INTRODU CTION
This document explains how to install the plug-in
ABB OVR Surge Protective Devices (SPDs) for
telephone and ISDN lines:
OVR TN/RJ11-2/6
protects the middle 2 (of 6) conductors on
telephone lines with RJ11 connections.
OVR TN/RJ11-4/6
protects the middle 4 (of 6) conductors on
telephone lines with RJ11 connections.
OVR TN/RJ11-6/6
protects all 6 conductors on telephone lines with
RJ11 connections.
OVR ISDN/RJ45-4/8
protects the middle 4 (of 8) conductors on S/T
interface ISDN lines with RJ45 connections.
OVR ISDN/RJ45-8/8
protects all 8 conductors on S/T interface ISDN
Installation instructions
lines with RJ45 connections.
ESP M1/M1R mains protectors
1.4 Connect to phase(s), neutral and earth.
NOTE: Units must have a neutral
connection (see 3.4).
1. Safety note:
Safety note:
1.5 Units installed at power distribution
boards can be installed either:
Warning! Installation by person with
-
on the load side of the incoming
Warning! Installation by person with
isolator
electrotechnical expertise only.
electrotechnical expertise only.
-
on the closest available out going way to
Warnung! Installation nur durch
the incoming supply
elektrotechnische Fachkraft.
Avvertenza! Fare installare solo da un
Warnung! Installation nur durch
1.6 Provide a means of isolation for the
elettricista qualificato.
ESP unit.
elektrotechnische Fachkraft.
Avertissement! Installation uniquement par
1.7 The connecting leads to phase/live
des personnes qualifiées en électrotechnique.
terminals should be suitably fused
Advertencia! La instalación deberá ser
(up to 125 Amps) ensuring full
realizada únicamente por electricistas
Avvertenza! Fare installare solo da un
discrimination with the immediate
especializados.
upstream supply fuse.
elettricista qualificato.
ESP protector installation should be
1.8 Connecting leads should be 10 mm
conducted by a qualified competent person
multi-stranded copper conductor
and comply with all relevant Regulations and
Avertissement! Installation uniquement par
(terminals can accept up to 25 mm
Legislation (including BS 7671 Wiring
Regulations and Building Regulations).
des personnes qualifiées en électrotechnique.
1.9 Keep the connecting leads as short as
Incorrect installation will impair the
possible and ideally less than 25 cm
effectiveness of ESP protectors.
(10 inches) in length. This may be better
achieved with the equivalent M1R
Always handle cables by their insulation.
Advertencia! La instalación deberá ser
remote display variant which permits
Never work on ESP protectors, earthing or
optimum positioning of both protector
realizada únicamente por electricistas
their cables during a storm.
and display.
especializados.
1.10 Bind the connecting leads tightly
1.
Key points of installation
over their entire length.
1.1 Install protectors very close to the power
A protector on the mains power supply to
1.11 Maximum torque for power terminals is
supply to be protected, either within the
distribution panel or directly alongside it.
2.9Nm, wire stripping length 17mm.
equipment is also recommended in addition to
1.12 Maximum torque for remote contact is
1.2 Mount units within a panel or WBX
protection on telephone & ISDN lines.
enclosure.
0.25Nm, wire stripping length 7mm.
1.3 Units are installed in parallel.
Installation Instructions for Mains Wire-In Protectors | 1
2. Before installation
2.1 Make sure that the system's maximum line
voltage (DC or AC peak) will never exceed the
maximum working voltage of the SPD.
Otherwise the SPD will clamp signal voltages
as though they were transient overvoltages.
Maximum Working
Voltage
OVR TN/RJ11
296 V
OVR ISDN/RJ45
58 V
2.2 Make sure that the SPD's plug and socket
connections are physically compatible with
those connecting the equipment to the
telephone (or ISDN) line.
2.3 Ensure that the current passing through the
SPD does not exceed 300 mA.
3. Installation
3.1 Connection
The SPD is connected in series with the
telephone (or ISDN) line (see Figures 1 and 2).
1
Simply plug it into the telephone socket and
plug the protected equipment into the SPD.
Note: The mains power input to equipment
should also be protected.
