Site requirements for 9927 Distributed Base Station Outdoor cabinet Overview Purpose This section describes the requirements for the installation site for the 9927 Distributed Base Station Outdoor Cabinet. Contents Environmental requirements Site requirements Mounting options Support structure, ice bridge and service access clearances...
Environmental requirements for outdoor installations Outdoor cabinet installations are exposed to variations in temperature, humidity, and ventilation. The 9927 Distributed Base Station cabinet has been weather-hardened. When equipped with a heat exchanger, the cabinet will operate under the conditions described in the table below.
Page 75
Basic site preparation requirements and footprints for 9927 Environmental requirements Distributed Base Station outdoor cabinet Site requirements for 9927 Distributed Base Station ..............................................Outdoor cabinet The minimum storage and working temperatures are as follows: • Storage prior to installation: 20 °C (68 °F) •...
• Conduits must be installed, as described in “Conduit requirements” (p. 5-7). • AC electric service for the 9927 Distributed Base Station Outdoor Cabinet must be installed as described in Chapter 8, “Electrical power requirements for 9927 Distributed Base Station Outdoor Cabinet”.
NIU conduit. Flexible conduit Flexible conduit is used in installation to connect cables to the 9927 Distributed Base Station Outdoor Cabinet. It is the responsibility of the customer to provide all flexible conduit and associated fittings to the installer.
Page 78
Basic site preparation requirements and footprints for 9927 Site requirements Distributed Base Station outdoor cabinet Site requirements for 9927 Distributed Base Station ..............................................Outdoor cabinet • American Concrete Institute (ACI) • American National Standard Institute (ANSI) • American Standard Testing Methodology (ASTM) •...
..............................................Outdoor cabinet Mounting options Purpose This topic describes the mounting options for 9927 Distributed Base Station Outdoor Cabinet. Structural requirements Floor loading, roof loading, and foundations must be considered during site preparation. In some cases, the cell site equipment will not rest directly on the concrete pad, floor, or rooftop.
Page 80
Basic site preparation requirements and footprints for 9927 Mounting options Distributed Base Station outdoor cabinet Site requirements for 9927 Distributed Base Station ..............................................Outdoor cabinet • The rooftop must be able to support the maximum weight of the cabinets and other auxiliary equipment.
Hybriflex and microwave cable runs, and to protect them from falling ice. The height and position of the ice bridge must not interfere with access to the connections at the left or right of the 9927 Distributed Base Station cabinet. Service access clearances Proper clearance must be provided around the cabinet to allow for service access.
Basic site preparation requirements and footprints for 9927 Anchoring requirements Distributed Base Station outdoor cabinet Site requirements for 9927 Distributed Base Station ..............................................Outdoor cabinet Anchoring requirements Overview Cabinet anchoring must meet all requirements of the local codes, taking into consideration the seismic zone of the installation site.
..............................................Outdoor cabinet Anchoring footprints New site anchoring footprint for 9927 Distributed Base Station Outdoor Cabinet and 60ECv2 battery cabinet The diagram below is an anchoring footprint for the 9927 Distributed Base Station Outdoor Cabinet and 60ECv2 battery cabinet when located side by side.
Page 84
Basic site preparation requirements and footprints for 9927 Anchoring footprints Distributed Base Station outdoor cabinet Site requirements for 9927 Distributed Base Station ..............................................Outdoor cabinet ..............................................5-14 Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516...
Page 85
Site preparation procedures ..............................................Site preparation procedures Overview Purpose This section contains the procedures that must be performed to prepare the site for installation of the 9927 Distributed Base Station Outdoor Cabinet. Contents Drill anchor holes 5-16 ..............................................9927 Dist BTS Outdoor Alcatel-Lucent –...
Page 86
Basic site preparation requirements and footprints for 9927 Drill anchor holes Distributed Base Station outdoor cabinet Site preparation procedures ..............................................Drill anchor holes Purpose Use this procedure to drill anchor holes in a concrete surface for the following: • 9927 Distributed Base Station Outdoor Cabinet •...
Page 87
Basic site preparation requirements and footprints for 9927 Drill anchor holes Distributed Base Station outdoor cabinet Site preparation procedures ....................................................................................... Vacuum out the holes........................................Tape over the open holes to prevent debris from falling inside. Important! Do not install the anchors at this time. Anchors will be installed as part of cabinet installation by equipment installers.
Page 88
Basic site preparation requirements and footprints for 9927 Drill anchor holes Distributed Base Station outdoor cabinet ............................................................................................5-18 Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 89
RRH cabinet clearances Site requirements for pole mount installations Site requirements for wall mount installations 6-11 Site requirements for floor stand installations 6-16 ..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
Page 90
RRH cabinet clearances Site requirements for pole mount installations Site requirements for wall mount installations 6-11 Site requirements for floor stand installations 6-16 ..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Storing RRHs in non-powered state Purpose Important! Alcatel-Lucent does not provide support for RRHs that have been left non-powered for an extended period of time and not stored in an environmentally- controlled space. The Alcatel-Lucent Design Team provides the following guidelines to minimize the build-up of moisture inside RRHs that must remain in the non-powered state for an extended period of time.
The following table provides heat dissipation information for the various types of RRHs. RRH type Estimated DC heat dissipation [typical/maximum] 1900 MHz 750 watts 800 MHz 425 watts ..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
• Tower light power must be installed (if required). • Tower light alarm must be installed (if required). • Cable supports must be installed. Refer to Appendix A, “9927 Distributed Base Station Outdoor Cabinet site preparation checklists” of this document for checklists of detailed requirements. Structural requirements Pole, wall loading, and wind must be considered during site preparation.
