Download Print this page

Advertisement

Quick Links

Quick installation guide
• Installing the machine
I
• Operation
II
• Open the hood
• Oxygen mix
IV
"OC 25"
[O
= 75%]
2
[CO
= 25%]
2
adjust
• Open the weighing drawer
• Nitrogen mix
V
"C 30"
[N
= 70%]
2
[CO
= 30%]
2
adjust
Rühle GmbH, Beim Signauer Schachen 10, D-79865 Grafenhausen
Tel.: +49 7748-523-11, Fax: +49 7748-523-8511
www.original-ruehle.de
④ ⑤
⑥ ⑦
Align scale via the
bubble level
• Open the magazine
• Sealing tool
VI
Allocation via symbol
Allocation via number
1)
Hood
2)
Handle (hood)
3)
Control box
4)
Sealing film
5)
Sealing film retainer
6)
Main switch
7)
Sealing film winding unit
8)
Weighing drawer
9)
Tool magazine
10) Steering castor with brake
11) Sealing tool bell
12) Sealing tool die
13) Tub
14) Fixed castor
15) Weighing unit
16) Gas cylinder (nitrogen
mix)
17) Pressure gauge
18) Door (gas cylinder
magazine)
19) Gas cylinder (oxygen mix)
20) Deflection pulley
21) Label printer
22) Sealing tool plug
23) Type plate
• Film winding unit
III

Advertisement

loading
Need help?

Need help?

Do you have a question about the VR1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Ruhle VR1

  • Page 1 Quick installation guide • Installing the machine • Operation ① ② ③ ④ ⑤ ⑥ ⑦ Hood ⑯ Handle (hood) Control box ⑰ ⑳ Sealing film Sealing film retainer ⑱ Main switch Sealing film winding unit ⑲ Weighing drawer Tool magazine 10) Steering castor with brake 11) Sealing tool bell 12) Sealing tool die...
  • Page 2 • Recipe selection / Recipe start Tare (set scales to "0") Recipe editor (Quick help) (Weight) Recipe start Scales • Recipe editor VIII Ingredients Barcode Price/kg Price/package Group name Label Recipe name Label text Gas mix Min. shelf life Tool/tray Price/kg Vacuum Weight...