Ensure provided information is accurate. Issues resulting from inaccurate information are the installer’s responsibility. • Confirm with the module manufacturer that Ground Mount is compatible with the selected module. • Validate foundation parameters prior to installation, as a local geotechnical report may be required to assess ground conditions.
CHECKLIST PRE-INSTALLATION PRIMARY COMPONENTS Verify module compatibility with Ground Mount. 204 & 60 in-lbs Purchase 2” or 3” schedule 40 steel pipe (ASTM A53 Grade B) for structure. Verify that needed components have been obtained. Contact your local distributor for any additional parts.
WEEB Clips. If using Under Clamps or Wire Clips, refer to Page Grounding Mid Clamps should not be used with Ground Mount. C. END CLAMPS Torque to Place last module in position on the rails, a minimum of 84 in-lbs 1.5”...