(11.82 in.) (11.82 in.) (11.82 in.) Cables provided by Alcatel-Lucent Hybriflex cable shall be provided by Alcatel-Lucent to connect the RRHs to the DC Distribution/Fiber Management Box. The Hybriflex cable contains fiber optic and DC power cables..............................................Alcatel-Lucent – Proprietary...
Page 95
Basic site preparation requirements and footprints for RRH cabinet clearances RRHs Site requirements for RRHs ..............................................Fiber optic cable shall be provided by Alcatel-Lucent to connect the 9927 Distributed BTS outdoor cabinet to the DC Distribution/Fiber Management Box..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary...
The following are required to prepare a site for pole mounting installation of the cabinet. • Install grounding system • Install RF runs • DC Distribution/Fiber Management Box provided by Alcatel-Lucent. • Hybriflex cable provided by Alcatel-Lucent Pole mounting installation requirements The following table provides the specifications for the low profile pole mount.
Page 97
The 800 MHz RRH and 1900 MHz, PCS, 4x40W RRH shall be mounted on a pole, as shown in the figure below. 1900 MHz,4x40W RRH ..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
Page 98
The 800 MHz RRH and 1900 MHz, PCS, 4x45W RRH shall be mounted on a pole, as shown in the figure below..............................................6-10 Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
• Install DC power runs • Install grounding system • Install RF runs • DC Distribution/Fiber Management Box provided by Alcatel-Lucent • fiber cable Wall mounting shall comply with the applicable architectural codes listed on listed earlier in this chapter.
Page 100
The figure below show how holes should be drilled in the wall for mounting the 800 MHz, 2x50W RRH, 1900 MHz, 4x40W (25 MHz) RRH and the 1900 MHz, 4x45W (65 MHz) RRH..............................................6-12 Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 101
Also consult with the building engineer as to local code requirements and wall loading information..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 6-13 401-703-516 Use pursuant to applicable agreements...
Page 102
Tighten the nut to proper torque requirement........................................Repeat Steps 5 and 6 to install the bottom strut. S T E P S ....................................................................................... 6-14 Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 103
..............................................RRH wall mount bracket assembly The following figure shows the completed installation of a wall mount bracket on a Unistrut assembly..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 6-15 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
(5/8 in.) (2 in.) 3, 4 M12 x 125 mm 18 mm 100 mm 79 (700) (11/16 in.) (4 in.) ..............................................6-16 Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 105
The floor stand in the figure below is for installing an 800 MHz, 2x50W 1900 MHz, 4x40W (25 MHz) RRH on a floor..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 6-17 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
Page 106
The minimum depth of the hole is 76.2 mm (3.00”)..............................................6-18 Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 107
Center floor stand over the drilled anchor holes........................................Set and torque the anchor bolts. S T E P S ....................................................................................... 9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 6-19 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
Page 108
Basic site preparation requirements and footprints for Site requirements for floor stand installations RRHs ............................................................................................6-20 Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 109
B asic site preparation requirements and footprints for DC Distribution/Fiber Management Box ..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
Page 110
Box and goes to the RRHs. Contents Cabinet clearances for DC Distribution/Fiber Management Box Site requirements for wall mount installation of DC Distribution/Fiber Management Box ..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 111
Right 152.4 (6) Installation access Left 152.4 (6) Installation access 152.4 (6) Installation access Bottom 304.8 (12) Conduit routing ..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
Page 112
• M10 (3/8 inch) lock washers (4). Location of DC Distribution/Fiber Management Box The DC Distribution/Fiber Management Box should be installed within a 25 foot conduit distance from the 9927 Distributed BTS outdoor cabinet..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor...
Page 113
Also consult with the building engineer as to local code requirements and wall loading information. Proceed as follows to install the Unistrut........................................Determine the layout of the struts that will support the cabinet..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
Page 114
To install the top strut, place the top strut against the wall. Drive the anchor bolts into the holes of the strut until nut and washer are flush with the strut........................................Tighten the nut to proper torque requirement..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 115
Repeat Steps 5 and 6 to install the bottom strut. S T E P S ........................................Wall mount strut assembly The following figure shows a completed wall mount strut assembly..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
Page 116
There is a hole for a bolt in each corner of the DC Distribution/Fiber Management Box. The DC Distribution/Fiber Management Box is fastened to the wall with bolts via Unistruts..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 117
E lectrical power requirements for 9927 Distributed Base Station Outdoor Cabinet Overview Purpose This chapter provides AC electrical power requirements for the 9927 Distributed Base Station cabinets when installed at a new site. Contents Power overview Power systems Backup power systems...
Station Outdoor Cabinet Power overview ..............................................Power overview Overview Purpose This section provides an overview of the power requirements for 9927 Distributed Base Station Outdoor Cabinet. Contents Power systems Backup power systems Electrical service requirements for 9927 Distributed Base Station outdoor cabinet ..............................................
..............................................Power systems Integrated power The 9927 Distributed Base Station Outdoor Cabinet that is equipped with integrated power. A rectifier module converts site AC power to -48 VDC, which powers the cabinet. The rectifier module is located inside the cabinet.
