Mobile aluminium tower with climbing frames 850/1450 camlock advanced guardrail
Hide thumbs Also See for CLIMA AGR:

Advertisement

Quick Links

SAFETY FIRST
This document is to be used in conjunction with the full user guide available from
the manufacturer or to download at bossaccesstowers.com/literature.
Safe use
Please read this guide carefully. Please note that diagrams are for
illustrative purposes only.
Check that all components are onsite, undamaged and that they are functioning
correctly - (refer to Checklist and Quantity Schedules in the user guide). Damaged or
incorrect components should not be used.
Check ground on which tower is to be erected and moved is capable of supporting
the tower.
The safe working load is 275kgs (606lbs), per platform level, uniformly distributed up
to a maximum of 950kgs (2100lbs), per tower (including self- weight).
Beware of horizontal forces (e.g. power tools) which could generate instability.
Maximum horizontal force equals 30kg.
Towers must only ever be climbed from the inside and using the rungs directly below
the trapdoor.
It is recommended that towers should be tied to a solid structure when left
unattended.
Only use the adjustable legs to level the tower and not to gain extra height.
Adjustable legs should only ever be extended to minimum amount required to level
the tower.
Lifting of equipment
Tower components should be lifted using a reliable lifting material (e.g. strong rope),
employing a reliable knot (e.g. clove hitch), to ensure safe fastening and always lift
within the footprint of the tower.
Assembled mobile towers should not be lifted with a crane or other lifting device.
Ensure the safe working load of the supporting decks and the tower structure is not
exceeded.
Movement
The tower should only be moved by manual effort, and only from the base.
No person or materials should be on the tower during movement.
Caution should be exercised when wheeling a tower over rough, uneven or sloping
ground, taking care to unlock and lock castors. If stabilisers are fitted, they should
only be lifted a maximum of 25mm above the ground to clear ground obstructions.
The overall height of the tower when being moved, should not exceed 2.5 times the
minimum base dimensions, or 4 metres overall height with stabilisers fitted in the
correct position (whichever is the smallest). If stabilisers are not fitted in the standard
position, the overall height of the tower should not exceed 2m.
Before use, check the tower is still correct and complete.
After every movement of the tower use a spirit level to check that it is vertical and
level to within 10mm/m and set the adjustable legs as required.
Do not move the tower in wind speeds over 7.7 metres per second (17 mph).
Mobile access towers are not designed to be lifted or suspended.
NOTE: If the tower is moved, you MUST inspect prior to use.
Ties
For further information on tying-in a tower please contact your supplier or the
manufacturer.
Maintenance - storage - transport
All components and their parts should be regularly inspected to identify damage,
particularly to joints. Lost or broken parts should be replaced, and any tubing with
indentation greater than 5mm must not be used.
QUANTITY SCHEDULE 850 WIDTH TOWERS
BoSS Clima 850 to EN 1004: Available in 2 lengths - 1.8m and 2.5m. Internal/external use - towers under 2.5m are outside of the
scope of EN 1004
Internal or external use
Working height(m)
Component
4.2
4.7
Platform height (m)
2.2
2.7
125/150/200mm Castor
4
4
250mm Adjustable Leg
4
4
850 4 Rung Frame
2
850 6 Rung Frame
2
850 8 Rung Frame
2
2
1.8m/2.5m Trap Deck
1
2
1.8m/2.5m Horizontal Brace (Red)
2
2
2.1m/2.7m Diagonal Brace (Blue)
2
2
1.8m/2.5m Side Toe Board
2
2
0.6m End Toe Board
2
2
Toe Board Holder
4
4
1.8m/2.5m Camlock AGR
2
2
SP7 Fixed Stabiliser
4
4
SP10 Telescopic Stabiliser
SP15 Telescopic Stabiliser
Total Self-Weight of Tower (kg) - 1.8m
112
130
