Download Print this page

Adjustables E-95MR Operation Manual

Hand control

Advertisement

Quick Links

OPERATION GUIDE
99300791-c EDR10782 11/06
www.adjustablesbyleggett.com

Advertisement

loading
Need help?

Need help?

Do you have a question about the E-95MR and is the answer not in the manual?

Questions and answers

Bill
July 19, 2025

How do we order a replacement remote control

Summary of Contents for Adjustables E-95MR

  • Page 1 OPERATION GUIDE 99300791-c EDR10782 11/06 www.adjustablesbyleggett.com...
  • Page 3: Table Of Contents

    E-95MR Function ....................4 J Box Programming Procedure ................5 Power Down Box Operation ................5 E-95MR Programming (1 hand control - 1 bed) ..........6 E-95MR Programming (2 hand controls - 1 bed)..........7 E-95MR Programming (1 hand control - 2 beds) ..........8 E-95MR Programming (2 hand controls - 2 beds) ..........
  • Page 4: E-95Mr Function

    E-95MR FUNCTION IMPORTANT INFORMATION READ ADVISORY INFORMATION IN THE OWNERS MANUAL CAREFULLY BEFORE USING THIS PRODUCT. THE POTENTIAL FOR ELECTRICAL SHOCK EXISTS IF ELECTRICAL COMPONENTS ARE NOT INSTALLED OR OPERATED PROPERLY. FLAT BUTTON TRANSMISSION INDICATOR LIGHT Press to return bed to the level Verifies a button is being pressed position.
  • Page 5: J Box Programming Procedure

    J BOX PROGRAMMING PROCEDURE J BOX PROGRAMMING For adjustable beds equipped with “J box” only—no power down box. When programming the hand control, At any point where “press the learn unplug the adjustable bed electrical button” is designated, disconnecting and power cord.
  • Page 6: E-95Mr Programming 1 Hand Control - 1 Bed

    E-95MR PROGRAMMING 1 hand control - 1 bed The two step procedure below is required to program 1 hand control to operate 1 bed. Before beginning, make certain the bed is plugged into a working grounded electrical outlet. If programming fails, initiate the programming procedure a second time.
  • Page 7: E-95Mr Programming 2 Hand Controls - 1 Bed

    E-95MR PROGRAMMING 2 hand controls - 1 bed The three step procedure below is required to program 2 hand controls to operate 1 bed. Before beginning, make certain the bed is plugged into a working grounded electrical outlet. If programming fails, initiate the programming procedure a second time.
  • Page 8: E-95Mr Programming 1 Hand Control - 2 Beds

    E-95MR PROGRAMMING 1 hand control - 2 beds The three step procedure below is required to program 1 hand control to operate 2 beds. Before beginning, make certain the beds are plugged into a working grounded electrical outlet. If programming fails, initiate the programming procedure a second time.
  • Page 9: E-95Mr Programming 2 Hand Controls - 2 Beds

    E-95MR PROGRAMMING 2 hand controls - 2 beds The six step procedure below is required to program 2 hand controls to operate 2 beds. Before beginning, make certain the beds are plugged into a working grounded electrical outlet. If programming fails, initiate the programming procedure a second time.
  • Page 10: E-95Mr Reprogramming Separating 2 Beds

    E-95MR REPROGRAMMING separating 2 beds The six step procedure below is required to separate 2 hand controls from operating 2 beds. One hand control per bed operation will result. Before beginning, make certain the beds are plugged into a working grounded electrical outlet. If programming fails, initiate the programming procedure a second time.
  • Page 12 For customer care online, email: accustomerservice@leggett.com www.adjustablesbyleggett.com...