The 60ECv2 Battery Cabinet provides -48 VDC battery backup for the 9927 Distributed Base Station Outdoor Cabinet. One or two 60ECv2 battery cabinets can be connected to the 9927 Distributed Base Station Outdoor Cabinet. The batteries are charged by the rectifier module inside the 9927 Distributed Base Station Outdoor Cabinet.
Electrical service requirements for 9927 Distributed Base Station outdoor cabinet Electrical service requirements for the 9927 Distributed Base Station Outdoor Cabinet The electrical service requirements for the 9927 Distributed Base Station Outdoor Cabinet are listed on the cabinet nameplate. They are as follows: •...
Outdoor Cabinet Power requirements for 9927 Distributed Base Station Outdoor Cabinet Overview Purpose This section describes the power requirements for the 9927 Distributed Base Station Outdoor Cabinet. Contents General requirements AC convenience outlet, AC PDA, and AC line surge protection...
AC branch circuit load center for supplying power to the AC equipment at the site. All AC power wiring, distribution, and protection equipment must be installed during site preparation. The site must be ready to accept installation of the 9927 Distributed Base Station Outdoor Cabinet.
When a North American NEMA 15A-240V duplexed AC convenience outlet is equipped, a terminal is provided for the connection of the neutral conductor for this outlet. The AC PDA in the 9927 Distributed Base Station cabinet can only be used for distributing AC power to Alcatel-Lucent equipment.
Page 125
Electrical power requirements for 9927 Distributed Base AC convenience outlet, AC PDA, and AC line surge Station Outdoor Cabinet protection Power requirements for 9927 Distributed Base Station ..............................................Outdoor Cabinet protector, and AC wires from the service panel to the applicable cabinet, are not supplied with the power cabinet.
27 mm (3-AWG) wire may be used if the terminals on each end of the input conductors are marked “75° C.” The AC input terminal block in the 9927 cabinet is rated at 75° C. In Canada, 13.3 mm (6 AWG) wire is required for telecommunications primary protector grounding.
Power requirements for new site installation of 9927 Distributed Base Station Outdoor Cabinet How to determine power requirements for 9927 Distributed Base Station Outdoor Cabinet The primary source for power requirements is Engineering Rules for Factory and Field Installation Kits for 9927 Distributed Base Station, ER_0105_0006.
Electrical power requirements for 9927 Distributed Base Battery Reserve Times for batteries inside 60ECv2 battery Station Outdoor Cabinet cabinet Power requirements for 9927 Distributed Base Station ..............................................Outdoor Cabinet Battery Reserve Times for batteries inside 60ECv2 battery cabinet Battery Reserve Times for battery strings inside 60ECv2 battery cabinet The table below lists the Battery Reserve Times for 12IR145 battery strings inside the 60ECv2 battery cabinet.
Page 129
RRHs Overview Purpose This chapter provides guidelines for running electrical power to the RRHs, when the RRHs are up to 15 m from the 9927 Distributed Base Station Outdoor Cabinet. Contents Power requirements (general) Power consumption DC power requirements for RRHs ..............................................
Page 130
1900 MHz, 4x40 W 690 Watts, 15 Amps 1900 MHz, 4x45 W 750 Watts, 17 Amps 800 MHz, 2x50 W 450 Watts, 9.0 Amps ..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 131
Power Consumption for RRHs RRH type Power Draw Typical (watts) 1900 MHz, PCS, 4x40W (25 MHz) 1900 MHz, PCS, 4x45W (65 MHz) 800 MHz, 2x50W ..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
Page 132
DC power requirements for RRHs DC feeders between 9927 Distributed Base Station Outdoor Cabinet and RRHs The DC feeder cable, from the 9927 Distributed BTS outdoor cabinet to the DC Distribution/Fiber Management Box, is routed in flexible metallic conduit. Hybriflex cable is routed from the DC Distribution/Fiber Management Box to the RRHs.
Page 133
Site preparation requirements for 9927 Distributed Base Station Outdoor cabinet GPS antenna and microwave antenna cable ..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor 10-1 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
Page 134
Site preparation requirements for 9927 Distributed Base Overview Station Outdoor cabinet GPS antenna and microwave antenna cable ..............................................Overview Purpose This chapter discusses site preparation requirements for GPS and microwave antennas at the 9927 Distributed Base Station Outdoor Cabinet. Contents...
Page 135
The following are general requirements for the GPS antenna. • All materials for outdoor antenna cables must be rated for outdoor use. • Alcatel-Lucent recommended antenna jumper cables, or equivalent, must be used. • All antenna cable runs must be appropriately supported, in accordance to the connector and cable manufacturer's instructions.
Page 136
7/16 DIN-Female Connector On Antenna Cable * GPS jumper cable and field installed surge protector to 9927 Distributed BTS outdoor cabinet GPS port (1 place) Recommended GPS antenna cable Important! The recommended cable type should be outdoor (UV) and riser (fire retardant) rated.
Page 137
Verify GPS antenna installation It is recommended that a Garmin 45XL (or equivalent) GPS should be used to verify GPS antenna installation and line-of-site before installing the 9927 Distributed Base Station Outdoor Cabinet. For detailed GPS antenna installation instructions, refer to Appendix E, “GPS antenna...
Page 138
There can be up to 16 microwave cables (4 sets of 4–pack cables) entering the top-rear of the 9927 Distributed Base Station Outdoor Cabinet. In site preparation, approximately 10 feet of each microwave cable must be coiled about six feet from the top-rear of the cabinet.
