Hot water storage for use with heat pumps and boilers

Advertisement

Quick Links

STAINLESSLITE PLUS
BUFFER STORE
HOT WATER STORAGE FOR USE WITH
HEAT PUMPS AND BOILERS
DESIGN, INSTALLATION & SERVICING
ONE NAME. EVERY SOLUTION.
INSTRUCTION MANUAL
WWW.GLEDHILL.NET

Advertisement

loading
Need help?

Need help?

Do you have a question about the STAINLESSLITE PLUS and is the answer not in the manual?

Questions and answers

Summary of Contents for gledhill STAINLESSLITE PLUS

  • Page 1 STAINLESSLITE PLUS BUFFER STORE HOT WATER STORAGE FOR USE WITH HEAT PUMPS AND BOILERS INSTRUCTION MANUAL DESIGN, INSTALLATION & SERVICING ONE NAME. EVERY SOLUTION. WWW.GLEDHILL.NET...
  • Page 2 Benchmark places responsibilities on both manufacturers and installers. StainlessLite Plus Buffer Store is produced under an iso 9001:2008 The purpose is to ensure that customers are provided with the correct quality management system approved by bsi.
  • Page 3 DESIGN Buffer vessels are simply a duplex stainless steel tank that contains a Please Note:- volume of water. Buffer vessels are used in heating systems to decouple Any heat source, heat pump, boiler or other source used in a sealed the heat sources from the heat demands, in the same way a hot water system must incorporate a certified overheat protection device and cylinder decouples the hot water demands from the boiler.
  • Page 4 HCFC free foam cased in a steel shell and has an ozone depletion potential (ODP) of zero and a global warming potential (GWP) of 2. The specification of the models are shown in the following tables. StainlessLite Plus Direct Buffer Store Technical Specification Description 120D...
  • Page 5: Technical Data

    DESIGN StainlessLite Plus Indirect Buffer Store Technical Specification Description 120IND 210IND 300IND 400IND Product stock code PLUIN120B PLUIN210B PLUIN300B PLUIN400B Energy efficiency class watts Heat loss kWh/24h 0.94 1.49 2.06 2.09 Capacity litres Height 1494 1990 2030 Diameter Weight (empty)
  • Page 6 DESIGN StainlessLite Plus Flexible Buffer Store Technical Specification Description 90FLX 120FLX 210FLX 250FLX 300FLX 400FLX Product stock code PLU090MB PLU120MB PLU210MB PLU250MB PLU300MB PLU400MB Energy efficiency class watts Heat loss kWh/24h 0.77 0.94 1.49 1.78 2.06 2.09 Capacity litres Height...
  • Page 7 DESIGN Sizing the Buffer store to the Heat pump Buffer stores should be sized as per the table below (source paragraph 4.5 BS EN 15450). Heat Pump Sizing Cylinder capacity Heat pump output 90 litres 2.6kW - 7.5kW 120 litres 3.4kW - 10kW 210 litres 6kW - 17.5kW...
  • Page 8: Installation

    INSTALLATION A typical example where a heat pump is supplying a StainlessLite Plus direct buffer store which in turn is supplying a sealed under floor heating system Sealed system kit Buffer Store Heat pump Underfloor heating A typical example where a heat pump is supplying an...
  • Page 9 INSTALLATION A typical example where a heat pump is supplying a StainlessLite Plus direct buffer store which in turn is supplying the heating system and Hot water StainlessLite Plus Heat Pump cylinder Motorised Valve StainlessLite Energy cut-out Heat Pump (Not supplied)
  • Page 10 At the time of commissioning, complete all relevant sections of the Benchmark Checklist located on the inside back pages of this document. This must be completed during commissioning and left with the product to meet the Warranty conditions offered by Gledhill. COMMISSIONING Page 10...
  • Page 11 APPENDIX APPENDIX A Page 11...
  • Page 12 APPENDIX MANUAL HANDLING OF APPLIANCE PRODUCTS Description e. Taking the lead for team lifts- As more than one person is required for these products ensure that one Manual handling means any transporting or supporting of a load (including lifting, person is taking the lead. This may putting down, pushing, pulling, carrying or moving) by hand or bodily force.
  • Page 13 NOTES Page 13...
  • Page 14 NOTES Page 14...
  • Page 15 NOTES Page 15...
  • Page 16: Terms And Conditions

    IT SHOULD BE NOTED THAT THE FACTORY FITTED TEMPERATURE AND PRESSURE RELIEF VALVE (i) economic loss which shall include loss MUST NOT BE REMOVED OR ALTERED IN ANY WAY OR THE GUARANTEE WILL NOT BE VALID. GLEDHILL WILL of profits, business revenue, goodwill or NOT BE RESPONSIBLE FOR ANY CONSEQUENTIAL LOSS OR DAMAGE HOWEVER IT IS CAUSED.
  • Page 17 PRODUCT DEVELOPMENT events, namely :- Gledhill have a policy of continuous product development (i) if the Purchaser fails to make payment in full for the goods within the time stipulated in clause 4 hereof. and may introduce product modifications from time to time.
  • Page 18 demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference. Failure to install and commission this equipment to the manufacturer’s instructions may invalidate the warranty but does not affect statutory rights. MAINS PRESSURE HOT WATER STORAGE SYSTEM COMMISSIONING CHECKLIST Customer name: Telephone number: Address:...
  • Page 19 SERVICE RECORD It is recommended that your hot water system is serviced regularly and that the appropriate Service Record is completed. Service Provider Before completing the appropriate Service Record below, please ensure you have carried out the service as described in the manufacturer’s instructions. SERVICE 01 SERVICE 02 Date:...
  • Page 20: For Technical Support

    T: 01253 474550 enquiries@gledhill.net WWW.GLEDHILL.NET Due to a programme of continuous improvement Gledhill Building Products reserve the right to modify products without prior notice. It is advisable to check the product technical detail by using the latest design and installation manuals available from our technical support team or on our website.It is an offence...