Advertisement

Chemical feeder
CL-01A
User Quick Guide

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CL-01A and is the answer not in the manual?

Questions and answers

Summary of Contents for emaux CL-01A

  • Page 1 Chemical feeder CL-01A User Quick Guide...
  • Page 2 Let us invite you to learn more about our entire range of products. If you click on the Emaux logo below, a URL link will take you to our website. We hope you like it! Go to Index...
  • Page 3 Index Security warnings Facility scheme Installation guide Operating instructions Maintenance Go to Introduction...
  • Page 4: Security Warnings

    1. Security warnings Before installing this product, read and follow the following notes and instructions: • All the installation, operation and maintenance procedures must be done by a qualified professional, or by a person who has been properly instructed. • Always use chlorine, bromine or oxygen tablets and do not mix chemicals.
  • Page 5: Facility Scheme

    2. Facility scheme 1. Pump 5.Chemical feeder 2. Filter 6.Check valve 3. Ozone injection 7.Heat pump 4. UV system Go to Index Go to Installation guide...
  • Page 6: Installation Guide

    3. Installation guide For a correct installation, follow the recommendations listed below: • Follow the arrangement shown in 2.Facility scheme • Once you have located the dispenser, make sure that the length of the hoses allows to reach the facility pipes. •...
  • Page 7: Operating Instructions

    • The equipment should be started once the bromine level in the pool is between 1 and 3 ppm. When using Emaux UV Nanotech Ozone these levels can be reduced between 0.25 to1ppm. • To open and load the equipment, follow the instructions in section 5.Maintenance.
  • Page 8: Maintenance

    5. Maintenance Stop and opening • Let the system run for 15 min before stoping the pump and closing the valve(C). • Isolate hydraulically (water flow closed) the chemical feeder in order to release pressure and empty the system. • Unthread the air bleeder and carefully open the lid trying not to breath nor to get...
  • Page 9 Winterization • Follow the instructions as shown in the chapter stop and opening. • Empty all the chemical feeder and rinse it with fresh water afterwards. • Open the drain plug so that the whole system empties totally. • Close the drain plug and thread it again without tighting the lid completely.

Table of Contents