Page 139
The microwave antenna cable shield shall be bonded every _________ feet. Grounding of the antenna cable outer shield must be performed in accordance with the ground kit manufacturer's instructions, as outlined in Grounding and Lightning Protection Guidelines for Alcatel-Lucent Network Wireless System Cell Sites, 401-200-115..............................................9927 Dist BTS Outdoor Alcatel-Lucent –...
Page 140
Site preparation requirements for 9927 Distributed Base Site preparation for microwave antenna cables Station Outdoor cabinet GPS antenna and microwave antenna cable ............................................................................................10-8 Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 141
This chapter provides an overview of RF antenna interface requirements for RRHs. Contents Antenna requirements 11-2 Surge protection requirements 11-3 General antenna cable requirements 11-4 ..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor 11-1 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
Page 142
In order to support location-based services, all antennas that serve a sector must be within a circle no more than 15 m in diameter..............................................11-2 Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 143
General requirements The RF Filter inside the RRH is already equipped with a surge protector. RF surge protection is not required for standard star configurations (one RRH per sector)..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 11-3 401-703-516 Use pursuant to applicable agreements...
Page 144
Grounding of the antenna feeder cable outer shield must be performed in accordance with the manufacturer's grounding kit instructions. The following are general antenna requirements: • Alcatel-Lucent recommended antenna cables should be used. • All antenna cable runs must be appropriately supported in accordance with the connector and cable manufacturer instructions.
Page 145
Antenna jumper cable at the baseband cabinet end must be equipped with a 7-16 DIN center pin straight male connector. • Surge protection (not required for outdoor) • properly grounded..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 11-5 401-703-516 Use pursuant to applicable agreements...
Page 146
RF antenna cable requirements for RRHs General antenna cable requirements ............................................................................................11-6 Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 147
9927 Distributed Base Station Outdoor Cabinet Overview Purpose This chapter provides information on grounding and lightning protection requirements for a 9927 Distributed Base Station Outdoor Cabinet site. Contents Grounding requirements 12-2 Surge protection requirements 12-3 Grounding electrode system 12-6 ..............................................
Page 148
Grounding requirements General requirements The 9927 Distributed Base Station Outdoor Cabinet must be grounded by means of an integrated (multipoint) grounding system. The equipment is susceptible to lightning surges because it is associated with towers and antennas. It is therefore imperative that the cell site be properly grounded and that a low impedance path to earth be provided.
Page 149
As part of site preparation, a surge protection device must be installed between each antenna coaxial cable and jumper cable, approximately 1 meter (3 ft.) away from the equipment. They can be obtained from Alcatel-Lucent (KS24577, L-3A for GPS and KS24577, L-4A for RF), or an Alcatel-Lucent-approved equivalent can be used.
Page 150
Grounding and lightning protection requirements for 9927 Surge protection requirements Distributed Base Station Outdoor Cabinet ..............................................Diagram of a typical surge protector installation The following diagram shows a typical surge protector installation. SURGE PROTECTOR DETAIL DIN MALE ANTENNA DIN FEMALE...
Page 151
Grounding and lightning protection requirements for 9927 Surge protection requirements Distributed Base Station Outdoor Cabinet ..............................................Important! If the coaxial run along the tower is more than 60 feet / 18 meters, then the coaxial cable shields to be grounded at multiple points near the antenna and equipment at 100 foot (30 meter) intervals.
Page 152
Grounding electrode system Grounding electrode system requirements 9927 Distributed Base Station Outdoor Cabinet sites must be equipped with a grounding electrode system (that is, buried ring ground, copper clad rod, electrolytic rods, metallic water pipe, etc.). The cell site grounding, including all cabinets and antenna cable shields, must be bonded to the grounding electrode system.
Page 153
Grounding electrode system Distributed Base Station Outdoor Cabinet ..............................................Typical grounding configuration (concrete pad) The following diagram shows the typical grounding configuration for a 9927 Distributed Base Station Outdoor Cabinet site on a concrete pad. Surge Protection Device ..............................................9927 Dist BTS Outdoor Alcatel-Lucent –...
Page 154
Grounding and lightning protection requirements for 9927 Grounding electrode system Distributed Base Station Outdoor Cabinet ..............................................Typical grounding configuration (rooftop) The following diagram shows the typical grounding configuration for a 9927 Distributed Base Station Outdoor Cabinet site on a rooftop. Surge Protection Device ..............................................12-8 Alcatel-Lucent –...
Page 155
This chapter discusses grounding and lightning protection requirements for the RRHs. Contents Grounding and surge protection requirements 13-2 Grounding examples - Remote Radio Head 13-3 ..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor 13-1 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
Page 156
Grounding and surge protection requirements Surge protection in RRHs The RRHs are equipped with internal surge protectors. No external surge protectors are required..............................................13-2 Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 157
Each RRH cabinet must be grounded. The RRH cabinet must be grounded as follows: 1. At the top of cabinet 2. At the right side of cabinet..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 13-3 401-703-516 Use pursuant to applicable agreements...
Page 158
6 feet of RRHs. This applies to antenna sharing/daisy chain installations (two RRHs per sector)..............................................13-4 Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 159
Important! For antenna sharing/daisy chain installations (two RRHs per sector), a grounding bus bar must be installed within 6 feet of the RRHs, to ground the antenna sharing surge protector..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 13-5 401-703-516...
