Download Print this page

Installation Example - JACLO J-TH34 Installation Instructions Manual

Thermostatic valves,thermostatic valves with built in diverter/shut off, thermostatic valve with built in volume control, diverter valves
Hide thumbs Also See for J-TH34:

Advertisement

[STEP 1] ROUGH VALVE INSTALLATION (J-TH34/J-TH12)
1. Position valve assembly so outer edge of finished wall is between min./max. thickness marked on rough in
shield. Figure 2
2. Using appropriate fasteners, mount valve assembly to studs/blocking. Figure 1
3. Remove cartridge and check stops. Page 6
4. Connect inlet and outlet port piping.
5. See "Rough in plumbing and valve flushing". Page 9
6. Turn on water supply and flush valve with cartridge and check stops removed. Page 9
7. Turn off water supply and re-install cartridge and check stops. Page 10
8. Turn on water supply and test for leaks and all functions.
9. Continue on to Page 11 & 12
**NOTE: THIS VALVE REQUIRES AN OFF/ON OR VOLUME CONTROL VALVE (NOT INCLUDED)**

Installation Example

Figure 1
OCTOBER 3, 2017
JACLO.COM
| PG 2
TO SHOWERHEAD OR
OTHER PLUMBING
ASSEMBLY
1" THICK FINISHED
WALL OUTER EDGE
OPTIONAL VOLUME
CONTROL
SAMPLE HOLE IN WALL
4½" Ø
Max
4½" DIA. MAX
HOLE IN WALL
OPTIONAL VOLUME
CONTROL
TO TUB SPOUT ONLY
Valve Rough-in Shield
Figure 2
Valve Rough Specs
Hot
Inlet
All outlets require volume
control/diverter or plug (not supplied)
j a c l o i n d u s t r i e s | 129 Dermody Street Cranford, NJ 07016
p 908.653.4433 | 800.852.3906
Cold
Inlet
3 3/8"
5 3/4"
3 9/16"
f 908.653.1717 | 800.852.4133
A
Hot
Inle

Advertisement

loading