This chapter gives a brief summary of the steps required to set up and operate
the 2100 temperature controller. This should be used as a general overview and
reference and not as a substitute for the remainder of the manual. Please read
Sections4 through carefully before operating the controller.
3.1 Unpacking
Unpack the controller carefully and inspect it for any damage that may have
occurred during shipment. If there is shipping damage, notify the carrier
immediately.
An RTD (thermistor optional) control probe and a thermocouple cutout probe
should have been purchased along with the controller. Typically, the user
provides the bath or system to be controlled and the heater.
Verify that the following components are present:
•
2100 Controller
•
Control Probe
•
Power Cord
•
Two Power Cords - 1 for the Heater and 1 for the Stirrer
•
Thermocouple Connector
•
User's Guide
Chapter 3
Quick Start
3-1