Page 160
Grounding and lightning protection requirements for RRHs Grounding examples - Remote Radio Head ............................................................................................13-6 Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 161
9927 Distributed Base Station Outdoor Cabinet Overview Purpose This chapter describes the site preparation requirements related to T1/E1 and User Alarm facilities for 9927 Distributed Base Station Outdoor Cabinet. Contents Balun Block requirements 14-2 Site preparation for T1/E1 and User Alarm cables...
Page 162
Refer to Balun Blocks #4 and #5 in the following table. Balun Block connections Important! The Balun Block must be installed within 10 m (35 feet) of the 9927 cabinet. The T1/E1 cable will be connected directly to the Balun Block. Four RJ-45 loose connectors will be provided with each Balun Block.
Page 163
T1/E1 and User Alarm cables are both twisted-pair cables that are connected on one side to the Network Interface Unit (NIU) and on the other side to the 9927 Distributed Base Station Outdoor Cabinet. The site preparation for T1/E1 and User Alarm cables is performed at the same time.
Page 164
..............................................Connect T1/E1 cables and User Alarm cables to NIU The T1/E1 and User Alarm facilities must be in place prior to installation of the 9927 Distributed Base Station Outdoor Cabinet. The service provider usually supplies a carbon or gas tube protector for the T1/E1 facility. The 9927 Distributed Base Station Outdoor Cabinet is already equipped with Listed primary surge protection.
Page 165
..............................................The recommendations for NIU conduit are as follows: • The rigid NIU conduit must be installed from the NIU to the 9927 Distributed Base Station Outdoor Cabinet. • Use PVC conduit instead of rigid NIU conduit if it is to be buried. Use metal conduit if it is to be exposed.
Page 166
This section describes how to determine the T1/E1 line assignments for T1/E1 cables, and record them in a table that will be used during installation. T1/E1 line assignments for 9927 Distributed Base Station Outdoor Cabinet with SEC-B (20 T1/E1 lines, maximum) The following table provides the installer with T1/E1 line assignments for 9927 Distributed Base Station Outdoor Cabinet with four SEC-Bs.
Page 167
Site preparation -- T1/E1 and User Alarm facilities for 9927 Specify assignments for T1/E1 lines Distributed Base Station Outdoor Cabinet ..............................................SEC-B T1/E1 Line # Function Tx/Rx RJ-45 Pinout # Wire Color Rx ____-T White-Orange Rx ____-R Orange-White Tx ____-T...
Page 168
Site preparation -- T1/E1 and User Alarm facilities for 9927 Specify assignments for T1/E1 lines Distributed Base Station Outdoor Cabinet ..............................................SEC-B T1/E1 Line # Function Tx/Rx RJ-45 Pinout # Wire Color Rx ____-T White-Orange Rx ____-R Orange-White Tx ____-T...
Page 169
The resistance of a “closed circuit” is less than 100 ohms. The resistance of an “open circuit” is greater than 1 megohm. The User Alarm switches (if desired) must be installed as part of site preparation. The 9927 Distributed Base Station Outdoor Cabinet cabinet is equipped with primary surge protection. User Alarm cable connections The table below provides the pin numbers, wire colors, and functions for the User Alarm cables in the 9927 Distributed BTS outdoor cabinet.
Page 170
Site preparation -- T1/E1 and User Alarm facilities for 9927 Site preparation for User Alarm cables Distributed Base Station Outdoor Cabinet ..............................................Facilities 37 pin Wire Color Cable 1 function Cable 2 function cable D-Sub User Alarm White-Blue USERALM0 (+)
Page 171
Site preparation -- T1/E1 and User Alarm facilities for 9927 Site preparation for User Alarm cables Distributed Base Station Outdoor Cabinet ..............................................Facilities 37 pin Wire Color Cable 1 function Cable 2 function cable D-Sub Blue- USERALM15 (-) USERALM31 (-) Yellow ..............................................
Page 172
Site preparation -- T1/E1 and User Alarm facilities for 9927 Site preparation for User Alarm cables Distributed Base Station Outdoor Cabinet ............................................................................................14-12 Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 173
This chapter discusses the fiber optic cable requirements for the RRHs. The fiber optic cables are contained within the Hybriflex cable. Contents General facilities requirements 15-2 Facilities requirements 15-3 Requirements for Hybriflex cable 15-4 ..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor 15-1 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
Page 174
The fiber optic cables that exit the Hybriflex cable are terminated with LC connectors. All facilities must be available before the RRHs can be installed..............................................15-2 Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 175
The figure below shows the cable entry points on the bottom of the 800 MHz RRH. CPRI PRI AUX RX2 CPRI PRI AUX Rx1 STATUS Tx1 MON -48 V IN Tx2 MON ..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 15-3 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
Page 176
The fiber optic and DC power cables branch out at the pole end from the Hybriflex cable. The individual cables are 4.6 m (15 feet) long. The Hybriflex cable provided by Alcatel-Lucent meets the following requirements: • Outdoor rated • Temperature rating: operation -40 to +85 °C (-40 to 185 °F), storage -55 to +85 °C (-67 to 185 °F)
Page 177
LC connector. All cables are weather and sunlight resistant. Shown in the figure below is the RRH end (or top end) of the Hybriflex cable..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 15-5 401-703-516...
