BILL OF MATERIALS Left Leg (1x) Right Leg (1x) Bottom Cross Beam (1x) Upright Tube (2x) Weight Storage Peg (2x) Pullup Bar (1x) Other Hardware Included: M12 x 100 Bolt (16x) Hex Nut - 1” (2x) M12 Washer (32x) J Cup (2x) M12 Lock Nut (16x)
Page 3
The first step in assembling your squat rack is to attach the legs of the squat stand to the cross beam. See the image below It’s much easier to connect the uprights to the legs once they are attached to the cross beam.
Page 4
Insert the upright into its slot on the left leg and affix it with the 4 bolts as shown above. Once the upright is secure you can also attach the weight storage peg through the 1” hole directly above the leg. Use the 1” hex nut to secure it.
Page 5
The last step in assembling your squat rack is to attach the pullup bar at the top of the uprights. See the above image for attachment procedure. 2 Bolts are required for each side. Note: the height of the pullup bar is adjustable. The image above is just one possible configuration.
Need help?
Do you have a question about the XTE X2 and is the answer not in the manual?
Questions and answers