1969 CAMARO w/o FACTORY AIR Table of Contents PAGES COVER TABLE OF CONTENTS PACKING LIST INFORMATION PAGE PASSENGER COMPARTMENT FIGURE 1 CONTROL CABLE INSTALLATION FIGURES 2-4 FIREWALL COVER INSTALLATION FIGURES 5 & 5A EVAPORATOR INSTALLATION FIGURES 6-7B EVAPORATOR INSTALLATION CONT. FIGURES 8-8C DUCT HOSE INSTALLATION FIGURE 9 ENGINE COMPARTMENT FIGURE 10...
Page 3
1969 CAMARO w/o AC ACCESSORY KIT ** BEFORE BEGINNING INSTALLATION OPEN ALL PACKAGES AND CHECK CONTENTS OF SHIPMENT. PLEASE REPORT ANY SHORTAGES DIRECTLY TO VINTAGE AIR WITHIN 15 DAYS. AFTER 15 DAYS, VINTAGE AIR WILL NOT BE RESPONSIBLE FOR MISSING OR DAMAGED ITEMS.
Page 4
HEATER HOSE FROM VINTAGE AIR(31800-VUD) OR FROM YOU LOCAL PARTS RETAILER SAFETY SWITCHES: YOUR VINTAGE AIR SYSTEM IS EQUIPPED WITH A BINARY PRESSURE SAFETY SWITCH. A BINARY SWITCH (11078-VUS) DISENGAGES THE COMPRESSOR CLUTCH IN CASE OF EXTREME LOW PRESSURE CONDITION (REFRIGERANT LOSS) OR EXCESSIVELY HIGH HEAD PRESSURE (406 PSI), TO PREVENT COMPRESSOR DAMAGE OR HOSE RUPTURE.
1969 CAMARO w/o FACTORY AIR INSTALLATION INSTRUCTIONS 1969 CAMARO w/o FACTORY AIR BEFORE STARTING THE INSTALLATION, CHECK THE FUNCTION OF THE VEHICLE (HORN, LIGHTS, ETC.) FOR PROPER OPERATIONS. STUDY THE INSTRUCTIONS, ILLUSTRATIONS, & DIAGRAMS. PASSENGER COMPARTMENT DISCONNECT BATTERY REMOVE AND DISCARD THE OEM HEATER ASSEMBLY (#1). REMOVE AND DISCARD THE OEM DEFROSTER DUCT (#2).
1969 CAMARO w/o FACTORY AIR FIGURE 2 CONTROL CABLE INSTALLATION REMOVE & REMOVE AND DISCARD (3) OEM CONTROL DISCARD CABLES FROM CONTROL PANEL. SEE FIGURE 2. ATTACH NEW CABLES (PROVIDED) TO CONTROL PANEL LEVERS AS SHOWN IN CONTROL FIGURE 3 BELOW. PANEL BACK POSITION LEVERS AS SHOWN IN FIGURE 4 BELOW.
1969 CAMARO w/o FACTORY AIR FIREWALL COVER INSTALLATION USE THE OEM HEATER MOUNTING HOLE IN FIREWALL TO MOUNT THE FIREWALL COVER. APPLY A 1/4” BEAD OF SILICONE AROUND THE PERIMETER OF THE FIREWALL COVER AND INSTALL. SECURE USING (4) 1/4 x 1” HEX BOLTS WITH FLAT WASHERS, SEE FIGURE 5 BELOW. USE OEM HOLES IN THE FIREWALL TO MOUNT FIREWALL COVER...
1969 CAMARO w/o FACTORY AIR EVAPORATOR INSTALLATION INSTALL THE (2) DEFROSTER VENTS UNDER DASH AS SHOWN IN FIGURE 6 BELOW. SECURE USING (2) #8 x ½” PH PAN HEAD SCREWS. INSTALL THE NEW DRIVER & PASSENGER SIDE FRESH AIR COVERS, SECURE USING OEM HARDWARE.
1969 CAMARO w/o FACTORY AIR EVAPORATOR INSTALLATION CONT. FIRST ATTACH DRIVER SIDE MOUNTING BRACKET IN OEM HOLE IN RADIO BRACKET USING OEM SCREW AS SHOWN IN FIGURE 8A BELOW. RAISE THE EVAPORATOR UNIT UP UNDER THE DASH AND ALIGN THE JACK-NUT IN THE EVAPORATOR UNIT WITH THE OEM HOLE IN FIREWALL (SEE FIGURE 5, PAGE 7).