3.2 Mounting
Fixing holes on the base of the unit enable it
to be screwed to any flat surface.
Before doing so, ensure that it is close to a
good earthing point (see Section 3.4
2
- Earthing).
2
).
3.3 Keep clean cables away from dirty cables
The outgoing clean cable (ie from the SPD's
socket end) should never be routed next to
the incoming dirty line cable (the SPD's cable
end) or the dirty earth cable
(see Figure 3).
The clean cable must be kept at least 5 cm
apart from either the SPD's dirty cable, or
those of neighbouring units.
If the SPD's dirty line cable is longer than
required, neatly coil and bind the surplus out
of the way, keeping this away from clean
cables.
3.4 Earthing
The SPD must be connected to a good
electrical earth, either:
a) through installation on a TS36 'top hat' DIN
rail (which in turn is connected to earth), or
b) by connecting a crimped 10mm² stranded
green/yellow cable should be used to bond
the SPD's earth stud to earth.
This SPD earth bond should be less than
1 metre long (otherwise the effectiveness of
the SPD will be reduced).
Ideally the SPD would be connected to the
main electrical earth or earth star point
(located at a distribution board) (see Figure
4, overleaf).
LINE
ELECTRONIC SYSTEMS PROTECTION
Plug-in Lightning Barrier
Wilford Road,
Nottingham,
NG2 1EB, UK
To Telephone
Socket
EARTH
Figure 1:
Plug-in series connection for OVR TN/RJ11-2/6, 4/6 and 6/6.
LINE
ELECTRONIC SYSTEMS PROTECTION
Plug-in Lightning Barrier
Wilford Road,
Nottingham,
NG2 1EB, UK
To ISDN
Line
EARTH
Figure 2:
Plug-in series connection for OVR ISDN/RJ45-4/8 and 8/8.
However, owing to the 1 metre (maximum)
earth bond, the SPD will often be hard-wired
to the ring main earth.
Never connect the SPD to earth via the earth
pin of a plug, as this may be removed.
If the earth bond is more than 1 metre from
the SPD, earth bonds of 2, 3 or 4 metres are
allowed if 2, 3 or 4 parallel earth bonds are
used. These must be kept at least 5 cm apart
from each other.
The SPD or base plate earth bond should be
less than 1 metre long (otherwise the
effectiveness of the SPD will be reduced).
10 mm² stranded green/yellow cable should
be used for this bond.
SPD or base plate earth bonds of 2, 3 or
4 metres are allowed if:
2, 3 or 4 parallel earth bonds are used and
these parallel earth bonds are kept at
least 5 cm apart from each other
CLEAN
From
Equipment
CLEAN
From
Equipment
Where even 4 metres of connecting lead is
not sufficient, the incoming cable should be
re-routed to bring it within 4 metres of the
earth.
In circumstances where the cable cannot
ideally be re-routed, the SPD can alternatively
be connected to the electrical earth local to
the equipment being protected (eg the earth
bar of the local power distribution board)
(see Figure 4).
ELECTRONIC SYSTEMS PROTECTION
Plug-in Lightning Barrier
Wilford Road,
Nottingham,
NG2 1EB, UK
ELECTRONIC SYSTEMS PROTECTION
Plug-in Lightning Barrier
Wilford Road,
Nottingham,
NG2 1EB, UK
ELECTRONIC SYSTEMS PROTECTION
Plug-in Lightning Barrier
Wilford Road,
Nottingham,
NG2 1EB, UK
ELECTRONIC SYSTEMS PROTECTION
Plug-in Lightning Barrier
Wilford Road,
Nottingham,
NG2 1EB, UK
ELECTRONIC SYSTEMS PROTECTION
Plug-in Lightning Barrier
Wilford Road,
Nottingham,
NG2 1EB, UK
ELECTRONIC SYSTEMS PROTECTION
Plug-in Lightning Barrier
Wilford Road,
Nottingham,
NG2 1EB, UK
Figure 3:
Cable routeing.
... continued overleaf

Advertisement

loading

Summary of Contents for ABB OVR TN Series

  • Page 1 (DC or AC peak) will never exceed the of the way, keeping this away from clean to the ring main earth. re-routed to bring it within 4 metres of the ABB OVR Surge Protective Devices (SPDs) for maximum working voltage of the SPD. cables. earth.
  • Page 2 Consider the protection of the environment! Used electrical and electronic equipment must NOT be disposed of with domestic waste. The device contains valuable raw materials which can be recycled. Therefore, contact ABB for disposal of this equipment. Notes Contact us...

This manual is also suitable for:

Isdn seriesOvr tn/rj11-4/6Ovr tn/rj11-2/6Ovr tn/rj11-6/6Ovr isdn/rj45-4/8Ovr isdn/rj45-8/8