Model Number: EnverBridge
This manual is an integral part of the unit. Please read the instruction
Zhejiang Envertech Corporation Ltd.
manual carefully before installation, operation or maintenance. Keep
Tel:+86 579 8926 6326
this instruction manual for future reference. This document is not to
Email:info@envertec.com
be reproduced in any manner, nor are the contents to be disclosed
Add:24th Floor, Jintong Mansion,
to anyone, without the express authorization of Envertech.
Center of Headquarters, Yongkang City,
Zhejiang Province, China

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the EnverBridge and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Envertech EnverBridge

  • Page 1 This document is not to Email:info@envertec.com be reproduced in any manner, nor are the contents to be disclosed Add:24th Floor, Jintong Mansion, to anyone, without the express authorization of Envertech. Center of Headquarters, Yongkang City, Zhejiang Province, China...
  • Page 2: Table Of Contents

    Function of LCD.................. LCD 1602 interface................6.2.1 Start-up interface................12-13 Monitoring interface................Making-up network construction status..........14-15 Fault display..................Application..................Disconnecting a EnverBridge from the system......Monitoring and Troubleshooting and Maintenance...... Safety checks..................16-17 Maintain periodically................Internet WEB..................18-19 Contact....................
  • Page 3: Read This First

    PV market. Envertech’s new product “EnverBridge” acts as the power interface (PI) to the utility grid. It is an information gateway for the Envertech Microinverter. The data of real-time performance information of energy harvest for all Envertech micro-inverter systems can be collected by EnverBridge, and be transmitted 2.2 Other Symbols...
  • Page 4: Technical Competence

    To ensure your personal safety and the proper use of EnverBridge, please carefully read this manual and which is clearly marked by appropriate warning signs before installation.
  • Page 5: Packing And Feature

    • WARNINGS - The output connection with AC grid shall be protected by a max. 20A circuit breaker. • The EnverBridge shall be connected with the Envertech EVT248 or EVT500 inverter as a system. It cannot operate as a stand-alone unit or in case of AC grid disruption...
  • Page 6: Main Functions

    3.3 Main functions Use the Power Line Carrier Communication (PLCC) technology within Photovoltaic power plant By PLCC technology, EnverBridge collects generation data from the PV power plant, and transmits to the EnverPortal database by its built in EnverBridge. 3.4 Technical Parameters...
  • Page 7: Operating Static

    Installation diagram The detailed working mode descriptions are as below: Start up Start up mode is for a newly installed EnverBridge. This startup mode must base on the proper AC, micro-inverter, Ethernet cables connecting. Active When the EnverBridge is in normal operation process, this insures that the power available from micro-inverter array is exported to the utility grid.
  • Page 8: Grid Disconnect

    To ensure the safe operation of the devices, they may be installed and commissioned only The purpose of the manual for LCD of EnverBridge is to help users to know the function by qualified personnel in full compliance with the warnings referred to in this manual.
  • Page 9: Monitoring Interface

    EnverBridge and MI starts. On the first line of the LCD 1602 screen “MI connecting” indicates the connection to MI has started and “x MI connected” on the second line shows how many MI units have been connected with x indicating the numbers of MI units connected.
  • Page 10: Fault Display

    2.If it shows on LCD screen for a long time that the the number of MI units is less than What shows on the second line of LCD interface is the same as the monitoring that of MI units connected to EnverBridge, it’s time to check whether there is a failure interface of LCD.
  • Page 11: Maintain Periodically

    2. Check if the cables are damaged or aged. This check should be performed at least every 6 months. 3. Check for dust or debris. It there’s dust and or debris on EnverBridge, clean it lightly by brush or vacuum the unit to remove dust particles, which may cause components inside overheat.
  • Page 12: Contact