1969 CAMARO w/o FACTORY AIR DUCT HOSE INSTALLATION STRETCH THE DUCT HOSE OUT TO ITS MAXIMUM LENGTH AND CUT TO SIZES SHOWN. ROUTE DUCT HOSES TO CORRESPONDING LOUVERS AS SHOWN IN FIGURE 9 BELOW. NOTE: FOR MAXIMUM AIR FLOW MAKE SURE DUCT HOSES ARE PULLED TIGHT AND HAVE NO KINKS OR SHARP BENDS.
Page 11
1969 CAMARO w/o FACTORY AIR CONDENSER ASSEMBLY THE CONDENSER ASSEMBLY MOUNTS TO THE FRONT SIDE OF THE CORE SUPPORT. LOWER CONDENSER ASSEMBLY INTO POSITION. BE SURE THE TOP BRACKET IS BEHIND (FRONT LIP) FLANGE ON TOP OF THE CORE SUPPORT. FASTEN DRIVER SIDE LOWER CONDENSER BRACKET TO CORE SUPPORT USING 5/16"...
Page 12
1969 CAMARO w/o FACTORY AIR CONDENSER INSTALLATION 10/24 (2) 5/16 U-NUT 10/24 x 3/8 STAR-NUT MOUNTED TO CORE O.E.M BOLT CONDENSER SUPPORT BOLT BRACKET BACK FRONT BACK FRONT TOP CONDENSER BRACKET (BEHIND CORE SUPPORT) 10/24 10/24 x 3/8 STAR-NUT BOLT DRIER S E R BRACKET...
Page 13
1969 CAMARO w/o FACTORY AIR CONDENSER INSTALLATION CONT. LOCATE THE TWO #8 HARDLINES AND O-RINGS,INSTALL ON CONDENSER AND DISCHARGE HOSE. SEE FIGURE 13 BELOW AND FIGURE 12, PAGE 12. FASTEN THE HARDLINE TO THE FRONT OF THE DRIVER'S INNER FENDER PANEL WITH A #4 ADEL CLAMP AND A #10/32 x 1/2”...
Page 14
1969 CAMARO w/o FACTORY AIR A/C HOSE INSTALLATION STANDARD HOSE KIT LOCATE THE #8 COMPRESSOR A/C HOSE. LUBRICATE (2) #8 O-RINGS (SEE FIGURE 1 1a, PAGE 11 ) AND CONNECT THE 135° w/ 134a SERVICE PORT FITTING TO THE #8 DISCHARGE PORT ON THE COMPRESSOR. ROUTE THE STRAIGHT MALE FITTING TO THE #8 CONDENSER HARDLINE.
Page 15
1969 CAMARO w/o FACTORY AIR HEATER HOSE & HEATER CONTROL VALVE INSTALLATION ROUTE A PIECE OF HEATER HOSE FROM THE WATER PUMP TO THE FIREWALL AND ATTACH IT TO THE HEATER LINE FROM EVAPORATOR AS SHOWN IN FIGURES 14a, BELOW. SECURE USING HOSE CLAMPS. ROUTE A PIECE OF HEATER HOSE FROM THE INTAKE MANIFOLD, TO THE FIREWALL AND ATTACH IT TO THE HEATER LINE FROM EVAPORATOR AS SHOWN IN FIGURES 14a, BELOW.
Page 16
1969 CAMARO w/o FACTORY AIR FRESH AIR 1/4-20 x 1” EVAPORATOR BOLT w/ WASHER FRESH AIR COVER INSTALLATION APPLY A 1/4” BEAD OF SILICONE AROUND THE BACK SIDE OF THE FRESH AIR CAP AS SHOWN IN FIGURE 15. ATTACH FRESH AIR CAP TO FIREWALL USING A 1/4-20 SILICONE x 1"...
Page 17
EVACUATE THE SYSTEM AT LEAST 30 MINUTES AND CHARGE ACCORDING TO CAPACITIES ON INSIDE COVER PAGE. CHECK COMPLETE A/C ASSEMBLY FOR PROPER OPERATION. VINTAGE AIR RECOMMENDS THAT ALL A/C SYSTEMS BE SERVICED BY A CERTIFIED AUTOMOTIVE AIR CONDITIONING TECHNICIAN ONLY. SEE INSIDE COVER FOR SERVICE INFORMATION. 905070-VCZ-A 11/22/05 , 69 CAMARO w/o FAC.
Page 19
1969 CAMARO w/o FACTORY AIR WIRING DIAGRAM 1969 CAMARO w/o FACTORY AIR WHITE VENT ENGINE VACUUM TUBING (BLACK) HEATER VALVE VACUUM TUBING (RED) CENTER LOUVER TEMPLATE PLACE ALONG EDGE OF DASH BOARD START ON CENTER LOUVER TEMPLATE OEM MARK 2 ½” ON DASH BOARD 7 3/4”...
Need help?
Do you have a question about the 55070-VCZ-A and is the answer not in the manual?
Questions and answers