POLYMER PUMP WELL
Tested to comply with AS/NZS 1546.1 (2008)
Assembly and Installation Instructions
for on-site domestic waste-water treatment and disposal systems
PARTS SUPPLIED WITH EACH POLYMER PUMP WELL:
1:
1 x moulded Plastic Pump Well Assembly
2:
1 x moulded Plastic Access Cover
3:
6 x Stainless Steel Screws
4:
2 x standard elastomeric rubber rings for 100mm uPVC SWV pipe
PARTS SUPPLIED WITH EACH RISER KIT:
5:
1 x 600mm x 630mm dia Ribstruct
6:
6 x Stainless Steel Screws
7:
1 x Black Butyl Joint Tape (97681)
(Complete single pump and duty/standby pumpwell kits are available on request)
* Check with your local authority before selecting any part of a Waste-water disposal system.*
Refer Notes on back page.
The Polymer Pump Well should be located in areas not exposed to any vehicle or regular pedestrian
traffic. It should be installed in an area set aside for garden use, and finally covered with bark or garden
mulch after installation is complete. Where the Pump Well is in a high water table area extra anchorage
may be required. See "ANCHORAGE".
Date
: 21/09/2016
Australian
Standard
AS/NZS1546.1
Lic 1950
Septic Tanks
1000 L
82202C
1 of 5
Released/Product Information/Pumpwell
(Poly) V1.0

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 82202C and is the answer not in the manual?

Questions and answers

Summary of Contents for Everhard Industries 82202C

  • Page 1 AS/NZS1546.1 Lic 1950 Septic Tanks POLYMER PUMP WELL 1000 L 82202C Tested to comply with AS/NZS 1546.1 (2008) Assembly and Installation Instructions for on-site domestic waste-water treatment and disposal systems PARTS SUPPLIED WITH EACH POLYMER PUMP WELL: 1 x moulded Plastic Pump Well Assembly...
  • Page 2 PREPARATION Ensure that –  appropriate approvals have been given by local authorities.  appropriately qualified persons, including electricians and plumbers, are employed to install and connect the pumpwell. We recommend that all holes cut in the pumpwell are made leak proof using rubber o-rings (provided), rubber seals or bulk head fittings.
  • Page 3 POSITIONING AND FITTING OUT THE PUMP WELL a) Remove the access cover and clear all cuttings from the interior of the pumpwell b) Fit vent and discharge attachments as required c) Using the lifting holes, carefully lower the pump well into the excavated hole, seating the base of the pump well into the sand bed.
  • Page 4 IMPORTANT NOTES "Pump Well" is a generic term for any vessel intended to temporarily store liquid before it is transferred by means of a pump to another location, perhaps for processing or long-term storage. The EVERHARD Polymer Pump Well has been tested and found to comply with the Australian/New Zealand standard for vessels such as Septic Tanks and Collection Wells for use in domestic, and some other, situations.
  • Page 5 HEAD OFFICE – BRISBANE EVERHARD INDUSTRIES PTY LTD A.C.N. 009 690 859 405 Newman Rd. Geebung, Brisbane, 4034 PO Box 543 Virginia BC , QLD 4014 Telephone (07) 3637 6444 Fax (07) 3265 2111 EVERHARD products are also available from most reputable building and hardware suppliers across Australia.

Table of Contents