Preparing The Mvi For Use - ION Mercury Vapour Indicator User Manual

Table of Contents

Advertisement

MVI MANUAL

Preparing the MVI for use

It is recommended that you zero your instrument in a known 'clean environment' using fresh air.
1.
Turn the instrument ON and ensure the LO BAT indication does not appear.
• If LO BAT does appear then charge the unit for 16 hours before proceeding to next step (refer to Battery
Charging Section of this manual for further information).
2.
Allow the instrument to run until you see a stable reading
• This should happen after 3 – 4 minutes when operating in the 0 – 2000 range
• Allow 10 minutes before operating in the 0 – 200 range
3.
As soon as the reading is stable you can zero the instrument
• rotate the 'zero adjust control knob' until '000' shows on the LCD screen
4.
Fit the PTFE probe and filter
If you suspect you are in an area contaminated with mercury, you MUST connect the charcoal filter to the inlet of the
MVI before adjusting the zero control knob.
Unrivalled Gas
Detection.
Page 16 of 23
Ion Science Ltd
ionscience.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mvi

Table of Contents