Terminator DE-B Beacon LED End of Circuit Light Kit INSTALLATION PROCEDURES...
Page 2
• Component approvals and performance ratings are based on Banding (fi ts 10" pipe and below) the use of Thermon specifi ed parts only. User supplied power LED Light Module connection fi ttings must be listed or certifi ed for intended use.
Page 3
Terminator DE-B Beacon 300mm (12") 50mm (2") Max. Weep Hole Min. Connection 300mm (12") Locate bus connection (HPT and FP only) and Slide expediter toward pipe and route cable Insert cable into expediter. If mounted on bottom cable as shown. Cut end of cable at angle to aid of pipe, punch out weep hole.
Page 4
To remove cap, lift latch mechanism, as shown clockwise and tighten cap securely. Make sure and unscrew cap. De-energize all power sources latch mechanism is in the locked position. before opening enclosure. THERMON . . . The Heat Tracing Specialists ® • • 100 Thermon Dr.