Page 2
EUROGROWER PARTS BOX 1: BOX 2: EUROGOWER PARTS: BOX 1: BOX 2: (not included with module) 1) Bato Buckets (8) 16) CocoTek Fine Coir Bricks (4) 2) Drain Elbows (8) 17) Clay Pebbles (50lbs) 3) Panda 40 Gallon Reservior (1)
Page 3
ASSEMBLY STEP 1 Place the Panda Reservoir on a level surface where it will be used. Coat the inside of the Reservoir grommet with a thin coating of silicon grease (optional) and insert Drain Valve into grommet using a twisting motion. STEP 2 Attach the Drain Rail Clips by inserting them into the holes on the Reservoir Lid.
Page 4
ASSEMBLY STEP 5 Place Filter onto Mag Drive #2 Pump and attach Pump Line. STEP 6 Place Mag Drive #2 Pump into the Panda Reservoir through the Reservoir Access Hole and feed Pump Line and Power Cord through small hole located next to the Reservoir Access Hole.
Page 5
ASSEMBLY STEP 10 Make sure that Drip Lines reach into the Bato Buckets and attach them to the Drip Stakes. The Drip Lines fit best into second smallest opening of the Drip Stakes. STEP 11 Rinse Clay Pebbles thoroughly with plain water and fill each Bato Bucket up to the Drain Fittings.
Page 6
Abundant light, proper temperature and adequate ventilation are crucial for fast growth, healthy plants and higher yields. Place the EuroGrower in a warm, well-lit, well-ventilated location, such as an outdoor garden, sunlit window, patio or greenhouse. Keep your EuroGrower away from areas...
PREPARATION FOR REPLANTING After harvesting and before replanting your EuroGrower, dismantle the system and clean all parts with hot water. Rinse the Clay Pebbles in very hot water and soak overnight.
Need help?
Do you have a question about the EuroGrower and is the answer not in the manual?
Questions and answers