GE Energy THQLLX8DR Installation Instructions

8 circuits generator interlock kit

Advertisement

Quick Links

GE Energy
General
To comply with the National Electrical Code and
Underwriters Laboratories, the Generator Interlock kit
must be installed in accordance with the information
contained in this instruction manual and by a qualified
electrical contractor and/or licensed electrician.
Introduction
This bulletin provides instructions for installing the
interlock and circuit breaker retainer on the 400A rated
Model 1 GE Meter Socket Load Centers: TSDR840UFCU.
Installation
Step 1: Install the Retainer
1.
Uninstall the dead front, and retain the mounting
screws.
2.
Install the 2-pole back-fed main breaker in the
position shown in Figure 1.
3.
Install the conductors into the 2-pole back-fed main
breaker. Check breaker for wire range and tightening
torque information.
4.
Loosen the copper strap mounting screw.
5.
Install the retainer and secure using the nuts provided
in the kit (see Figure 1). Tighten to 35 lbs-in (4 N-m).
Mounting
Mounting
Nuts
Nuts
Back-fed
Back-fed
Main Breaker
Main Breaker
2-Pole
2-Pole
Main Breaker
Main Breaker
Figure 1: Main Breaker Retainer
8 Circuits Generator Interlock Kit: THQLLX8DR
WARNING: Hazard of electrical shock or burn
Turn off power supplying this equipment before working inside
Branch
Branch
Breaker
Breaker
Interior
Interior
Retainer
Retainer
DEH 41153 Generator Interlock Kit Installation Instructions R03
Step 2: Drill the Mounting Holes on Dead front
A drilling template is provided to ensure proper alignment
of the interlock
1.
Locate dead front removed earlier in Step 1.
2.
Insert the folds of the template in the knockout of 4-
pole main breaker and slide towards the branch
breaker knockouts until it ceases to slide further (see
Figure 2).
3.
Drill the pilot holes through the two identified holes in
the template using a 3/32" (0.093") drill bit.
4.
Remove the drill template and re-drill the two pilot
holes with ¼" (0.250") drill bit.
5.
Remove any burrs resulting from drilling the holes.
Holes
Holes
Template
Template
Figure 2: Mounting Hole Template
Step 3: Mounting the Interlock
1.
Place the interlock on the front side of the dead front,
over the mounting holes drilled in Step 2.
2.
Mount the interlock using the screws, washers, lock
washers and nuts provided in the kit (see Figure 3).
Tighten to 45 lbs-in (5 N-m).
3.
Make sure both the 2-pole main and the 2-pole back-
fed main breakers are in the OFF position before
installing the dead front.
Dead
Dead
front
front
Folds
Folds
1

Advertisement

loading

Summary of Contents for GE Energy THQLLX8DR

  • Page 1 DEH 41153 Generator Interlock Kit Installation Instructions R03 GE Energy 8 Circuits Generator Interlock Kit: THQLLX8DR WARNING: Hazard of electrical shock or burn Turn off power supplying this equipment before working inside General Step 2: Drill the Mounting Holes on Dead front...
  • Page 2 Should further information be desired or should particular problems arise that are not covered sufficiently for the purchaser’s purposes, the matter should be referred to the GE Company. GE Energy General Electric Company 41 Woodford Ave., Plainville, CT 06062...