Do you have a question about the SUPER SHOT 60 and is the answer not in the manual?
Questions and answers
George scutt
March 14, 2025
Hi crafco ss60 light on panel is Lit for the hose to heat but temperature not going up?
1 comments:
Mr. Anderson
March 14, 2025
The temperature on the Crafco Super Shot 60 may not be increasing despite the hose heating light being on due to heating wires electrically shorting to the metal braid in the hose. This causes the hose to stop heating. Additionally, improper settings or failure to allow sufficient heating time (minimum 30 minutes) could also be a factor. Ensure the hose temperature is set to 380°F or the manufacturer-recommended operating temperature.
This answer is automatically generated
Subscribe to Our Youtube Channel
Summary of Contents for Crafco SUPER SHOT 60
Page 1
SUPER SHOT 60 PROPANE MELTER Parts Manual - 26616 Revision C...
Page 2
Fill in appropriate fields that apply to this machine Machine S/N: _ _______________________________ Hose S/N: _______________________________ Hose S/N: _______________________________ Pump S/N: _______________________________ Pump S/N: ______________________________ Engine S/N: ________________________________ Compressor S/N: _____________________________ Gear Box S/N (Patcher): ______________________ Blower S/N (Magnum): ________________________...
Page 3
Super Shot 60 Propane Melter Part Manual Revisions Revision Description Date New Format; updated warranty, added EAC and CE logo, 9/18/18 Copyright date; 2 year warranty, wand handle P/Ns...
Page 4
Super Shot 60 Propane Trailer Melter PN 43300 Super Shot 60 Propane Skid Melter PN 50750...
Super Shot 60 Propane Melter Part Manual Table of Contents 1.0 About This Manual ........................1-1 1.1 How to use this manual: ...................... 1-1 2.0 Safety Precautions ........................2-1 2.1 General Safety........................2-1 2.2 Personal Safety ........................2-1 2.3 Equipment or Operational Safety ..................2-2 2.4 Safety Symbols and Notices ....................
Page 6
Super Shot 60 Propane Melter Part Manual Table of Contents 6.8 Brakes ..........................6-2 6.9 Tongue Jack ........................6-2 6.10 Temperature control Calibration ..................6-3 6.11 Cleaning the Melter ......................6-3 6.12 Maintenance Chart ......................6-4 6.13 Service Instructions ......................6-5 6.14 General Maintenance Parts ....................
Page 7
9.0 About the Illustrated Parts List....................9-1 9.1 Ordering Crafco Parts ......................9-1 9.2 Super Shot 60 Propane Trailer Melter Assembly 43300 ............9-2 9.3 Super Shot 60 Propane Skid Melter Assembly 50750............9-6 9.4 Tank Assembly, SS60 Propane ..................9-10 9.5 Control Box Assembly: PN 44075 ..................
Page 8
Super Shot 60 Propane Melter Part Manual List of Figures Fig. 5-1 Hydraulic Fluid Level and Temp. Gauge ................5-2 Fig. 5-2 Heat Transfer Oil Dip Stick....................5-2 Fig. 6-1 Lug bolt Tightening Sequence ..................6-2 Fig. 6-2 Temperature Control Calibration ..................6-3 Fig.
Page 9
List of Figures Fig. 8-9 Pump Circuit Schematic ....................8-35 Fig. 9-1 Super Shot 60 Propane Trailer Melter: PN 43300 ............9-2 Fig. 9-2 Super Shot 60 Propane Skid Melter: PN 50750 ............... 9-6 Fig. 9-3 Tank Assembly: SS60 Propane..................9-10 Fig.
Page 10
Super Shot 60 Propane Melter Part Manual List of Tables Table 2-1 Safety Symbols and Notices ..................2-3 Table 2-2 Safety Symbols and Notices (continued) ............... 2-4 Table 4-1 Machine Specifications ....................4-1 Table 5-1 Preparing the Machine for Start Up ................5-1 Table 5-2 Starting the Burner ......................
Page 11
Super Shot 60 Propane Melter Part Manual List of Tables Table 6-16 Material Pump Replacement (continued) ..............6-17 Table 6-17 Material Pump Replacement (continued) ..............6-18 Table 6-18 Material Pump Replacement (continued) ..............6-19 Table 8-1 Basic Visual Troubleshooting ..................8-1 Table 8-2 Basic Visual Troubleshooting (continued) ..............
