Page 4
Acclimate Your GeoWood Flooring for 24 hrs Make sure the sub oor is at, level, clean and free of For GeoWood ooring, lay boxes at on the oor and only debris. New concrete must be cured for at least 60 days.
Page 5
• Room temperature and relative humidity must be consistent with year-round living conditions for at least 5 days prior to installation. • Due to the nature of Cali Bamboo GeoWood, typical acclimation is for 24 hours. Flooring does not need to be taken out of the boxes, just opened at the ends.
Page 6
• The subfloor must be dry • The subfloor must be structurally sound Even though Cali Bamboo GeoWood Plank Flooring is water resistant it is NOT considered a moisture barrier. Hence, we always require the use of a moisture barrier (like 6mil plastic) on concrete.
Page 7
• Floor should be installed from several cartons at the same time to ensure good color, shade and appearance. Expansion gaps: Even though Cali Bamboo GeoWood Planks will have very minimal expansion and contraction it is still required to leave 3/8” expansion space around the perimeter as well as all fixed objects (tile, fireplace, cabinets).
Page 8
• Area rugs are also recommended in front of kitchen sinks and in high traffic areas. • Although the Cali GeoWood Flooring is water resistant, it is still a best practice to avoid excessive moisture on the floor. Therefore, we recommend soaking up spills immediately using a dry towel or dry mop.
Need help?
Do you have a question about the Geowood and is the answer not in the manual?
Questions and answers