Page 178
The DC Distribution/Fiber Management Box contains: • DC surge protectors • DC circuit breakers • DC terminal blocks • Fiber optic cable interface connectors ..............................................15-6 Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 179
• Contains 12 25 Amp, DC circuit breakers (can go up to 24) • DC terminal block • Must be Installed within 6.1 m (20 feet) of the 9927 Distributed BTS outdoor cabinet. The block diagram below shows two 1–1/2 liquid-tight flexible metallic conduits and one Hybriflex cable entering the DC Distribution/Fiber Management Box.
Page 180
..............................................9927 Distributed BTS cabinet to the RRHs, make certain fiber cable connector “B” is connected to Tx on the 9927 Distributed BTS cabinet and fiber cable connector “A” is connected to Rx on the RRH. Important! “A” and “B” designations are typically imprinted on the LC connector clip.
Page 181
Appendix A: 9927 Distributed Base Station Outdoor Cabinet site preparation checklists Overview Purpose This section is for use by authorized personnel to verify completion of cell site preparation activities prior to installation of base station equipment. Contents SP-GEN Cell site general information form...
9927 Distributed Base Station Outdoor Cabinet site SP-GEN Cell site general information form preparation checklists ..............................................SP-GEN Cell site general information form Purpose The following form must be completed prior to the installation of the cell site equipment. Form Complete the following information about the cell site.
9927 Distributed Base Station Outdoor Cabinet site SP-1 Site preparation general checklist preparation checklists ..............................................SP-1 Site preparation general checklist Purpose The following items must be completed prior to the installation of the cell site equipment. Circle the correct letter for the corresponding item descriptions.
Page 184
9927 Distributed Base Station Outdoor Cabinet site SP-1 Site preparation general checklist preparation checklists ..............................................Item # Description Yes (Y) No (N) Comments Is adequate primary surge protection provided for the T1/E1 service entrance? Are the T1/E1 long enough to reach from...
9927 Distributed Base Station Outdoor Cabinet site SP-2 Site preparation power source checklist preparation checklists ..............................................SP-2 Site preparation power source checklist Purpose The following items must be completed prior to the installation of the cell site equipment. Circle the correct letter for the corresponding item descriptions.
9927 Distributed Base Station Outdoor Cabinet site SP-3 Site preparation grounding checklist preparation checklists ..............................................SP-3 Site preparation grounding checklist Purpose The following items must be completed prior to the installation of the cell site equipment. Circle the correct letter for the corresponding description items.
Page 187
9927 Distributed Base Station Outdoor Cabinet site SP-3 Site preparation grounding checklist preparation checklists ..............................................Item # Description Yes (Y) No (N) Comments Are all ground connections in compliance with Alcatel-Lucent requirements (exothermic weld, compression type with 2-hole lugs; properly secured; antioxidant...
Page 188
9927 Distributed Base Station Outdoor Cabinet site SP-3 Site preparation grounding checklist preparation checklists ..............................................Item # Description Yes (Y) No (N) Comments Are down conductors in compliance with Alcatel-Lucent specifications? (If building is less than 23 meters (75 ft.) high, use two 33.6 mm...
Is GPS antenna cable properly grounded, and equipped with proper surge protection device? Are proper service loops provided near antenna? Is proper drip loop provided at the 9927 Distributed Base Station Outdoor Cabinet antenna cable cover? Are cable connections torqued to the appropriate value?
Page 190
9927 Distributed Base Station Outdoor Cabinet site SP-5 Site preparation GPS antenna checklist preparation checklists ..............................................Item # Description Yes (Y) No (N) Comments Was GPS antenna location verified for line of sight using a Garmin 45XL test unit or...
9927 Distributed Base Station Outdoor Cabinet site SP-6 Site preparation punchlist sheet preparation checklists ..............................................SP-6 Site preparation punchlist sheet Purpose The following punchlist is used to track any outstanding site preparation items. Punchlist Item # Comment/Description Severity Corrective Action...
9927 Distributed Base Station Outdoor Cabinet site SP-6A Site preparation punchlist sheet preparation checklists ..............................................SP-6A Site preparation punchlist sheet Purpose The following punchlist is used to track any outstanding site preparation items. Punchlist Item Comment/Description Severity Corrective Action (1/2/3)
Page 193
SP-3 Site preparation grounding checklist SP-4 Site preparation RF antenna checklist SP-5 Site preparation punchlist sheet B-11 SP-5A Site preparation punchlist sheet B-12 ..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
(or equivalent)? Are fiber optic facilities (splicing/DC Distribution/Fiber Management Box) available and active? ..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
Page 196
Have all necessary arrangements been made for access to the site? Have all necessary arrangements been made to get equipment onto the site (crane, etc.)? ..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 197
Site preparation checklists for RRHs SP-1 Site preparation general checklist ..............................................Notes: Completed by: ______________________ Date: _______ ..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
(GFCI) type is recommended, and must be used when required by code. Is each outlet protected by a UL/CSA listed, or approved 15 A circuit breaker? ..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Is ice bridge bonded at both ends and 7.62-meter (25-foot) intervals? ..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
Page 200
Are the RF surge protection devices properly connected to the ground system? Notes: Completed by: ______________________ Date: _______ ..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Are all antennas the proper type? Are all antennas at proper azimuth? (0,120 or 240 degrees) Are antennas at proper height? Are antennas at proper tilt? ..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
Page 202
Comments Have diversity antennas been properly separated? Are antenna hatchplate and cable boots properly installed? Notes: Completed by: ______________________ Date: _______ ..............................................B-10 Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Inspection Checklist Completion Sign-Off (complete below) Was the punchlist continuation sheet on the next page used? Yes or No Inspector's Name: ______________________ Inspector's Signature: _____________________ Date: _________ ..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary B-11 401-703-516 Use pursuant to applicable agreements...
