- READ THIS FIRST - WINCH INSTALLATION The L-16 lift and winch assembly are packaged separately. The lift is shipped with the steel cable installed. Take care when removing the winch from the carton as the lift leveling feet and other small parts are packaged with the winch.
APPLIED ELECTRONICS L-16 CRANK-UP LIFT OPERATION Remove locking pin holding each leg in the folded position. Fold the legs down and re-insert locking pins through the leg braces. The central mast is the main load supporting element. Adjust the leveling pads at the end of each leg so that the lift is vertically straight and level.
Always replace any bent or broken parts immediately. These are available and should be purchased through the Applied Electronics dealer network. Individually push the 2” and the 3” tubes to one side in both directions and check the gap between the tube and the bushing material that surrounds the tube at the top of each larger tube.
Need help?
Do you have a question about the L-16 and is the answer not in the manual?
Questions and answers