Total Self-Weight of Tower (kg) - 2.5m 124
147
QUANTITY SCHEDULE 1450 WIDTH TOWERS
BoSS Clima 1450 to EN 1004: Available in 2 lengths - 1.8m and 2.5m. Internal/external use - towers under 2.5m are outside of the
scope of EN 1004
Internal or external use
Component
Working height (m)
4.2
4.7
Platform height (m)
2.2
2.7
125/150/200mm Castor
4
4
250mm Adjustable Leg
4
4
1450 4 Rung Frame
2
1450 6 Rung Frame
2
1450 8 Rung Frame
2
2
1.8m/2.5m Fixed Deck
1
1
1.8m/2.5m Trap Deck
1
2
1.8m/2.5m Horizontal Brace (Red)
2
2
2.1m/2.7m Diagonal Brace (Blue)
2
2
1.8m/2.5m Side Toe Board
2
2
1.2m End Toe Board
2
2
Toe Board Holder
4
4
1.8m/2.5m Camlock AGR
2
2
SP7 Fixed Stabiliser
4
4
SP10 Telescopic Stabiliser
Total Self-Weight of Tower (kg) - 1.8m 136
155
Total Self-Weight of Tower (kg) - 2.5m 153
177
PRE-USE SAFETY CHECKLIST
Refer to this checklist before using each time.
Description
Tower structure upright and level
Castors locked and legs correctly adjusted
Horizontal and diagonal braces fitted
Stabilisers and props fitted as specified
Platforms located and wind-locks engaged
Interlock clips engaged
Toe boards located
Guardrails fitted correctly and positively locked
Tower designation information kit fitted
Ensure horizontal braces and guardrails are fitted correctly.
Always fit as shown.
Refer to this checklist before using each time.
Ensure horizontal braces and guardrails are fitted correctly.
Ensure interlock clips on frame members are in the 'locked' position.
Ensure wind-locks are engaged before moving onto the deck levels.
5.7
6.2
6.7
7.7
8.2
8.7
9.7
3.7
4.2
4.7
5.7
6.2
6.7
7.7
4
4
4
4
4
4
4
4
4
4
4
4
4
4
2
2
2
2
2
2
2
2
2
2
2
4
4
4
6
6
6
2
2
3
3
3
4
4
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
4
4
4
4
4
4
4
4
4
4
6
6
6
8
4
4
4
4
4
4
4
154
158
176
212
216
234
258
173
177
200
239
242
265
292
5.7
6.2
6.7
7.7
8.2
8.7
9.7
3.7
4.2
4.7
5.7
6.2
6.7
7.7
4
4
4
4
4
4
4
4
4
4
4
4
4
4
2
2
2
2
2
2
2
2
2
2
2
4
4
4
6
6
6
2
2
2
3
3
3
4
2
2
3
3
3
4
4
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
4
4
4
4
4
4
4
4
4
4
6
6
6
8
4
4
4
4
4
4
4
196
201
220
261
279
297
338
226
231
255
303
321
345
393
Yes
Ensure camlocks are engaged.
PN3304600
©2017 WernerCo Rev. 12/17
Internal use only
10.2
10.7
11.7
12.2
12.7
13.7
14.2
8.2
8.7
9.7
10.2
10.7
11.7
12.2
4
4
4
4
4
4
4
4
4
4
4
4
4
4
2
2
2
2
2
2
2
2
2
8
8
8
10
10
10
12
4
5
5
5
6
6
6
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
4
4
4
4
4
4
4
8
8
10
10
10
12
12
4
4
4
4
4
4
4
276
279
303
307
325
349
353
310
318
345
348
371
398
401
Internal use only
10.2
10.7
11.7
12.2
12.7
13.7
14.2
8.2
8.7
9.7
10.2
10.7
11.7
12.2
4
4
4
4
4
4
4
4
4
4
4
4
4
4
2
2
2
2
2
2
2
2
2
8
8
8
10
10
10
12
4
4
5
5
5
6
6
4
5
5
5
6
6
6
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
4
4
4
4
4
4
4
8
8
10
10
10
12
12
4
4
4
4
4
4
4
343
362
403
408
427
468
473
398
422
471
475
499
548
553
CLIMA
Mobile Aluminium Tower with
Climbing Frames 850/1450
Camlock Advanced Guardrail
COMPONENTS
BoSS Camlock Advance Guardrail
End
Toe Board
Castor
Adjustable Leg
4 Rung Frame
FITTING TOE BOARDS
Side Toe Board
End
Toe Board
Toe Board Clip
(A)
Claw
(B)
Deck
Rung
AGR

QUICK GUIDE

Side
Toe Board
Trapdoor
8 Rung
Frame
Stabiliser

Advertisement

loading
Need help?

Need help?

Do you have a question about the CLIMA AGR and is the answer not in the manual?

Questions and answers

Summary of Contents for Boss CLIMA AGR

  • Page 1: Quick Guide

    ©2017 WernerCo Rev. 12/17 QUANTITY SCHEDULE 850 WIDTH TOWERS COMPONENTS BoSS Clima 850 to EN 1004: Available in 2 lengths - 1.8m and 2.5m. Internal/external use - towers under 2.5m are outside of the scope of EN 1004 BoSS Camlock Advance Guardrail...
  • Page 2 - 25 mph) tie the tower to a rigid structure. If the wind is likely to reach gale force, (over 18 metres per second - 40 mph) the tower build BoSS Towers. Above 4m height, it is essential that at least rung frames at the base, with the 6 rung frames next and the should be dismantled.