KUDOS 1400 Installation Instructions Manual

Walk-in enclosure

Advertisement

Quick Links

'1400' & '1700' KUDOS WALK-IN ENCLOSURE
Please read these instructions throughout before installing as incorrect fitting will invalidate the guarantee
These installation instructions must be used in conjunction with the QUARTZ Installation Guide
For information on the Walk-In Enclosure/Shower Tray
Kudos Shower Products 01539 564040
IMPORTANT
Check that you have the correct packs and shower tray to
suit your installation
Check appearance of shower enclosure and tray. Any
defects must be reported to Kudos Shower Products
before assembly/installation. Claims for imperfections will
only be accepted prior to installation.
Ensure shower tray is installed level in all directions.
Prior to installation, any gap or crevice between tray and
walls must be filled with silicone sealant flush with the top
of the tray.
Waterproof walls (using tiles/shower panels etc.), before
installing the shower enclosure.
Care should be taken when drilling into walls to avoid
hidden pipes and electrical cables.
The blended water to the handset can be supplied from
above or below the enclosure:
OVERHEAD WATER SUPPLY:
Maximum ceiling height allowable (from top of tray) =
2830mm (100mm tray), 2835mm (55mm tray)
NB- Please ensure that the ceiling entry point for this
supply is clear of any structural framework.
UNDER-TRAY WATER SUPPLY:
Overall height of enclosure (including shower tray) =
2076mm (100mm tray), 2036mm (55mm tray)
We recommend that you fit lagging to the 2m flexible
hose if it is being installed into a situation where the
ambient temperature may drop below 5c.

PACK CONTENTS

Please ensure that you have all the necessary components
before starting your installation.
PACK A (1400 tray)
PACK P (1700 tray)
INSTALLATION INSTRUCTIONS
Incorporating
AQUALISA QUARTZ SHOWER SYSTEM
Got a query? Then please contact the relevant number:
PACK B (1400 tray)
PACK R (1700 tray)
For information on the Quartz Shower System
Aqualisa Products Limited 01959 560010

CLEANING

Use only warm soapy water and damp cloth/sponge on a
regular basis. Do not use abrasive scouring powders,
chemicals or aerosol products - these may result in damage
to the surfaces.

KEY STAGES TO INSTALLATION

1st
Choose your Quartz Processor site and install.
2nd
Run data cable to recommended position for shower
control.
3rd
Connect 2 metre flexible hose to Quartz Processor.
NB- This connection must be carried out at this stage if
it is not possible to make the connection after the
shower tray has been installed, i.e, when installing the
tray directly onto a solid floor.
4th
Install shower tray.
5th
6th
Install shower enclosure.
7th
Connect to flexible hose and fit Water Delivery Column.
CLEANING
For frame work and fixings use only warm soapy water and damp
cloth/sponge on a regular basis. Do not use abrasive scouring powders,
chemicals or aerosol products - these may result in damage to the surfaces.
See instruction below for glass cleaning advice.
LIFE SHIELD
Your Kudos product is treated with Life Shield on the inside and
outside surface. Though this helps prevent the build up of lime-
scale and soap deposits, the glass still needs regular
maintenance. We recommend the use of a detergent and aroma
free glass cleaner (A 50/50 mix of vinegar and water works well)
Strong detergents and abrasives can damage the coating.
After showering use a squeegee to remove droplets of water from
the glass.
THESE INSTRUCTIONS ARE TO BE LEFT WITH THE CONSUMER
PACK C
(1400 & 1700 tray)
RECESS COMPONENT KIT
PACK D
(1400 & 1700 tray)
CORNER COMPONENT KIT

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 1400 and is the answer not in the manual?

Questions and answers

Summary of Contents for KUDOS 1400

  • Page 1 NB- Please ensure that the ceiling entry point for this LIFE SHIELD supply is clear of any structural framework. Your Kudos product is treated with Life Shield on the inside and outside surface. Though this helps prevent the build up of lime- UNDER-TRAY WATER SUPPLY:...
  • Page 2 Note: all dimensions are from base of tray to centre of holes (unless stated otherwise) Recommended position Recommended position Kudos Concept tray height = 100mm for data cable outlet for data cable outlet Kudos Concept2 tray height = 55mm Outlet hole for...
  • Page 3 To overcome the width of the integral upstand of the shower tray, either method can be used IMPORTANT: IF THE DIMENSIONS SHOWN ARE EXCEEDED THEN THE GLASS PANEL(s) WILL NOT FIT MUST NOT EXCEED 14mm MUST NOT EXCEED 14mm 675mm (1400 tray) 860mm (1700 tray) Right-hand Access METHOD ‘B’...
  • Page 4 NB- side panel installation does not require a holes. compensator channel, the main channel is fixed directly to the wall. 44mm (100 high tray) (1400 tray) CUSHION 48mm (55 high tray) SEAL TO (1700 tray) 48mm OUTSIDE...
  • Page 5 FIX RAIL WALL BRACKET FIT TOP RAIL Re-position wall bracket to wall and mark through Fit finial top assembly through hole at top edge of fixing hole. glass panel using 4mm Allen key supplied, ensuring Drill (8mm), plug and fix using No.12’s x 30mm long screws are to inside of enclosure.
  • Page 6 FIT WATER DELIVERY COLUMN Ensure all component parts are fitted to the relevant tubes before securing to curved glass panel. UNDER-TRAY OVERHEAD WATER SUPPLY WATER SUPPLY UNDER-TRAY WATER SUPPLY Fit plug connector to TOP of Water Outlet Body, ensuring the rubber washer is fitted. Feed flexible hose through 945mm long bottom tube and connect to BOTTOM of Water Outlet Body, ensuring rubber washer is fitted.

This manual is also suitable for:

1700

Table of Contents