ADATIS UP Series Mounting And Installation Manual

Advertisement

Quick Links

UP-Series
Mounting and installation manual
Version
0.1
Autor
cschardt
Datum
20.12.2018
Log
V0.1
Adatis GmbH & Co.KG
page 1 of 8

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the UP Series and is the answer not in the manual?

Questions and answers

Summary of Contents for ADATIS UP Series

  • Page 1 UP-Series Mounting and installation manual Version Autor cschardt Datum 20.12.2018 V0.1 Adatis GmbH & Co.KG page 1 of 8...
  • Page 2: Table Of Contents

    Table of contents SCOPE OF DELIVERY CONNECTIONS AND INTERFACES Connections and interfaces version Ethernet Connections and interfaces version HV/PLC Connections and interfaces version NV/PLC GETTING STARTED MOUNTING Adatis GmbH & Co.KG page 2 of 8...
  • Page 3: Scope Of Delivery

    ✓ Relay ✓ ✓ ✓ Trigger input 1 ✓ ✓ ✓ Connections and Trigger input 2 ✓ ✓ ✓ Interfaces 5V output ✓ ✓ ✓ 100mA max. ✓ ✓ ✓ Wiegand Output Adatis GmbH & Co.KG page 3 of 8...
  • Page 4: Connections And Interfaces

    2.1 Connections and interfaces version Ethernet The Ethernet version of the UP series is standardly powered by PoE. For this, the supplied cable is connected to a PoE switch or a PoE injector. If only an Ethernet switch without PoE ports is available, power can alternatively be supplied via a plug-in power supply (6-56 V).
  • Page 5: Connections And Interfaces Version Hv/Plc

    2.2 Connections and interfaces version HV/PLC The HV/PLC version of the UP series is standardly powered by a 110/230V power line. The wires of the power cable are connected to the 110/230V socket of the UP unit. A connection to the network is established via the supplied powerline adapter.
  • Page 6: Connections And Interfaces Version Nv/Plc

    2.3 Connections and interfaces version NV/PLC The NV/PLC version of the UP series is standardly powered by a 48V bell wire. The wires of the 2wire line are connected to the 2wire socket of the UP unit. A connection to the network is established via the supplied converter box, which must be connected to a PoE port.
  • Page 7: Getting Started

    Getting started The terminals of the UP series are configured via the WEB interface. In order to enroll users at the terminals, they must first be created in the personnel database of the WEB interface by entering a PIN code.
  • Page 8 Corresponding holes are provided in the printed circuit board for this purpose. Finally, the glass frame is reattached to the module. step 4 step 2 step 3 step 1 Schritt 1 Schritt 2 Schritt 3 Schritt 4 Adatis GmbH & Co.KG page 8 of 8...

Table of Contents