EmpireCovers Carport 122008R Assembly Manual

Car garage tent

Advertisement

Quick Links

8'
Specification:
Width: 12'
Part Code
1
2
3
3a
4
5
6
7
9
10
11
13
14
15
16
17
18
19
20
Shelter Assembly Manual
Normal Model # Carport 122008R
Length: 20'

122008R Part List

Male Bent Tube
Female Bent Tube
Stake Peg for back door frame
Stake Peg for front door frame
Stake Peg for middle arch frame
Male Horizontal Connecting Tube
Female Horizontal Connecting Tube
Diagonal Bracing Tube
Duckbill Nail
12x1000mm Steel Rod
U bolt
Roof Cover
Front and Back Door Cover
Bolt M8*80mm
Bolt M8*50mm
Bungee
42mm Plastic Plug
28mm Plastic Plug
Rope
12'
Height: 8'
Description
Qty
Box
6
B
6
B
2
C
2
C
8
C
20
C
5
C
2
B
6
B
1
C
6
B
1
A
2
A
30
B
2
B
6
B
12
B
10
B
2
B

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Carport 122008R and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for EmpireCovers Carport 122008R

  • Page 1 Shelter Assembly Manual Normal Model # Carport 122008R 8’ 12’ Specification: Width: 12’ Length: 20’ Height: 8’ 122008R Part List Part Code Description Male Bent Tube Female Bent Tube Stake Peg for back door frame Stake Peg for front door frame...
  • Page 2 IMPORTANT - READ MANUAL FIRST Improper site preparation, Assembly and Maintenance may invalidate warranty and cause unnecessary and costly mistake. If you have any questions contact your local dealer. For User Friendly assembly we have identified each individual component with the part code as indicated in the parts list.
  • Page 3 INSTALLATION PROCESS Arch Frame Installation 1. (Part No. 1* 1 unit + part No. 2 * 1 unit + part No. 3A* 2 unit) Please find the 1 piece of Male Bent Tubes (part No. 1), one piece of Female Bent Tubes (part No. 2) and 2 pieces of Stake Peg for front wall (part No.
  • Page 4 INSTALLATION PROCESS Connect the Arch Frame 1. Please connect the first and second group of arches by using Female Horizontal Connecting Tube (part No.6) and Bolt M8*80mm (part No.15), there are 5 pieces of female horizontal connecting tubes between them. Which make the front door group arch. (Please NOTE the direction of the bolt.
  • Page 5 INSTALLATION PROCESS Cover Installation 1. Put on the Front Door cover (part No.14) from the inside of the door frame to the outside and find the suitable holes to pass through all the tubes. Fix them using Rope inside of the door cover and tie it on the bottom of the door frame.
  • Page 6 INSTALLATION PROCESS 4. Finally adjust the frame and rope, make sure the cover is binding and smooth. Duckbill Nail Installation Insert the 12mm Steel Rod (part No.10) into one Duckbill Nail (part No.9) and use electric hammer to sink the nail into the earth deeply. Then fix it to the lower of frame tube using U bolts (part No.11).

Table of Contents