Chapter 1 Introduction 1.0 About This Manual This manual is supplied with each new Crafco Super Shot 60 Propane Melter. The manual assists your machine operators in the proper use of the melter applicator and provides information about the machine’s mechanical functions Your Crafco Super Shot 60 Propane Melter is specially made to give excellent service and save maintenance expense.
Or contact your nearest authorized Crafco Distributor at crafco.com/Distributors. 2.1 General Safety Crafco, Inc. assumes no liability for an accident or injury incurred through improper use of the machine. Read this manual thoroughly before operating the machine.
Super Shot 60 Propane Melter Part Manual Chapter 2 Safety 2.3 Equipment or Operational Safety Do not operate the machine in buildings or work areas that do not have sufficient airflow. Shut-down the burner and the engine before refilling the fuel tank.
Super Shot 60 Propane Melter Part Manual Chapter 2 Safety 2.4 Safety Symbols and Notices Important safety symbols and notices are marked on the machine and in this manual. Failure to comply could result in equipment damage, operational malfunction, serious injury, or death. Please read and comply with all symbols and notices.
RA number. The customer will be emailed or faxed an RA form with all instructions to return the item to Crafco, Inc. See example. If the part is found to be within the two year warranty period and has not been abused or modified, a credit will be issued to the customer’s account or credit card.
Super Shot 60 Propane Melter Part Manual Chapter 5 Operating Instructions 5.0 Operating Instructions The Crafco Super Shot 60 Propane Melter was developed to melt Crafco sealants. However, it works well with most road asphalt and federal specification crack or joint sealants. Note: DO NOT attempt to operate the machine without using these and all other instructions.
Do not twist or bend hose over sharp edges such as the edge of the frame or tank. Crafco, Inc. recommends you do not work directly under the boom; this may cause damage to the hose. Follow all machine instructions in this manual.
Action CAUTION When shutting down the machine for the day, Crafco recommends leaving the melter about half full with material. This will give a fairly rapid heat up rate in the morning, but allows enough material to start dispensing right away when the material becomes molten.
Action Inside this shot timer box is a knob that controls how long the pump stays running each time you pull the trigger (1/4 to 5 seconds). Crafco recommends setting the dial between ¼ and ½ for the shot size.
Refer to the material manufacturer’s instructions for recommendations. Note: Follow the recommended maintenance per Table 6-1 Maintenance Chart For service, find a list of authorized Distributors and service centers at Crafco.com/Distributors. 6.14 General Maintenance Parts Table 6-3 General Maintenance Parts Quantity Description Part No.
Shell Turbo T 68 (Group II) CAUTION The heat transfer oil in this machine is a grade that has been tested and recommended by Crafco, Inc. Using a grade of oil not specifically recommended by Crafco, Inc., is cause for warranties to be voided.
Table 6-14 Material Pump Replacement (continued) Step Action Crafco, Inc. recommends that you use a new screen assembly to insure the agitator and paddles have good threads to secure with, along with new hardware. (See Fig. 6-10 Agitator Shaft and Paddles...
500 hours, or one year, you need to change your oil. Many of Crafco, Inc. service centers can perform these service steps for you if you cannot. Call your local service center to find out if they can.
Next turn “OFF” the Isuzu engine, remove the cap, pressure gauge and reattach the hose. Is the hydraulic flow correct from the Yes, call Crafco, Inc. and speak to a service hydraulic pump? technician. You should have been able to (Refer to Fig.
9.1 Ordering Crafco Parts Crafco distributors and Crafco Pavement Preservation Supply Centers are strategically located throughout the United States. Parts can be ordered from your local Crafco distributor or directly from Crafco, Inc. if a distributor is not available in your area.
Super Shot 60 Propane Melter Part Manual Chapter 9 Illustrated Parts List Table 9-5 Super Shot 60 Propane Skid Melter: PN 50750 (continued) FIG. ITEM PART NO. DESCRIPTION QTY. Fig. 9-2 39608 LID SWITCH 43374 DIP STICK, HEAT TRANSFER OIL...
Need help?
Do you have a question about the SUPER SHOT 60 and is the answer not in the manual?
Questions and answers
Hi crafco ss60 light on panel is Lit for the hose to heat but temperature not going up?
The temperature on the Crafco Super Shot 60 may not be increasing despite the hose heating light being on due to heating wires electrically shorting to the metal braid in the hose. This causes the hose to stop heating. Additionally, improper settings or failure to allow sufficient heating time (minimum 30 minutes) could also be a factor. Ensure the hose temperature is set to 380°F or the manufacturer-recommended operating temperature.
This answer is automatically generated