Please read these instructions carefully before installing or maintaining this equipment.
Good electrical practices should be followed at all times and this data should be used
as a guide only.
Issue 01
June 07
IOM – Evolution II
Issue
01
1

Advertisement

loading

Summary of Contents for Chalmit lighting EVOLUTION II

  • Page 1 IOM – Evolution II Issue INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS EVOLUTION II Important : Please read these instructions carefully before installing or maintaining this equipment. Good electrical practices should be followed at all times and this data should be used as a guide only.
  • Page 2 Introduction – Evolution II Asymmetric ATEX Floodlight The Evolution II is a development of the existing Evolution floodlight that has improved performance while retaining the best features of the Evolution. The lamp is contained in an enclosure with the cover glass permanently attached.
  • Page 3 IOM – Evolution II 1.0 Special provisions for safe use The 120V version of this product must only be mounted with the lamp horizontal or within 10 degrees of the horizontal position. Please refer to the product certificate for further information.
  • Page 4 IOM – Evolution II continuously at more than +6%/-10% of the rated supply voltage of the control gear or tapping. The user must determine the actual underlying site supply and purchase or adjust accordingly. In this case, the luminaires have multi-tapped control gear that can be set to a range of 50 and 60 Hz voltages.
  • Page 5 IOM – Evolution II Example 1: Inner ring set at '0', then by moving the outer ring, 0º, 30º, 60º angles are achieved. Example 2: Inner ring set at '5', then by moving the outer ring, 5º, 35º, 65º angles are achieved.
  • Page 6 IOM – Evolution II Inspection and Maintenance Visual inspection should be carried out at a minimum of 12 monthly intervals and more frequently if conditions are severe, refer to BS EN 60079-17. The time between lamp changes could be very infrequent and this is too long a period without inspection.
  • Page 7 IOM – Evolution II (open circuit failure). Before re-assembling, all connections should be checked and any damaged cable replaced. Fuse Ratings The fuse ratings for HID lamp circuits need to take account of three components of circuit current. Current inrush to PFC capacitors which can be up to 25 x the rated capacitor current and last 1-2...
  • Page 8 IOM – Evolution II Tables 0/1/2 Table 0 Maximum Ambient and Temperature Ratings Refer to Section: 1.0 Lamp Wattage Tamb ºC T Class Dust Rating Cable Rating Cable Rise ºC ºC T/HAL (E40) 500W T/HAL (R7s) 500W SON/T SON/T SON/T...
  • Page 9 Chalmit Lighting reserve the right to amend characteristics of our products, and all data is for guidance only. Certificate No. FM 26005 Chalmit Lighting is a leading supplier of Hazardous Area and Marine Lighting products. IOMEVOII Issue 01 June 07...