Contents Safety ...................4 General Information ..............5 Getting Started ................6 Operation of ES-20..............7 Specifications................9 Guarantee and service..............10 Declaration of Conformity ............11 ES-20 Version 2.02 - July 2013 Operating instructions Page 3...
Do not plug the unit into an ungrounded the power socket, and do not use an ungrounded extension lead. If liquid penetrates into the unit, disconnect it from the electric circuit and have it checked by a repair and maintenance technician. Version 2.02 - July 2013 ES-20 Page 4 Operating instructions...
Page 5
Do not place a load exceeding the maximum load value mentioned in the specifications section of these operating instructions. BIOLOGICAL SAFETY It is the user's responsibility to carry out appropriate decontamination if hazardous material is spilt on or penetrates into the equipment. ES-20 Version 2.02 - July 2013 Page 5 Operating instructions...
The unit is equipped with the direct-drive system ensuring most reliable stable long-time operation (up to 30 24 hour cycles). The ES-20 is easy to operate. The two-line LCD display shows both set and actual values for temperature, time and speed.
Page 7
The unit is applicable in all the areas of clinical, biotechnology and microbiology laboratory research. ES-20 Version 2.02 - July 2013 Page 7 Operating instructions...
• Shaker-Incubator ES-20 ..................1 piece • Power cord......................1 piece • Control cable.......................1 piece • Spare fuse ......................1 piece • Operating Instructions; Declaration of Conformity..........1 copy • ES-20 Shaker-Incubator Assembling Instruction ...........1 copy Optional accessories: PUP-12 platform u ..................on request ·...
Page 9
Set up: Assemble the unit using the enclosed ES-20 Orbital Incubator Shaker Assembling Instruction as a guide; Note! ES-20 Orbital Incubator Shaker Assembling Instruction can be found on our web page, please visit the link http://distributor.grant.co.uk/ media/19989/assembling%20ES-20_en6_19102012.pdf. Place the unit on a horizontal even working surface;...
Page 10
4. Operation of ES-20 PROCEEDING PARAMETERS SET PARAMETERS Shaker Set p. +37.0 00:25 STOP +37.0 Actual p. Time Temp. Run/Stop Time (hr : min) Temp. °C Timer Fig.2 Control panel 4.1. Connect the unit to a grounded power socket. Set the Power switch to position I (ON).
Page 11
4.12. After finishing the operation set the power switch, located on the rear panel of the unit, in position O (Off) and disconnect the external power supply with from electric circuit. ES-20 Version 2.02 - July 2013 Page 11 Operating instructions...
Platform with spring holders for up to 88 tubes up to 30 mm diameter P16-88 (e. g. 10 ml, 15 ml, 50 ml tubes) Working dim. 275x205x75 mm Grant is committed to a continuous programme of improvement, specifications may be changed without notice. Version 2.02 - July 2013 ES-20 Page 12 Operating instructions...
Ethyl alcohol Pure Full reaction. Do not use! H O 6% No reaction. Standard ethanol (75%) or other cleaning agents are recommended for cleaning and disinfection of the stainless steel surfaces. ES-20 Version 2.02 - July 2013 Page 13 Operating instructions...
Page 14
If routine tests are to be made, we recommend a test of the integrity of the protective earth conductor and an insulation test at 500 Vdc. Routine flash tests are not recommended for any electrical equipment, because repeated high voltage tests degrade insulation materials. Version 2.02 - July 2013 ES-20 Page 14 Operating instructions...
Page 15
ES-20 Version 2.02 - July 2013 Page 15 Operating instructions...
Need help?
Do you have a question about the ES-20 and is the answer not in the manual?
Questions and answers