Engine Mount Installation; Mounting The Engine - Seagull RANS S-20 RAVEN-20cc Assembly Manual

Table of Contents

Advertisement

Fuel pick up tube.

ENGINE MOUNT INSTALLATION.

1) Locate the items necessary to install
the engine mount included with your
model.
4x30mm
2) Use four 4x30mm head bolts and four
4mm washers to attach the engine mount
rails to the firewall. Tighten the screws .
Make sure to use threadlock on the screws to
help prevent them from vibrating loose.
Thread locker glue.

MOUNTING THE ENGINE.

1) Position the engine with the drive
washer (145mm) forward of the firewall
as shown.
Vent tube.
Fuel fill tube.
.
145mm
2) Use a pin drill and 4mm drill bit to
drill a small indentation in the mount for
the engine mounting screw.
4mm
3) Use a drill to drill the four holes in the
engine mount rails.
4mm
15

Advertisement

Table of Contents
loading

Related Products for Seagull RANS S-20 RAVEN-20cc

Table of Contents