The following punchlist is used to track any outstanding site preparation items. Item # Comment/Description Severity Corrective Action (1/2/3) Required (Y/N) Completed Date ..............................................B-12 Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 205
Appendix C: 9927 Distributed Base Station Outdoor Cabinet cell site information Overview Purpose This section is for use by Customer Project Management to document cell site configuration information. Contents CSC-1 Cell site configuration information ..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor...
Page 206
9927 Distributed Base Station Outdoor Cabinet cell site CSC-1 Cell site configuration information information ..............................................CSC-1 Cell site configuration information General base station information Complete the following cell site information: Cell Site information (provided by inspector) Name Address Contact name...
Page 207
• □ Zone 0 • □ Zone 1 • □ Zone 2 • □ Zone 3 • □ Zone 4 Base station equipment Complete the information for the 9927 Distributed Base Station Outdoor Cabinet equipment: Cabinet Type Serial # # of sector Duplex/...
Page 208
9927 Distributed Base Station Outdoor Cabinet cell site CSC-1 Cell site configuration information information ..............................................Integrated power? • □ Yes • □ No External power? • □ Yes • □ No Power collocated with base station equipment? • □ Yes •...
Page 209
9927 Distributed Base Station Outdoor Cabinet cell site CSC-1 Cell site configuration information information ..............................................Equipment description Yes (Y) No (N) AC Service: Size (amps) ____ Voltage (v) ____ Phase (1 or 3) ____ Customer-supplied Power System? NOTE: If YES, the customer is responsible for the configuration of the power system.
Page 210
9927 Distributed Base Station Outdoor Cabinet cell site CSC-1 Cell site configuration information information ............................................................................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 211
Appendix D: Guidelines for lifting and moving cabinets Overview Purpose This Appendix provides guidelines for lifting and moving the 9927 Distributed Base Station Outdoor Cabinet cabinets and the 60ECv2 battery cabinet. Contents Lifting and moving cabinets ..............................................Alcatel-Lucent – Proprietary...
Page 212
9927 cabinet if too much tension is applied to the straps. When a dolly with straps is used to move the 9927 Distributed Base Station Outdoor Cabinet, adjust the straps and the tension so that the air filter cover and the rear muffler cover are not damaged by the straps.
Page 213
½ inch eyebolts into 12 mm lifting nuts. Doing so will damage the threads of the lifting nuts. Install lifting eyebolts on 9927 cabinets Four R-ITE-6110 M12, or Four R-ITE-6113 1/2-inch lifting eyebolts are screwed into the lifting nuts on the top of the cabinet, as shown in the following figure.
Page 214
Important! Do NOT use R-ITE-6110 M12 eyebolts to lift the 60ECv2 cabinet. Lifting eyebolts Sling ..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 215
Use slings that are long enough to keep the lifting sling angle at greater than 45 degrees from the top of the cabinet..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 401-703-516...
Page 216
Always lift cabinets carefully. Also, keep the boom line tight to prevent the cabinet from tipping while the cabinet is being moved. At the end of the lift, slowly place the cabinet on the ground..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 217
RF interference considerations Lightning interference consideration GPS antenna mount kit GPS antenna mounting instructions E-11 Active GPS antenna Standard Wave Ratio (SWR) test E-15 ..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
Page 218
It is desirable that the antenna has the clearest view to the south, east, and west in the northern hemisphere and to the north, east, and west in the southern hemisphere..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 219
This example assumes, of course, that the monopole is the only obstruction to be considered, and constitutes a contiguous 12.5% blockage of the sky. This condition would constitute a contiguous blockage in one quadrant of the hemisphere..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 401-703-516 Use pursuant to applicable agreements...
The GPS antenna should not be located within 10 feet horizontally and 10 feet vertically from any actively transmitting antenna..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Industry standard practices for lightning protection should be followed for GPS antenna installations. Several sources for such information are: • Grounding and Lightning Protection Guidelines for Alcatel-Lucent Network Wireless System Cell Sites, 401-200-115 • National Fire Protection Association (NFPA), NFPA 780, Standard for Installation of Lightning Protection Systems •...
Page 222
150 foot sphere that touches both lightning rods, as shown in the following diagram..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 223
Example: If the pole is 50 feet tall, then D=8.3 feet. (50/6 = 8.3). Refer to the following diagram for more detail..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
Page 224
GPS antenna installation Lightning interference consideration ............................................................................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 225
The following table provides description of the mounting kit parts. Collar Bracket Mount Kit (Part #602214) Item # Part # Quantity Description 602186 Collar ..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
Page 226
0.25" - 20 UNCx2.5" Hex Head Cap Screw 9963-256 0.25" - 20 UNCx3.25" Hex Head Cap Screw 9974-15 0.25" Lockwasher 9999-57 0.25" - 20 Hex Nut ..............................................E-10 Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
With Gasket, Item 2, on top of the L- Bracket, insert cable assembly through L-Bracket and Gasket. Attach the cable assembly to the GPS antenna and tighten the connector as required..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary E-11 401-703-516...
