Cable Wiring Procedure In Control Panel - Sharp JW-21MN User Manual

Me-net module
Table of Contents

Advertisement

7-3 Cable wiring procedure in control panel

(1) Fixing of the cable
In order not to put any force on the cable and the
JW-21MN, fasten the cable to an line nearby input of
a control panel or a "T" branch point to the JW-
21MN using saddles etc.
(2) Extra length of cable
Provide an extra length of the cable of 2 to 3 m
inside a control panel for easier processing of the
cable end and easier wiring when changing module
positions.
7
(3) Connection to the JW-21MN
The connector to the JW-21MN should be turned
right to secure locking, not merely inserted.
(4) Insulation cover
When the connector touches with a high voltage
section or external enclosures, communication
errors may occur. Make sure to install an insulation
cover.
(5) Grounding of power supply module (JW-22PU/31PU)
Make sure to use a class-3 grounding to connect the GND terminal of the power supply module.
- If the power supply module is not grounded, the JW-21MN cannot conduct with the ground after
turning "ON" the shield ground switch.
When using a JW-31PU AC power supply module
L
POWER
INPUT
100-120VAC
N
SHORT
Class-3
grounding
GND
HALT
OUTPUT
100-120VAC
(24VDC)
1A
7-2
Saddle
Communication cable
connection connector
"T" jacket
(insulation cover)
"L" jacket
(insulation cover)
Power input terminal for
85 to 132 VAC
GND (ground) terminal
Halt output terminal
Saddle
An extra length of
cable of 2 to 3 m

Advertisement

Table of Contents
loading

Table of Contents