Page 228
6b to suit) and Items 4b, 7b and 8b. Locate in desired position. GPS ANTENNA “L” TYPE BRACKET SHORT SCREWS 5b or “L” - BRACKET MOUNT ........................................Tighten 0.25 inch hardware..............................................E-12 Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 229
COLLAR TYPE MOUNTING BRACKET COLLAR MOUNT BRACKET Captive Screws, Item 3a, through Gasket, Item 2, holes in order to retain Gasket..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary E-13 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
Page 230
3 inches below the bottom of the collar measured on the cable assembly. Important! Weatherproofing is not provided with this kit. S T E P S ....................................................................................... E-14 Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
F2=1580.0 MHz output of Bias-T Antenna SWR spec. MAX SWR = 2.5 (7.4 dB return loss) Digi-Key (800) 344-4539 Mini-Circuits (800) 654-7949 ..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary E-15 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
Page 232
GPS antenna installation Active GPS antenna Standard Wave Ratio (SWR) test ............................................................................................E-16 Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 233
This appendix contains a copy of the document Power & Battery Engineering Rules for Alcatel-Lucent CDMA Modular Cell 4.0B, ER_0102_0004_PWR, which is the primary source for power requirements and battery backup information for the 9927 Distributed Base Station Outdoor Cabinet.
Page 234
Power and Battery Engineering Rules for 9927 Distributed Engineering Rules Document Base Station Outdoor Cabinet ..............................................Engineering Rules Document Description The remaining pages of this appendix are the pages of the Power & Battery Engineering Rules for Alcatel-Lucent CDMA Modular Cell 4.0B, ER_0102_0004_PWR.
Page 235
The presence of the statement indicates that the product does comply with that statement wherever it is required to do so. Contents Canada European Union United States G-10 ..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor 401-703-516 Use pursuant to applicable agreements Issue 1 March 2012...
Page 236
Certification Body. Unauthorized changes may violate the Product Safety Certification. Modifications or changes authorized by official CN/CNN are assumed to have received prior approval from this Lab..............................................Alcatel-Lucent – Proprietary 9927 Dist BTS Outdoor Use pursuant to applicable agreements 401-703-516 Issue 1 March 2012...
Page 237
Health Canada 99-EHD-237. Optical transmitters Alcatel-Lucent declares that 9228 Base Station cabinet complies with the International Electrotechnical Commission (IEC) standards IEC 60825-1 Edition 2.0 (2007) and IEC 60825-2 Edition 3.1 (2007). It is a Class I/1 laser optical fiber communication systems "product"...
Page 238
For more information regarding collection and recovery of packaging and packaging waste within specific jurisdictions, please contact the Alcatel-Lucent Services - Environmental Health and Safety organization. For installations not performed by...
Page 239
Directive 1999/5/EC. The technical documentation as required by the Conformity Assessment procedure is kept at the Alcatel-Lucent location which is responsible for this product. For more information please contact your local Alcatel-Lucent Customer Service Organization. CE marking This product has been CE-marked in accordance with the following European Directive: •...
Page 240
Reference Levels, and if necessary exclusion zones for public and installation workers defined. The following information on Alcatel-Lucent supplied equipment is available from customer representatives: • Output power and antenna characteristic, if the product is equipped with an integral antenna.
Page 241
..............................................Optical transmitters Alcatel-Lucent declares that 9228 Base Station cabinet complies with the CENELEC standards EN 60825-1 Edition 1994 and its amendment 1 (2002) and amendment 2 (2001) and EN 60825-2 Edition 2004. It is a Class I/1 laser optical fiber communication systems “product”...
Page 242
Moreover, in compliance with legal requirements and contractual agreements, where applicable, Alcatel-Lucent will offer to provide for the collection and treatment of Alcatel-Lucent products bearing the logo at the end of their useful life, or products displaced by Alcatel-Lucent equipment offers.
Page 243
EU market after 1 July 2006, with various exemptions, including an exemption for lead solder in network infrastructure equipment. Alcatel-Lucent products shipped to the EU after 1 July 2006 comply with the EU RoHS Directive.
Page 244
Base Station cabinet when deployed in the United States. Federal Communications Commission Important! Changes or modifications not expressly approved by Alcatel-Lucent, Inc. could void the user's authority to operate the equipment. This device complies with Part 15 of the FCC Rules. Operation is subject to the following...
Page 245
This equipment complies with Part 24 - Personal Communications Services, Subpart E - Broadband PCS. This equipment complies with Part 27 - Miscellaneous Wireless Communications Services ..............................................9927 Dist BTS Outdoor Alcatel-Lucent – Proprietary G-11 401-703-516 Use pursuant to applicable agreements...
Page 246
..............................................FDA/IEC optical transmitter product compliance Alcatel-Lucent declares that 9927 Distributed Base Station cabinet complies with the Food and Drug Administration's Center for Devices and Radiological Health (FDA/CDRH) regulations 21 CFR 1040.10 and 1040.11. It is a Class I/1 laser optical fiber communication systems "product"...
Page 247
United States ..............................................Antenna exposure Antenna installations for the 9927 Distributed Base Station cabinet shall be performed in accordance with all applicable manufacturer's recommendations, and national laws and regulations. To ensure correct antenna installation, the antenna installer shall perform all necessary calculations and/or field measurements to evaluate compliance with applicable national laws or regulations regarding exposure to electromagnetic fields.
Need help?
Do you have a question about the 9927 and is the answer not in the manual?
Questions and answers